ML20133D335
| ML20133D335 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/06/1997 |
| From: | Raghavan L NRC (Affiliation Not Assigned) |
| To: | Beard P FLORIDA POWER CORP. |
| Shared Package | |
| ML20133D338 | List: |
| References | |
| TAC-M96695, NUDOCS 9701090146 | |
| Download: ML20133D335 (1) | |
Text
)
January 6, 1997 Mr. Percy M. Beard, Jr.
s Senior Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing (SA2A)
Crystal River Energy Complex 15760 W Power Line Street i
Crystal River, Florida 34428-6708 l
SUBJECT:
CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 - LICENSE AMENDMENT FOR ESAS SURVEILLANCE (TAC N0. M96695)
Dear Mr. Beard:
The Commission has issued the enclosed Amendment No.155 to Facility Operating License No. DPR-72 for the Crystal River Unit No. 3 Nuclear Generating Plant (CR3}. The amendment consists of changes to the Technical Specifications (TS) l in response to your application dated September 23, 1996, to delete a note for l
the Surveillance peauirement (SR) SR 3.3.7.1 for the Engineered. Safeguard i
Actuation System (ESA5) Logic.
The NOTE allowed delaying entry 1.;to l
applicable Conditions and Required Actions for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> during periodic l
testing of the ESAS automatic actuation logic matrix.
The revised TS has I
eliminated the NOTE and requires entry into applicable TS Conditions during 1
the performance of the ESAS test.
l l
A copy of the Safety Evaluation is also en':losed. The Notice of Issuance will be included in the Commission's biweek1, f9deral Reaister notice, l
l Sincerely, l
l Original signed by l
L. Raghavan, Project Manager l
Project Directorate II-3 r
l Division of Reactor Projects I/II l
Office of Nuclear Reactor Regulation l
Docket No. 50-302 s
t
(
Enclosures:
1.
Amendment No.iS5 to DPR-72 2.
Safety Evaluation ci w/ enclosures: See next page Distribution Docket File Public i
Crystal Rdg.
S. Varga NRC FILE CENTER COPY Ji S: "E"es SCR "()
\\ W u) l ;' I T. Harris [TLH3] (1tr/SE)
,~mr DOCUMENT NAME: G:\\ CRYSTAL \\96695.AMD I~
i To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure T" - Copy with attachmut/ enclosure "N" - No copy OFFICE POII 3/PM P0ll*3/LA
,l9 POII 3/D
,}
l r,1 OGC6sfd j
HICS hf lE a
i NAME LReghavan #
BClayton /MV FHebdon hcf f#8/0/fgf asp, -p JWerin\\ht DATE 12/10 /96 12/le/96 '
43W9& t// /? 7 12/ D /96 12/2 6/96 OFFICIAL RECORD COPY
, gggg
'q 9701090146 970106 8*d E '%po PDR ADOCK 05000302
\\
a