ML20133D258
| ML20133D258 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 07/29/1985 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | Mittl R Public Service Enterprise Group |
| References | |
| NUDOCS 8508070277 | |
| Download: ML20133D258 (6) | |
Text
O E
O Docket No. 50-354 DISTRIBUTION iDocket file JPartlow NRC PDR BGrimes Local PDR EJordan tir. R. L. !!itti, General Manager PRC Systen SRhow liuclear Assurance and Regulation NSIC JStrosnider Public Service Electric & Gas Company LBt2 Reading ABlough P. O. Box 570, T22A EHylton Newark, New Jersey 07101 DWagner Dewey,0 ELD
Dear Mr. liitti:
ACRS (16)
SUBJECT:
POWER SYSTEllS BRANCH - ELECTRICAL AUDIT OF HOPE CREEK As discussed with Mr. Bruce Preston of your staff, the staff will perform the Power System Bran:h - Electrical Audit of Hope Creek on August 7 and 8, 1985. The audit will consist of a tour of the facility (features to be seen are identified in the Enclosure) and working-level meetings with your staff to resolve all outstanding Safety Evaluation Report open and confirmatory issues in the electrical power systems area.
An exit meeting ias been scheduled for 3:00 p.m. on August 8, 1985. At this meeting, the staff will suruarize its firdings and will identify any necessary follow-up actions to be perfonned.
l Please call us if you have any questions concerning this dudit.
Sincerely, origioni stev,ed bv:
Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing
Enclosure:
As stated cc: See next page 3
LBtT/;
M LB#2/DL/8C DWagner:lb WButler 07/)p85 07/pB5 E0$$d SM334 PDR l
g
,k UNITED STATES
{
g NUCLEAR REGULATORY COMMISSION 7.
- j WASHINGTON, D. C. 20555
'JUL 2 9 1985 Decket No. 50-354 Mr. R. L. Mitti, General fianager Nuclear Assurance and Regulation Public Service Electric & Gas Company P. O. Box 570, T22A Newark, New Jersey 07101
Dear fir. Mitti:
SUBJECT:
POWER SYSTEl15 BRANCH - ELECTRICAL AUDIT OF HOPE CREEK As discussed with Mr. Bruce Preston of your staff, the staff will perform the Power System Branch - Electrical Audit of Hope Creek on August 7 and 8, 1985. The audit will consist of a tour of the facility (features to be seen are identified in the Enclosure) and working-level meetings with your statf to resolve all outstanaing Safety Evaluation Report open and confirmatory issues in the electrical power systems area.
An exit meeting has been scheduled for 3:00 p.m. on August 8, 1985. At this meeting, the staff will summarize its findings and will identify any necessary follow-up actions to be performed.
Please call us if you have any questions concerning this audit.
Sincerely, Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing
Enclosure:
As stated cc: See next page
Mr. R. L. Hitti Public Service Electric & Gas Co.
Hope Creek Generating Station cc:
Gregory Minor Susan C. Renis Richard hubbard Dale Bridenbaugh Division of Public Interest Advocacy MHB Technical Associates New: Jersey State Department of the Public Advocate 1723 Hamilton Avenue, Suite K Richard J. Hughes Justice Comples San Jose, California 95125 CN-850 Trenton, New Jersey 08625 Trcy 8. Conner, Jr. Esquire Conner & Wetterhahn Office of Legal Counsel 1747 Pennsylvania Avenue H.W.
Department of Natural Resources and Environmental Control Washington, D.C.
20006 89 Kings highway P.O. Box 1401 Dover, Delaware 19903 Richard Fryling, Jr., Esquire V
Associate General Solicitor Mr. K. W. Burrowes, Project Engineer Bechtel Power Corporation Public Service Electric & Gas Company 50 Beale Street P. O. Box 570 TSE P. O. Box 3965 Newark, New Jersey 07101 Sar. Francisco, California 94119 Resident Inspector
!!r. J. M. Ashley U.S.N.R.C.
Senior Licensing Engineer P. O. Box 241 c/o Public Service Electric & Gas Co.
Bethesda Office Center, Suit 550 Hancocks Bridge, New Jersey 08036 4520 East-West Highway Bethesda, Maryland 20814 Richard F. Engel Deputy Attorney General fir. A. E. Giardino Division of Law Environmental Protection Section Manager - Quality Assurance E&C Public Service Electric & Gas Co.
Richard J. Hughes Justice Complex P. O. Box A CN-112P Trenton, New Jersey 08625 Hancocks Bridge, New Jersey 08038 Mr. Robert J. Touhey, hr. Anthony J. Pietrofitta Acting Director General Manager DNREC - Division of Power Production Engineering Environmental Control Atlantic Electric 89 Kings Highway 1199 Black Horse Pike P. O. Box 1401 Pleasantville, New Jersey 08232 Dover, Delaware 19903 Mr. R. S. Salvesen Regional Administrator, Region I U. S. Nuclear Regulatory Connission General Manager-Hope Creek Operation 631 Park Avenue l
Public Service Electric & Gas Co.
P.O. Box A King of Prussia, Pennsylvania 19406 Hancocks Bridge, New Jersey 08038
Public Service Electric & Gas Co. Hope Creek Generating Station cc:
fir. C. A. Preston Project Licensing Manager Public Service Electric & Gas Co.
P. O. Box 570 T22A Newark, New Jersey 07101 Ms. Rebecca Green New Jersey Bureau.of Radiation Protection -
380 Scotch Road Trenton, New Jersey 08628 r
(
1 I
i O
1
.,, ~.....
Enclosure HOPE CREEK FG;ER SYSTEMS BRANCH - ELECTRICAL SITE VI51T 1.
Control Room a.
General layout b.
Diesel control boara, D/G inoperable status alarn C6bling in control room (separation) c.
ESF initiation anc bypass switch arrangement and status panel d.
e.
Ann'unciator panel f..
DC systen nonitoring and alarm g.
Nuclear ard reactor protection instrument cabinet arrangement, separation and identification 2.
Cable Runs and Cable Spreading a.
General layout b.
Degree of separation Tray or wireway density (percentage fill) c.
d.
Penetrations and cable terminations Identification of cables and raceways e.
3.
Switch Gear Rooms a.
General layout b.
Physical and electrical separation or redundant units c.
Cable installation 4.
Battery and Charger Installations a.
General layout b.
Physical and electrical separation c.
Ventilation independence d.
Monitoring instrumentation and alarms 5.
Diesel Generator a.
General layout b.
Physical and electrical separation of redundant units c.
Fuel supply syster.is d.
D/G local control panels, instruments and control Auxiliary systens-starting air, combustion air, e.
ventilation, engine cooling 6.
Switch Yard a.
General layout L
b.
Physical and electrical separation of transnission lines, buses, breakers c.
Relay house d.
Control power supplies (AC and DC)
2-7.
Reactor Building a.
General layout b.
Separation of piping and cabling to redundant equipment
- 8. -
Steam Lines-Flow path below MSIV's - source of control (local, control room etc.)
9.
Shutdown outside Control Room Ren~ote shutdown panel arrangement, separation ana layout a.
b.
Identificiation of control and monitoring equipment
- 10. ESF Systems and Pump Rocts a.
General layout b.
Physical and electrical separation of redundant equipment c.
Cable and raceway laycut d.
Identification of cables, raceways and equipment l
- 11. Vital Instrumentation Power Supply Installation c
a.
General layout b..
Physical and electrical separation 4
c.
Honitoring instrumentation
'd.
Cable and raceway layout
' Identification of cables, racr.p3ys and equipment e..
i 4
O 1
e y
m--e
+
.m, m-
--,, - --