ML20133D131
| ML20133D131 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 07/31/1985 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20133D135 | List: |
| References | |
| NUDOCS 8508070243 | |
| Download: ML20133D131 (2) | |
See also: IR 05000416/2006011
Text
_ _ - - _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ -
_ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _
JUL 311985
,
Docket No. 50-461
Illinois Power Company
ATTN:
Mr. W. C. Gerstner
J
Executive Vice President
500 South 27th Street
Decatur, IL 62525
i
Gentlemen:
This refers to the special safety inspection conducted by Mr.R. S. Love of,
this office on April 16 through June 11, 1985, of activities at Clinton Power
Station authorized by NRC Construction Permit No. CPPR-137 and to the discussion
of our findings With Mr. D. P. Hall and others of your staff at the conclusion
of the inspection.
,
,
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
,
,
examination of procedures and representative records, observations, and
'
'
interviews with personnel.
'
No violations or deviations with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
!
this letter and the enclosure (s) will be placed in the NRC Public Document
Room.
'
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
Crigini Signed by J. J. Harrison
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Report
No. 50-461/85022(DRS)
See Attached List For Distribution
!
!
l
i
i
a
8508070243 850731
i
ADOCK 05000461
i
G
i} l
i
-. _
.
. - -
--.
. , - - _ - - _ - _ _ - . . . . - . - - - _ .
. .-
.Yk
. .-
.
O
~gi
v.
,
i
3
.
2
JUL 311985
Illinois Power Company
>
,
~
Distribution
.
cc w/ enclosure:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
~ Richard Hubbard
Gary N. Wright, Manager
Nuclear Facility Safety
Jean Foy, Prairie Alliance
Allen Samelson, Assistant
'
Attorney General,
Environmental Control Division
H. S. Taylor, Quality Assurance
Division
'l
i+
s
.
1.
i
t
1
.
4
'
b
1es
R
RIII
RIII
II
RI g'
ki
hs
k
wi
rrison
Love ja
.7[2i[85
1\\~h\\
07/17/85
. e.a
dY[
_