Category:INSPECTION REPORT
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs PNO-IV-99-040, on 990924,licensee Was Replacing Motor Operator for Suction Valve on B Recirculation Loop.After Completing Repairs,Operators Plan to Restart Reactor.Info Has Been Discussed with Licensee1999-09-24024 September 1999 PNO-IV-99-040:on 990924,licensee Was Replacing Motor Operator for Suction Valve on B Recirculation Loop.After Completing Repairs,Operators Plan to Restart Reactor.Info Has Been Discussed with Licensee IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19993011999-03-0909 March 1999 NRC Operator Licensing Exam Rept 50-298/99-301 (Including Completed & Graded Tests) for Tests Administered on 990212. Exam Results:Four Reactor Operator License Applicants Passed Exam IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20202E3261999-01-22022 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:Licensee Failed to Take Effective Measures to Preclude Repetition of Inadvertent Opening of torus-to-drywell Vacuum Breaker Documented in LER 50-298/97-007 IR 05000298/19960041999-01-0707 January 1999 Notice of Violation from Insp on 981116-1208.Violation Noted:Deviations from Plant Design Basis Identified as Result of Investigation Following Issuance of Violation 50-298/9604-1013 Not Properly Corrected ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys ML20198J3531998-12-17017 December 1998 Notice of Violation from Insp on 980504-22 & 0608-26. Violation Noted:As of October 1997,licensee Failed to Provide Procedures to Implement Compensatory Measures for Standby Liquid Control Tank Heater Failure,Per USAR ML20197J7321998-12-11011 December 1998 Notice of Violation from Insp on 981004-1114.Violation Noted:On 981001,inspectors Identified That Between 980125- 980125 & 0916,licensee Failed to Properly Maintain Procedures Governing Operation of Reactor Equipment Cooling IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted IR 05000298/19980991998-08-17017 August 1998 SALP Rept 50-298/98-99 for Cooper Nuclear Station for Period of 970112-980711 ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 07100022/20120311998-06-23023 June 1998 Notice of Violation from Insp on 980419-0530.Violation Noted:No Explanation Was Included in Subsequent Annual Radioactive Matls Release Rept & Condition Was Not Repaired in Timely Manner from 971022-1231 IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph ML20249C2481998-05-26026 May 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980506,inspector Observed Group of Visitors Enter Protected Area That Were Not Issued Visitor Badges,Did Not Card in & Did Not Enter Protected Area Through Turnstiles IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2451998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:Procedure 7.2.63 Was Inappropriate to Circumstances & Had No Appropriate Acceptance Criteria,In That Required Torque Value Not Given in Flange Bolt Work Instructions ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217A3681998-03-19019 March 1998 Notice of Violation from Insp on 980302-06.Violation Noted:On Five Separate Occasions,Licensee Mgt Called in Workers to Perform Back Shift Work W/O Providing Transportation or Administering Breathalyser Test IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F8751998-02-23023 February 1998 Notice of Violation from Insp on 971214-980124.Violation Noted:On 971222,while MSL High RM Was Inoperable & Primary Containment Integrity Was Required,Licensee Opened Both Reactor Water Sample Valves IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0391998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:As of 971213,Procedure 6.SC.502,Rev 2,was Not Appropriate to Circumstances in That Did Not Include Appropriate Acceptance Criteria 1999-09-27
[Table view] |
See also: IR 05000298/1996016
Text
.
.
ENCLOSURE 1
U.S. NUCLEAR REGULATORY COMMISSION
REGION IV !
Docket No.: 50-298
License No.: DPR-46
Report No.: 50-298/96-16
Licensee: Nebraska Public Power District
Facility: Cooper Nuclear Station
Location: Nebraska Public Power District
141415th Street
Columbus, Nebraska
Dates: December 2 12,1996
Inspectors: Thomas Meadows, Lead inspector
Howard Bundy, Reactor Engineer
Ryan Lantz, Reactor Engineer
Mary Miller, Senior Resident inspector
Approved By: John L. Pellet, Chief, Operations Branch, DRS
ATTACHMENTS:
Attachment 1: Supplemental Information
Attachment 2: Simulation Facility Report
9701000132 970102
PDR ADOCK 05000298
G pg
1
- l
l
l
l
!
.
EXECUTIVE SUMMARY
Cooper Nuclear Station
NRC Inspection Report 50-298/96-16
l
1
This inspection assessed the licensed operator requalification program to determine '
whether the program incorporated appropriate requirements for evaluating operators'
mastery of training objectives in accordance with 10 CFR 55.59(c). The assessment
included an evaluation of the program's controls to assure a systems approach to training
and evaluation of operating crew performance during annual requalification examinations.
This included review of the facility documents, observation of operating and staff crews
during dynamic simulator scenarios and plant walkthroughs, and an assessment of the
examination evaluators' effectiveness in conducting and evaluating examinations. The '
inspection also included an evaluation of the plant referenced dynamic simulator used to
conduct the examinations and the reference documentation used to produce the i
examinations and some extended control room observations. I
Operations
- Overall, the licensed operator requalification training program effectively
implemented a systems approach to training and maintained the condition of
licenses. However, the inspectors observed some recurring performance
deficiencies in crew command, control, communication, and procedure usage skills
during abnormal emergency operations. The inspectors identified an apparent
weakness in the program's ability to effectively maintain operator performance at
expected levels so that previously identified performance deficiencies and
weaknesses do not reappear. (Sections 04.1,05.1,05.2,05.3,05.4,05.5).
- Licensed operators displayed good communication skills, teamwork, plant system
knowledge, and ownership of plant equipment, with the exception of two crew
failures noted during the simulator evaluations (Sections 01.1, 04.1, F8.1).
- Annual requalification examinations were comprehensive and discriminated at the
appropriate level (Section 05.1).
- The licensed operator requalification f acility evaluators administered the
examinations professionally and in accordance with accepted industry practices
(Section 05.2).
- The licensee's training department was responsive to feedback and revised the
training program as appropriate (Section 05.3).
Plant Suocort
- Plant housekeeping was good (Section F8.1).
.-
.
.
-2-
Report Details
1. Operations
01 Conduct of Operations
!
01.1 Observations of Operator Performance '
a. Insoection Scope (71715)
Using the guidance of Inspection Procedure 71715, " Sustained Control Room and
Plant Observation," the inspectors observed activities in the control room during
normal plant operations. The inspectors compared the observed performance with
expected performance as described in facility policies and procedures. Between
December 9 and 12,1996, the inspector observed three different shift crews for
continuous periods ranging from 2 to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The inspector observed three crew I
turnovers and approxirnately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> of control room operations involving power
operations.
b. Observations and Findinas
The inspector noted that the individual operator turnover briefings were thorough
and detailed, and that both the oncoming and offgoing operators were alert and i
diligent in providing a professional turnover. Post-relief crew briefs were thorough
and comprehensive with each member of the crew providing a status of activities
and equipment for their areas.
The inspector observed consistently good and effective communications in
accordance with management expectations. Operator communications were clear
and unambiguous, and communication support equipment appeared reliable and
adequate. Communications outside the control room were generally formal and
consistently effective.
Control room conduct was formal. The shift supervisor was closely involved in shift
operations. Access to the control room was formally controlled and noise levels
were maintained low and non-distracting to the control board operators. The
licensed senior operator maintained a professional environment in the control room,
which was noteworthy due to the impending startup and increased activity in the
plant and the control room.
Operators routinely exhibited good self checking and peer checking when
manipulating controls. The inspector observed that the operators performed peer
checks on the designated components.
.
.
-3-
c. Conclusions
The inspector concluded that operators exhibited good communication, command
and control, annunciator response, procedure usage, self checking and peer
checking.
1
04 Operator Knowledge and Performance l
l
04.1 Operator Performance on Annual Reaualification Examinations i
a. Insnection Scone (71001)
The inspectors observed the performance of two shift crews during their annual j
requalification evaluations. Each crew was composed of five active licensed I
operators and one shift technical engineer. This Licensed Operator Requalification
Cycle 96-20 began on November 11,1996, and ended on December 20,1996. l
The cycle consisted of an annual operating examination, that included simulator !
dynamic performance evaluations and five job performance measures for each
licensed operator. Also included was a written examination for each operator,
consisting of a simulator static examination and an open reference examination,
it was the conclusion of a two-year licensed operator requalification program.
I
b. Observations and Findinas
Six of eight crews passed all portions of their evaluations. Two crews f ailed the
dynamic simulator evaluation.
The causes for the failures were primarily performance deficiencies in crew
command, control, communication, and procedure usage skills. On December 4-9,
1996, the inspectors observed the dynamic simulator, job performance measures,
and written evaluations for two crews. One of these crews failed, which brought
the total crew failures for this cycle up to two. Two individuals on this crew were
also f ailed, one by missing an individual critical task, and the other on performance
competencies. The licensee evaluators expressed concerns that one of the licensed
reactor operators that was failed on individual competencies may not be competent
to continue to perform license duties and removed the individual from shift for
further evaluation. The licensee's remediation actions are discussed further in
Section 05.4.b below.
Operator performance in the simulator was consistent with that observed in the
control room with the exception of formal communication practices. During
stressful simulator scenario conditions, formal communications would break down
at times. This weakness was most obvious in the two crews that f ailed, but also
apparent, to a lesser degree, in the other six crews evaluated during this cycle.
__ _ _ _ _ _ .
.
.
-4-
The licensee's staff acknowledged that crew communications weaknesses had been
identified and improvements incorporated into the training program through ,
feedback process. !
c. Conclusions
,
The inspectors concluded that, with the exception of two crew failures, which were
primarily caused by performance deficiencies in crew command, control
communication, and procedure usage, the licensed operators exhibited good
knowledge and ability during the requalification examinations.
After the formal remediation and re-examination of the two failed crews were
completed, the inspectors also concluded that all operators had demonstrated an
adequate ability to continue licensed duties with the exception of one reactor
operator who had been failed on competencies.
05 Operator Training and Qualification
05.1 Review of Reaualification Examinations
a. Inspection Scope (71001)
The inspectors performed a review of the annual requalification examinations,
including operating tests and biennial written examination, to evaluate general
quality, construction, and difficulty level. The inspectors also reviewed the
methodology for developing the requalification examinations.
b. Observations and Findinas
The operating examinations consisted of job performance measures and dynamic
simulator scenarios.
The facility utilized the General Electric Owner's Group template evaluation
scenarios as guidance in the development of the scenarios used for the
requalification examinations. The scanarios followed the guidelines of
NUREG 1021," Operator Licensing Examiner Standards," Revision 7, Supplement 1,
in complexity and quantitative event requirements. The scenarios were written with
clear objectives, expected operator actions, and critical task identification and
evaluation criteria.
The job performance measures were adequate in scope and depth, and covered a
broad range of topics as required by the training program and the regulations.
Generally, critical steps were appropriately identified, although the inspectors
identified three job performance measures that contained one to two steps
important to successful task completion that were not annotated as critical steps.
. ~. _ -.
.
.
5-
The inspectors noted that many of the job performance measures required
significantly more time for the applicants to complete than was indicated as the
'
validation time for the task. One task in particular, Job Performance
Measure 201-004," Operate the CRD System to Bring the Reactor Critical," showed
a validation time of 15 minutes. Each of the three licensees observed performing
the task required approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to complete the task, not counting procedure
review prior to beginning rod withdrawal. The inspectors determined that an
inadequate time validation was done on this job performance measure, and this
ultimately impacted the remaining schedule for job performance measures.
Additionally, expectations for the method to complete this task appeared to be
unclear. Each applicant utilized continuous rod withdrawal control differently, from
not at all to the maximum allowed by procedure. During the crew oebrief of
examination results by management and the other evaluators, these expectations
were not clarified, even though the use of continuous rod withdrawal was
addressed. The inspector noted that plant engineering encouraged the use of
continuous rod withdrawal to minimize challenge to the control rod drive system
during startups. The licensee staff acknowledged that the Job Performance l
Measure 201-004 needed re-evaluatic") and that management expectations of the l
use of continuous rod withdrawal control needed to be cbnfied and consistently ;
communicated to engineering, training, and operations. !
'
l
The inspectors determined that the written examinations were of the appropriate
breadth of coverage and depth of knowledge, and of particularly effective
discriminating value.
However, the examination development program, NTP 4.2, " Test item and
Examination Development," Revision 0, was vague with respect to examination
question repeatability criteria. Steps 5.3 - 5.3.3 gave several alternatives to ensure
no compromise of examinations in a given program year or cycle, as follows:
- ". . no examinations will be repeated, with a minimum of 25% of the
questions different from any other examination."
- ". . . sufficient time elapse between examinations to preclude compromise."
The inspector noted that the wording is vague enough to allow more than
50 percent repeat on successive examinations, and that proposed Week 5 and 6 i
written examinations for this year's annual examinations were identical, with the !
exception of two to three questions, to the Weeks 1 and 2 examinations,
respectively.
When questioned as to how examination security would be preserved, the licensee
stated that a procedure change request would be submitted to specify a time period
of 1 month as sufficient time to preclude compromise. The inspectors determined
.
.
-6- !
I
that examination security measures were being followed in accordance with
program requirements and appeared adequate to reasonably prevent physical
compromise of an examination. No compromise events were known or suspected ;
to have occurred during this requalification program cycle. !
c. Conclusions
The inspectors concluded that the examinations were well constructed, challenging,
and discriminated at the appropriate level. The written examination section of the
examination development procedure was interpretive, which presented a potential
challenge to examination security.
The licensee acknowledged that they needed to clarify their written examination
development procedure guidance to preclude a potential challenge to examination
security.
05.2 Examination Administration
I
a. Insoection Scoce (71001) !
The inspectors observed the administration of all aspects of the requalification
examinations to determine the evaluators' abilities to administer an examination and
assess adequate performance through measurable criteria. The inspectors also
noted the fidelity of the plant simulator to support training and examination
administration. The insoectors observed two operations shift crews, of five
licensed operators each, during conduct of the dynamic simulator scenarios and job
performance measure evaluations. Five licensed operator requalification training
evaluators and one operations management evaluator were observed participating in
one or more aspects of administering the examinations, including pre-examination
briefings, observations of operator performance, individual and group evaluations of
observations, techniques for job performance measure cuing, and final evaluation
documentation.
,
'
b. Observations and Findinas
The evaluators conducted the examinations professionally, and thoroughly
, documented observations for later evaluation. Job performance measure cues were
l provided appropriately as needed, with no inadvertent cuing observed.
A formal method of evaluation was used that reviewed crew and individual critical
- tasks following the scenario observations, and then competencies for the crew and
'
for individuals when appropriate. During the simulator evaluations the inspectors
-
noted that the evaluator staff was particularly effective in identifying and proper!y
categorizing operator performance deficiencies and weaknesses. The inspectors
also observed strong operations staff participation. The post-scenario examination
evaluation caucuses were well organized and efficient with the evaluation team
.
.
7
reaching a crisp, accurate consensus on performance results in a timely manner.
This minimized overall crew stress. The inspectors observed that the crews held
independent self-critical caucuses, led by their shift supervisors, who were also
involved with developing remediation plans, when necessary. The inspectors also
observed that shift supervisor ownership for crew and individual performance was a
management expectation and was apparent in most cases.
The inspectors noted that the performance of the simulator in supporting the
examination process was good.
c. Conclusions
The facility evaluators administered the examinations professionally and in
accordance with industry standards. The facility evaluators effectively identified
deficiencies or weaknesses in the trainees to feedback into the training program.
05.3 Review of Trainino Feedback System
a. Insoection Scoce (71001)
The inspectors verified the methods and effectiveness of the licensed operator
requalification training program feedback system.
b. Observations and Findinos
During interviews, licensed operators and training management described several I
methods for providing feedback on the licensed operator requalification training j
program. The inspectors noted that these methods were appropriately covered in ;
training department procedures and guidelines. Written requests could be made
]
with either the training feedback form or training work request form. A response a
could be requested if the training feedback form was used and was required if the j
training work request form was used. At the beginning of a training week the shift j
supervisor and training instructor would discuss the areas for training emphasis l
during the week. At the end of the training week the shift supervisor would present ;
all written feedback and any other feedback to the training instructor. The other '
crew members also participated in this debriefing. The training instructor then
summarizcd all the feedback. Training feedback was also accepted by training j
instructors and management in any other format. A combined monthly report of j
student feedback was then issued to training supervisors and lead instructors. This
feedback, together with management field observations, management training I
observations, and other data was reviewed monthly by an operations training
coordination committee, and quarterly by a training effectiveness review committee.
A management training effectiveness review committee consisting of senior facility
managers met semi-annually.
. . - _ _ _ -
.
i
. I
8
1
i
The operators interviewed expressed satisfaction with the training feedback l
program. After reviewing student feedback summaries and committee reports, the
inspectors concluded that training issues ware being properly identified and
addressed by management.
The inspectors reviewed the condition reports listed in Attachment 2 to determine if
appropriate corrective action training had been planned and implemented. The
inspectors found that it was difficult to determine if appropriate training had been
performed in many instances by reaoing the condition report. Selected training
issues identified in the condition reports were discussed with operators during
interviews. The inspectors determined that the operators had received appropriate
training on the issues presented.
c. Conclusions
Operations personnel utilized several diverse and effective methods for providing
feedback to the licensed operator requalification training program. The training
department, with involvement by senior management through participation in
J
training effectiveness review committees, responded to the training feedback l
provided.
05.4 Review of Remedial Trainina Proaram
a. inspection Scope (71001)
The inspectors assessed the adequacy of the effectiveness of the remedial training ,
conducted during this requalification cycle and the training planned for the next l
cycle to ensure that it addressed operator or crew performance weaknesses,
b. Observations end Findinas
With respect to failures of Crews B and F (February 1996), D (November 1996),
and a second failure for F (December 1996) during Requalification Training
Cycle 96-20, the inspectors identified recurring performance deficiencies in crew
command, control, communication, and procedure usage skills. The inspectors
identified an apparent weakness in the program's ability to effectively maintain ;
operator performance at expected levels so that previously identified performance i
deficiencies and weaknesses did not reappear. Furthermore, the inspectors )
assessed that Crew F's second failure was due to some of the same performance
deficiencies identified in the February evaluation.
! Although some crews performed well, others were marginal, or required extensive
remedial training. Crew performance across the different shifts appeared
inconsistent at times. It was apparent that the licensee's corrective actions have
not always been effective for all crews to maintain operator performance at
expected levels so that previously identified performance deficiencies and
i
1
,
I
.
.
.
,
9
l
weaknesses did not reappear. The inspectors requested that the licensee provide ;
any documented root causes and intended corrective actions regarding this issue.
The inspectors also requested a copy of the final Requalification Training i
Cycle 96-20 Completion Report. The licensee's staff acknowledged this issue and
the request for additional documentation.
The inspectors also observed Crew F's short-term remedial training process on
December 4-8,1996, and remediation examination on December 9,1996. The
inspectors determined that the short-term remedial training was intensive and
effective. Cre u F's improved performance supported the licensee's decision to j
return it to licensed shift duties as scheduled. However, the inspectors shared the l
lisensee's concerns that the licer. sed reactor operator who failed on individual
competencies may not be competent to continue to perform license duties. The
inspectors requested that the NRC be kept informed of the final remedial disposition
of this operator before returning him to licensed duties, or of a decision to terminate
the license. The licensee's staff acknowledged this request.
c. Conclusions
The remedial training program was adequate. Short-term remedial training was
intensive and offective. However, recurring performance deficiencies in crew
command, control, communication, and procedure usage skills indicate that the l
licensee's corrective actions have not been effective for all crews to maintain l
operator performance at expected levels so that previously identified performance I
deficiencies and weaknesses did not reappear.
05.5 Review of Conformance with Ooerator License Conditions:
a. insoection Scone (71001)
The inspectors evaluated the adequacy of the requalification program's compliance
with Subpart C, Medical Requirements and 10 CFR 55.53, license conditions. The
inspectors interviewed operators and training management, and examined the
licensee's records to determine compliance for conditions to maintain an active
operator license, reactivation of licenses, and medical fitness. Approximately
10 percent of the records were reviewed.
b. Observations and Findinas
- Operator license conditions were being accurately identified and tracked. License
i conditions were complied with in the samp!s selected.
,
.
.4
.
-10-
c. Conclusions
The inspectors concluded that the licensee accurately tracked, maintained, and
controlled the .:onditions of operator licenses and reactivation of inactive licenses in
accordance with Subpart C,' Medical Requirements, and 10 CFR 55.53, License
Conditions.
08 Miscellaneous Operations issues
]
08.1 Review of the Uodated Final Safety Analysis Reoort Commitments
A recent discovery of a licensee operating their facility in a manner contrary to the
. Updated Final Safety Analysis Report description highlighted the need for a special
focused review that compares plant practices, procedures, and/or parameters to the
]
. Updated Final Safety Analysis Report descriptions. While performing the inspection
discussed in this report, the inspectors reviewed the applicable portions of the
Updated Final Safety Analysis Report that related to the areas inspected. The
inspectors verified that the Updated Final Safety Analysis Report section for
licensed operator replacement and requalification training was consistent with the
observed plant practices and procedures.
IV. Plant Support
F8 Miscellaneous Fire Protection issues
F8.1 General Comments
The inspectors observed general plant housekeeping incident to administration of
the in-plant job performance section of the operating test. The f acility was
reasonably clean, welllighted, and the floors were clear and free from debris. The 1
operators were conscientious to note discrepancies and inform the main control i
room.
V. Manaaement Meetinas !
X1 Exit Meeting Summary
The examiners presented the inspection results to members of the licensee
management at the conclusion of the inspection on December 12,1996. The
licensee acknowledge the findings presented.
The licensee did not identify as proprietary any information or materials examined
during the inspection.
a
. ,
.
ATTACHMENT 1
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
Licensee !
l
R. Creason, Senior Operations Training Specialist
R. Gardner, Operations Manager 1
B. Houston, Licensing Manager
S. Jobe, Operations Training Programs Supervisor
M. Peckham, Plant Manager
D. Shallenberger, Lead Licensed instructor, Requalification
A. Shiever, Nuclear Training Manager i
'
S. Smalifoot, Shift Supervisor
4
NRC
l
C. Skinner, Resident inspector I
DOCUMENTS REVIEWED
Procedures Reviewed !
Directive 54, " Management Overview of Training ar.d Evaluation Activities,"
Revision 6
Directive 47, " Training Effectiveness Review Committee," Revision 8 i
Directive 7, " Management Field Observation," Revision 7
NTG 317, " Shift Crew Training Assessment," Revision 3
NTP 6.2, " Evaluation of Program Effectiveness," Revision O
NTG 308, " Training Impact," Revision 04.00
NTG 328, " Operations industry Events," Revision 01.00
NTP 1.1, " Training Work Request," Revision 0
SKLO12-06-01," Simulator Discrepancies and Design Changes," Lesson Plan
NTP 4.2, " Test item and Examination Development," Revision O
SOP 2.2.28, "Feedwater System Starup and Shutdown," Rev;sion 58.1
CNS Operations Directive 2, "CNS Communication," Revision 12
NTG 323," Development of Licensed Operator bqualification Evaluation Scenarios"
NTG 315, " Licensed Personnel Requalifit,c n Training"
NTP 5.3, " Student Remediation"
NTG 317," Shift Crew Training Assessment"
NTP 6.2, " Evaluation of Program Effectiveness"
NTP 08, " Instructor Qualifications"
i
a
i
.
-2-
!
Condition Reports and Licensee Event Reports
CR 96-0478, dated May 9,1996 i
CR 96-0766, dated September 3,1996 )
CR 96-0849, dated September 25,1996 l
CR 96-0765, dated August 30,1996 i
CR 96-0356, dated April 13,1996
CR 96-0553, dated June 11,1996 j
CR 96-0180, dated February 28,1996 i
CR 96-0832, dated September 20,1996 )
LER 96-05, Revision 0 ;
1
Memoranda and Other Reoorts
NTM96011," Management Training Effectiveness Review Committee, May 29, June 5,
June 13,1996," from John H. Mueller, dated June 26,1996 1
NTM96018," Management Training Effectiveness Review Committee Meeting Minutes - !
July 29,1996," from Philip D. Graham, dated October 17,1996
"MTERC Meeting - September 25,1996," from Philip D. Graham, dated October 29,1996
OPS 96027,"First Quarter TERC Meeting - March 22,1996," from R. L. Garner to J.T.
Herron, dated April 12,1996 l
OPS 96034, "Second Quarter TERC Meeting - June 21,1996," R. L. Gardner to J. T.
Herron, dated July 15,1996
NTG-315, Attachment B, "CNS Licensed Operator Requal Topic Survey," R. R. Carlson,
dated August 19,1996
NTG-315, Attachment B, "CNS Licensed Operator Requal Topic Survey," R. R. Carlson,
dated August 19,1996
NTD960628," Operations and Operations Traihing Coordination Meeting," S. J. Jobe to D.
W. VanDerKamp, dated September 11,1996
NTD960708," Operations and Operations Training Cocrdination Meeting," S. J. Jobe to D.
W. VanDerKamp, dated November 1,1996
NTD960308,"Requal End-of Cycle Completion Report: 96-12," A. R. Shiever to R. L.
Gardner, dated June 6,1996
NTD960684,"Requal End of Cycle Completion Report: 96-15." A. R. Shiever to R. L. j
Gardner," dated October 4,1996 l
"CNS Directive 7 Field Observations - Monthly Report," R. A. Sessons to J. H. Mueller,
dated July 12,1996
NTD960709," Student Feedback Report for September 1996," Ralph Drier to Training
Manager, Training Supervisors & Training Leads," dated October 28,1996
NTM96044," Directive 54, Training Activity Observation Report - September & Third
Quarter 1996," A. R. Shiever to NPG Managers, Supervisors and Training Lead
Instructors, dated October 28,1996
. -
i
e i
e.
.
I -3-
i
!
NTM96036," Directive 54, Training Activity Observation Report - August 1996," A. R. l
Shiever to NPG Managers and Supervisor, Nuclear Training Lead Instructors, dated
September 20,1996
NTD960578," Industry Events Survey Results and Recommendations," D. Shallenberger/L. ,
Monroe to D. VanDerKamp, dated August 22,1996
Other Documents
" Cooper Nuclear Station Westrain Assessment, week of June 12,1995"
"1997 Licensed Operator /STE Requal Schedule," ROO, dated November 7,1996
1
1
1
I
l
l
!
,
l
a
4
e
r 9
! ATTACHMENT 2
l SIMULATION FACILITY REPORT
l
Facility Licensee: Cooper Nuclear Station
Facility Docket: 50-298
Operating Examinations Administered at: Cooper Nuclear Station,
Brownville,' Nebraska
l
Operating Examinations Administered on: December 04-09,1996
These observations do not constitute audit or inspection findings and are not, without
!
further verification and review, indicative of noncompliance with 10 CFR 55.45(b). These
- observations do not affect NRC certification or approval of the simulation facility, other -
than to provide information which may be used in future evaluations. No licensee action is
l required in response to these observations.
Overall, the simulation facility displayed good fidelity.
l'
l
,
\
<
I
l
l
l
'
,
f
l