Forwards Safety Insp Repts 50-454/85-38 & 50-455/85-42 on 850828 & 29 & Notice of Violation
ML20133C513
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/01/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20133C517 List:
References
NUDOCS 8510070386
Download: ML20133C513 (2)


See also: IR 05000454/1985038

Text

r

__

..

.

'

OCT 0 1 E85

l Docket No. 50-454

Docket No. 50-455

'

Commonwealth Edison Corapany

ATTN: Mr. Cordell Reed

Vice President

'

Post Office Box 767

Chicago, IL 60690

'

Gentlemen:

This refers to the special safety inspection conducted by Mr. L. J. Hueter of

this office on August 28-29, 1985, of activities at Byron Nuclear Station

authorized by NRC Operating License No. NPF-37 and Construction Permit

No. CPPR-131 and to the discussion of our findings with Mr. R. Pleniewicz at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

The responses directed by this letter (and the accompanying Notice) are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

8510070386 e51001

PDR ADOCK 05000454-

OD i

t\ d ,

3

t

l

.

>

._

Commonwealth Edison Company -2-

OCT 01 ms

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by W.D. Shafer"

W. D. Shafer,. Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1. Appendix, Notice

of Violation

2. Inspection Reports

No. 50-454/85038(DRSS);

No. 50-455/85042(DRSS)

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS) .

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE ,

W. Paton, ELD

L. 01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division

D. Weiss, Licensing Fee

Management. Branch

RII b RIII'ff[ RI RI

t

j HuetN [ Schumacher Fohmy

09/18/85