OCT 0 1 E85
l
Docket No. 50-454
'
Docket No. 50-455
Commonwealth Edison Corapany
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
'
Chicago, IL 60690
'
Gentlemen:
This refers to the special safety inspection conducted by Mr. L. J. Hueter of
this office on August 28-29, 1985, of activities at Byron Nuclear Station
authorized by NRC Operating License No. NPF-37 and Construction Permit
No. CPPR-131 and to the discussion of our findings with Mr. R. Pleniewicz at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
8510070386 e51001
ADOCK 05000454-
i
t\\ d
3
t
,
l
.
>
. _
Commonwealth Edison Company
-2-
OCT 01 ms
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original signed by W.D. Shafer"
W. D. Shafer,. Chief
Radiological Protection Branch
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-454/85038(DRSS);
No. 50-455/85042(DRSS)
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Plant Manager
DCS/RSB (RIDS)
.
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
Diane Chavez, DAARE/ SAFE
,
W. Paton, ELD
L. 01shan, NRR LPM
H. S. Taylor, Quality Assurance
Division
D. Weiss, Licensing Fee
Management. Branch
RIII'ff[
RI
RI
RII b
j
HuetN [
Schumacher
Fohmy
t
09/18/85
_
m.
.~
mm
.m
m