Informs That State of Nj Has No Comments Re License Change Request 245 Re Pressure/Temp Limits
ML20133C476
Person / Time
Site: Oyster Creek
Issue date: 12/24/1996
From: Tosch K
NEW JERSEY, STATE OF
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9701070195
Download: ML20133C476 (2)


Text

. - - - -.

t I

i Jiate of )Tefn 3erseg Christine Todd Whitman Department of Environmental Protection Robert C. Shinn, Jr.

j Governor Commissioner l

' Division of Environmental Safety, Health, Analytical Programs Radiation Protection Programs Bureau of Nuclear Engineering i

CN 415 Trenton, NJ 08625-0415 Tel: (609) 984 ~ ~'00 FAX:

(609) 984-7513 December 24, 1996 I

l U.S.-Nuclear Regulatory Commission f

Document Control Desk Washington, D.C.

20555 I

Ladies & Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50-219. Technical Specification Change Request (TSCR) No. 245 -- Pressure-Temperature (P-T)

Limits j

i On August 23, 1996, per requirements of 10 CFR 50.4 (b) (1),

Appendix G,

and guidance described in US Nuclear Regulatory Commission (NRC) Regulatory Guide 1.99, OCNGS submitted TSCR-245 for NRC approval of new heatup/cooldown pressure / temperature

. limit curves.

On November 27, 1996, per NRC's Request for Additional Information, GPUN submitted additional documentation.

The currently used P-T limits are approved for.OCNGS operation up to seventeen (17) effective full power years (EFPY) of operation.

It is projected that OCNGS will reach 17 EFPY.in~ April 1997.

The proposed new P-T limit curves, to be used beyond 17 EFPY, are intended to assure that brittle fracture of the reactor vessel is prevented.

The new curves were deve7.oped based on reactor material specimens and dosimetry vires; placed

inside, and subsequently removed from the reactor after irradiation, to O

)

determine the extent of reactor embrittlement as a function of l

fluence.

Three new curves were developed through 22, 27, and 32 EFPY.

The -licensee. stated that.the.. curves.were based on NRC-

=

h approved-methodologies and the material. structural integrity 4

results obtained from the test specimens retrieved from the reactor.

9701070195 961224 PDR ADOCK 05000219 P

PDR

'O(UUUU NewJersey is an Equal Opporturuty Enployer Recycled Paper

.j

licensee, describing the evaluation methodology and assumptions used as well as the results of such evaluations.

The New Jersey Department of Environmental Protection has no comments.

If you have any questions please contact Rich Pinney at (609) 984-7558.

Sincerely, Kent Tosch, Manager Bureau of Nuclear Engineering c:

J.

Lipoti, PhD., Assistant Director RPP -- NJ DEP D. Zannoni, Supervisor N.E.S./BNE -- NJ.DEP R. Eaton, Senior Project Manager -- US NRC L. Briggs, Senior Resident Inspector OCNGS -- US NRC M. Laggart, Licensing Manager -- GPUN l