z* ^
.I$%l sodHilRN CAllf 0RNIA d EDISON i
An EDISO% INTERNATIONAL Company l
January 2,1997 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 4
Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Radiation Monitoring System Digital Upgrade San Onofre Nuclear Generating Station Units 2 and 3
Reference:
Letter, SCE to NP.C, " Docket Nos. 50-361 and 50-362 Application of 3
Leak-Before-Break-Technology San Onofre Nuclear Generating Station Units 2 and 3," April 17,1995.
This letter is to inforn you of changes to the schedule for implementing the design change associated with replacement of existing gas monitoring channels.
In Southern California Edison's (SCE's) letter referenced above, SCE stated its intent to implement this design change by the end of 1996. However, a change to the schedule for implementing the design change is needed. A change i
to the Technical Specifications is required prior to implementing the design change. A proposed Technical Specification change will be submitted by July 15, 1997 to permit upgrading the existing analog monitors to digital monitors.
Therefore, the design change will be implemented following NRC approval of this proposed change.
SCE currently anticipates that the design change will be implemented by July 1,1998.
\\
D bO I l
7009 9701070048 970102 DR ADOCK 05000361 PDR P. O. Box 128 -
San Ckmente, CA 92674 0128
c, --
[
Document Control Desk,
t If you would like additional information regarding this information, please let me know.
Sincerely,
)
I i
d-t.
I cc:
L. J. Callan, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 4-5 I