ML20133C089

From kanterella
Jump to navigation Jump to search
Approves 850823 Revs to Emergency Plan.Effectiveness of Plan Not Downgraded
ML20133C089
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/30/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8510070223
Download: ML20133C089 (1)


Text

SEP 3 01985 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

We have completed our review of the August 23, 1985, revisions to the Point Beach Nuclear Plant Emergency Plan. Our review indicated that your plan changes do not downgrade the effectiveness of your emergency plan.

Please be reminded that 10 CFR Part 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan.

However, if your safety review indicates no decrease in emergency prepared-ness, then changes can be made without NRC approval. In all cases, you should furnish copies of each proposed change to the NRC in accordance with 10 CFR Part 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V (Implementing Procedures).

Should you have any questions regarding this letter, please contact Mr. William Snell of my staff at (312) 790-5513.

Sincerely,

$$ $ 6 " Original signed by II.D. Chafor" W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch cc: J. J. Zach, Plant Manager DCS/RSB(RIDS)

Licensing Fee Management Branch Resident Inspector, RI!!

John J. Duffy, Chief Boiler Section Ness Flores, Chairperson /

Wisconsin Public Service Commission ig<h i

t ,$

l W. Weaver, FEMA, Region V .W

~

D. Matthews, EPB -

)

R!!!  ! RI!! R1 $

0

/rr P ips la5 r 09/30/85 '

/