Notifies That Proposal for Not Completing Previously Approved Safety Relief Valve in-plant Test Program Approved. Util Still Required to Submit Final Test Rept Per License Condition 2.C.(34).Safety Evaluation Encl
ML20133B982
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/23/1985
From: Novak T
Office of Nuclear Reactor Regulation
To: Richard J
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20133B985 List:
References
TAC-57860, NUDOCS 8508060311
Download: ML20133B982 (2)


Text

_

  1. o UNITED STATES

!' ~ ,}, NUCLEAR REGULATORY COMMISSION

. r,

-l WASHINGTON, D. C. 20655 5 July 23,1985 k ....+ f '

YDEMtN.i50-4161 a Mr. Jackson B. Richard Senior Vice President, Nuclear Mississippi Power and Light Company P.O. Box 23054 Jackson, Mississippi 39205

Dear Mr. Richard:

Subject:

Grand Gulf Nuclear Station Unit 1 - Safety Relief Valve Inplant Tests By letter dated June 6,1985, the Mississippi Power and Light Company requested approval of a change in the safety relief valve (SRV) inplant test program which would allow termination of the test program with the tests already completed.

The previously-approved test program consists of a shakedown test, four single valve actuation (SVA) tests and four multiple valve actuation (MVA) tests.

Tests completed include a shakedown test, three SVA tests and the one MVA test.

In addition, three consecutive valve actuation (CVA) tests were run, although not required by the test program. The CVA tests were run to provide infomation on the most limiting SRV loading on the containment structure. By letters dated June 18 and July 3,1985, licensee provided test results and other information to support its conclusion that test results already obtained are sufficient to meet the test objective of confirming the structural adequacy of the containment -

for SRV loadings.

The NRC staff has reviewed licensee's submittals of June 6. June 18 and July 3, 1985. The staff's safety evaluation is enclosed. The staff concludes that the licensee's proposal for not completing the previously-approved test program is acceptable, based on the staff's review of the preliminary information provided.

The licensee is still required to submit a final test report in accordance with License Condition 2.C.(34). Should the final data reduction of the test results show significant deviations from similar test results at the Kuosheng Nuclear Plant or significant deviations from design analyses, the licensee is required to either complete the previously approved test program or justify the deviations.

Sincerely.

DI:sIcyA ED CatcItat, M omas M. Novak, Assistant Director Certified By_ for Licensing

-~//}/ .

Division of Licensing

,r

Enclosure:

As stated cc: See next page 8508060311 850723 PDR ADOCK 05000416-P PDR

. Mr. Jackson B. Richard Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc:

Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire .

Bishop. Liberman, Cook, Purcell Mr. Oliver D. Kingsley, Jr.

and Reynolds Vice President, Nuclear Operations 1200 17th Street, N.W. Mississippi Power & Light Company '

Washington, D. C. 20036 P.O. Box 23054 Jackson, Mississippi 39205 Mr. Ralph T. Lally Manager of Quality Assurance Office of the Governor Middle South Services Inc. State of Mississippi P.O. Box 61000 Jackson, Mississippi 39201 New Orleans, Louisiana 70161 Attorney General Mr. Larry F. Dale, Director Gartin Building Nuclear Licensing and Safety Jackson, Mississippi 39205 Mississippi Power & Light Company P.O. Box 23054 Mr. Jack McMillan, Director Jackson, Mississippi 39205 Solid Waste Mississippi State Board of Health Mr. R. W. Jackson, Project Engineer ,880 Lakeland Bechtel Power Corporation Jackson, Mississippi 39206 -

15740 Shady Grove Road Gaithersburg, Maryland 20760 Alton B. Cobb, M.D.

State Health Officer Mr. Ross C. Butcher State Board of Health Senior Resident Inspector P.O. Box 1700 U.S. Nuclear Regulatory Comission Jackson, Mississippi 39205 P.oute 2, Box 399 Port Gibson, Mississippi 39150 President Claiborne County Board of Supervisors Regional Administrator, Region II Port Gibson, Mississippi 39150 U.S. Nuclear Regulatory Comission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. J. E. Cross, General Manager Grand Gulf Nuclear Station

, Mississippi Power & Light Company P.O. Box 756 Port Gibson, Mississippi 39150 ,

l l