MONTHYEARML20127E7021985-06-0606 June 1985 Requests Review of Tech Spec Requirements to Confirm That Response Time Surveillance Requirement Appropriate & Consistant W/Definition of Reactor Trip Sys Response Time. License Amend Needed If Response Time Incorrect Project stage: Approval ML20133B2491985-09-23023 September 1985 Rev 1 to License Change Application 117,modifying Tech Specs to Rectify Inconsistencies W/Installed Instrumentation Not in Agreement W/Rev 4 to NUREG-0452 & to Remove Unnecessary Numerals from Spec Numbers Project stage: Other ML20133B2331985-09-23023 September 1985 Forwards Rev 1 to License Change Application 117,requesting Amend to License NPF-1,modifying Tech Specs to Revise Reactor Trip Sys & ESFAS Instrumentation Requirements. Certificate of Svc Encl Project stage: Other ML20133B2541985-09-23023 September 1985 Proposed Tech Specs,Rectifying Inconsistencies W/Installed Instrumentation Not in Agreement W/Rev 4 to NUREG-0452 & Removing Unnecessary Numerals from Spec Numbers Project stage: Other ML20207B8141986-07-0303 July 1986 Proposed Tech Specs,Incorporating License Change Application 117 Re Reactor Trip Sys & ESFAS Instrumentation to Incorporate Revised WCAP-10271 & Westinghouse STS Project stage: Other ML20207B8041986-07-0303 July 1986 Revised Application to Amend License NPF-1,incorporating License Change Application 117,changing Tech Specs Re Reactor Trip Sys & ESFAS Instrumentation to Incorporate Revised WCAP-10271 & Westinghouse STS Project stage: Request ML20207B7961986-07-0303 July 1986 Forwards Revised Application to Amend License NPF-1, Incorporating License Change Application 117,changing Tech Specs Re Reactor Trip Sys & ESFAS Instrumentation to Incorporate Revised WCAP-10271 & Westinghouse STS Project stage: Request ML20212M3981986-08-22022 August 1986 Proposed Tech Specs Re Table 3.3-1, Reactor Trip Sys Instrumentation, Action 19 of Table 3.3-3 & Protective & ESF Instrumentation Bases Project stage: Other ML20212M3511986-08-22022 August 1986 Revised Application for Amend to License NPF-1,incorporating Rev 2 to License Change Application 117,changing Tech Specs Re Table 3.3-1, Turbine Trip & Expansion of Reactor Protection Bases Per Change in Surveillance Interval Project stage: Request ML20211C8821986-10-17017 October 1986 Proposed Tech Specs Re Reactor Trip Sys & ESF Actuation Sys Instrumentation & Surveillance Requirements Project stage: Other ML20211C7901986-10-17017 October 1986 Revised Application to Amend License NPF-1,consisting of Changes to Rev 2 to License Change Application 117,revising Tech Spec Tables 3.3-1 Re Reactor Trip Sys Instrumentation & 4.3-1 Re ESF Sys Instrumentation Surveillance Requirements Project stage: Request ML20205F9111987-03-23023 March 1987 Withdraws Requested Change D.14.b of License Change Application 117 for License NPF-1 Re Reactor Protection Sys Instrumentation.Revised Page 15 Reflecting Withdrawal of Proposed Change Encl Project stage: Withdrawal ML20209D9081987-04-22022 April 1987 Forwards Amend 131 to License NPF-1 & Safety Evaluation. Amend Provides Changes to Reactor Trip Sys & ESFAS Instrumentation Requirements Project stage: Approval 1986-07-03
[Table View] |
Text
f Portland General ElectricCarviny Bad D Withers Vce Presdent September 23, 1985 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation ATTN:
Mr. E. J. Butcher, Jr., Acting Chief Operating Reactors Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Cotanission Washington DC 20555
Dear Sir:
License Change Application 117. Revision'1 Attached are three signed originals and 40 conformed copies of License Change Application 117 Revision 1, requesting amendment of Operating License NPF-1.
A fee for this change was submitted with the original License Change Application 117 on January 30, 1985.
Also attached is one signed copy of a Certificate of Service for License Change Application 117. Revision 1, to the chief executive of the county its which the facility is located and the Director of the State of Oregon, Department of Energy in accordance with 10 CFR 50.91.
Sincerely, o
M_ : @
Bart D. Withers Vice President Nuclear Attachments c:
Mr. Lynn Frank, Director State of Oregon Department of Energy Mr. Robert L. King Chairman of County Commissioners 0l 85100301G4 850923
&0 PDR ADOCK 05000344 P
3 P
PDR NO a s w smen wt. nonm2 c e2,n 9 204
{
5 t
l UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
PORTLAND GENERAL ELECTRIC COMPANY,
)
Docket 50-344 THE CITY OF EUGENE, OREGON, AND
)
Operatinr, License NPF-1 PACIFIC POWER & LIGHT COMPANY
)
)
(TROJAN NUCLEAR PLANT)
)
CERTIFICATE OF SERVICE I hereby certify that copies of License Change Application 117, Revision 1, to the Operating License for Trojan Nuclear Plant, dated September 23, 1985, have been served on the following by hand delivery or by deposit in the United States mail, first class, this 23rd day of September 1985:
Mr. Lynn Frank, Director State of Oregon Department of Energy Labor & Industries Blds, Rm 102 Salem OR 97310 Mr. Robert L. King Chairman of County Commissioners Columbia County Courthouse St. Helens OR 97051
- VJ
),
G. A. Zfnmerman, Manager Nucle 9[ egulation Branch Nucle e afety & Regulation Subscribed and sworn to before me this 23rd day of September 1985.
9MyCommission M
d Notary Public of Ore [4n wu'-
/
[
(/
-.