Forwards Piping Analysis/Pipe Support Design,Third-Party Review for Ja Fitzpatrick Nuclear Power Plant, Final Rept. Rept Prepared to Investigate Allegations Re Adequacy of Pipe Supports
ML20133B093
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/01/1985
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20133B096 List:
References
JPN-85-68, NUDOCS 8510030018
Download: ML20133B093 (3)


Text

.)

/

123 Main Street Whrte Plains, New York 10601 914 681.6240

  1. > NewYorkPbwer i "",t" Lee, tv Authority

"- ~e-October 1, 1985 JPN-85-68 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Domenic B.

Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 Potential Pipe Support Non-Conformance Results of Independent Third-Party Review

References:

1.

NYPA letter, J.

P.

Bayne to H.

R.

Denton, dated Jaunary 20, 1984 (JPN-84-02) regarding Potential Pipe Support Non-Conformance.

2.

NYPA letter, J.

P.

Bayne to D.

B.

Vassallo, dated May 2, 1985 (JPN-85-38) regarding Long-Term Pipe Support Inspection and Evaluation Program.

~ As part of the Power Authority's investigation of various allega-tions regarding the adequacy of pipe supports in the FitzPatrick plant, we retained an independent third-party to assess these allega-tions.

United Engineers and Constructors (UEEC), who performed the review, has-recently completed their work and issued a final report summarizing their findings.

In the cover letter accompanying the final report, UE&C concludes "Our Third Party Review effort has not resulted in the identification of any safety concerns in those areas originally identified by Target Technology...".

Attachment No.

l' is a copy of UE&C's final report for your information and review.

In Reference No.

1, we committed to prepare and implement a long-term program to assure that all pipe supports on safety-related piping comply with applicable installation criteria by identifying and evaluating discrepancies similar to those already identified.

Via Reference No.

2, we submitted our Long-Term Pipe Support Inspection and Evaluation Program Plan.

Approximately one hundred supports have been inspected under Phase I of the program, with new Phase 2 inspections proceeding at the rate of approximately ten supports per week.

\\

8510030018BhO0333 PDR ADOCK O P

- PDR f

{

3

We also committed in Reference No. 2 to re-inspect the main steam line support that was modified during the summer 1983 outage.

No damage or discrepancies were identified.

Attachment No. 2 is a summary of the results of this re-inspection.

. Based upon these findings, no further actions are considered necessary at this time.

The Power Authority considers this issue closed.

If you.have any further. questions, please contact Mr. J. A.

Gray, Jr. of my staff.

/

/'

Very truly y r s,,. '

(b%

,g/Jonn C.

Brons

- (

Senior Vice President Nuclear Generation

p. -

cc:

Office of the Resident Inspector U.S.

Nuclear Regulatory Commission P.O.

Box 136 Lycoming,HN.Y.

13093 i

n 4

,,e, w-

~

--,-p-e--w-

---,e,

-p w--,

-,---------,--w,.w e--

Un ted Engineers & Constructors Inc 215 422 3000 d

30 sourn 17tn street Teien 83 4203 Attachment No. 1 to JPN-85-60 Post,0ffice Don 8223 Telecoper 215 422 4648 PMiadelpnia. PA 19101 UnitedEngineers isConstructors j

A Raytteeese Comon August 30, 1985 File: A-5.800 UJ-0078 Mr. Leon Guaquil, Director Project Engineering - BWR Ref: A) UNITED Letter to NYPA NEW YORK POWER AUTHORITY UJ-0049 123 Main Street B) UNITED letter to NYPA White Plains, NY 10601 UJ-0002 C) TTL Letter to hTPA dated June 30, 1983 D) UNITED Letter to NYPA UJ-0005 E) TTL Letter to UNITED dated August 18, 1983 Gentlemen:

New York Power Authority James A. FitzPatrick Nuclear Power Plant Piping / Support Analysis, Third Party Review Transmittal of Final Report This letter transmits the Final Report of ~ UNITED's Third Party Review activity for the James A. FitzPatrick facility. This report is a revision (Revision 1) to our interim report transmitted by Reference A.

All items defined in our original review scope (Reference A) have been completed. All open findings identified in our Reference A report have been satisfactorily closed.

Other findings identified during more recent review of the Recirculation System have also been satisfactorily closed. There are no open items remaining.

Our Third Party Review ef fort has not resulted in the identification of any safety concerns in those areas originally identified by Target Technology (Reference C) and further clarified in a joint Target Technology /NYPA/ UNITED Meeting (References D, E).

Please contact me or Mr. G.

Rigamonti if you require any clarification of this submittal.

Very truly yours,

/

R. W. Barton Project Manager RWB: cab Enc.