Forwards PNL-5485, Review & Evaluation of Tdi Diesel Engine Reliability & Operability - River Bend Station Unit 1, Technical Evaluation Rept Prepared by Bnwl.Requests Comments on Rept for Incorporation in Forthcoming Safety Evaluation
ML20133B053
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/24/1985
From: Butler W
Office of Nuclear Reactor Regulation
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20133B055 List:
References
CON-FIN-B-2963 NUDOCS 8508060050
Download: ML20133B053 (4)


Text

-

6 Docket No. 50-458 July 24,1985 Mr. William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group Gulf States Utilities Company P.O. Box 2951 Beaumont, Texas 77704

Dear Mr. Cahill:

SUBJECT:

TRANSAMERICA DELAVAL (TDI) EllERGENCY DIESEL GENERATORS-RIVER BEhD Enclosed please find an advance copy of a technical evaluation report (PNL-5485),

concerning the TDI diesel engines at River Bend Staticn. The report was pre-pared for the NRC staff by its contractor, the Battelle-Pacific florthwest Laboratory. The NRC staff is in the process of preparing its safety evaluation of the adequacy of the TDI diesel generators at River Bend, and the technical evaluation report will be a significant part of the safety evaluation. We therefore request that you provide us with your corrents concerning the report so that they may be incorporated into the safety evaluation. Because of the tight schedule for resolving this issue, we request your coments as soon as possible.

Sincerely, Walter R. Butler, Chief Licensing Branch fio. 2 Division of Licensing

Enclosure:

As stated DISTRIBUTION:

D'oli Et File itRC PDR Local PDR PRC Systen NSIC LB#2 Reading EHylton

~

SStern, Pit Dewey ELD ACRS(16)

JPartlow BGrires EJordan LB#

/ Orig. L L/ Pit A[/Sk LBi2/DL/B RC so:mk SStc n Cbtfiql ger lluutler 7/%/85 7/

/85 7Aff/25 7/q05

o c,o '

Docket No. 50-458 July 24,1985 i

Mr. William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group Gulf States Utilities Company P.O. Box 2951 Beauraont, Texas 77704

Dear Mr. Cahill:

SUBJECT:

TRANSAMERICA DELAVAL (TDI) EttERGENCY DIESEL GENERATORS-RIVER BEND Enclosed please find an advance copy of a technical evaluation report (PNL-5485),

concerning the TDI diesel engines at River Bend Station. The report was pre-pared for the NRC staff by its contractor, the Battelle-Pacific fiorthwest Laboratory. The NRC staff is in the process of preparing its safety evaluation of the adequacy of the TDI diesel generators at River Bend, and the technical j

evaluation report will be a significant part of the safety evaluation. We therefore request that you provide us with your corrents concerning the report 50 that they may be incorporated into the safety evaluation. Because of the tight schedule for resolving this issue, we request your corrents as soon as possible.

Sincerely, Walter R. Butler, Chief Licensing Branch flo. 2 Division of Licensing

Enclosure:

As stated DISTRIBUTION:

Docket File i1RC PDR Local PDR PRC System flSIC LB#2ReadinC EHylton SStern,Pl!

Dewey ELD ACRS(16)

JPartlow BGrimes EJordan A[/Sli((rigerCBerl /)

LB#2/DL/B LB#

Orig. L L/PM RC so:mk SSte n WButler 7/%/85 7/g//85 7/if/85 7/q85 l

c 6

e 0,,

UNITED STATES g

NUCLEAR REGULATORY COMMISSION 3

l WASHINGTON, D. C. 20555 g,

/

July 24,1985 Docket No. 50-458 Mr. William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group Gulf States Utilities Company P.O. Box 2951 Beaumont, Texas 77704

Dear Mr. Cahill:

SUBJECT:

TRANSAMERICADELAVAL(TDI)EMERGENCYDIESELGENERATORS-RIVERBEND Enclosed please find an advance copy of a technical evaluation report (PNL-5485),

concerning the TDI diesel engines at River Bend Station. The report was pre-pared for the NRC staff by its contractor, the Battelle-Pacific Northwest Laboratory.

The NRC staff is in the process of preparing its safety evaluation of the adequacy of the TDI diesel generators at River Bend, and the technical evaluation report will be a significant part of the safety evaluation. We therefore request that you provide us with your connents concerning the report so that they may be incorporated into the safety evaluation. Because of the tight schedule for resolving this issue, we request your connents as soon as

possible, r

Sincerely, t

Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing

Enclosure:

As stated I

1 L

fir. Willian J. Cahill, Jr.

River Bend Nuclear Plant Gulf States Utilities Coa +any Ms. Linda B. Watkins/Mr. Steven Irving cc:

Troy B. Conner, Jr., Esq.

Attorney at Law Conner and Wetterhahn 355 Napoleon Street j

1747 Pennsylvania Avenue, NW Baton Rcuge, Louisiana 70802 l

Washington. 0.C.

20006 Mr. David Zaloudek Mr. William J. Reed, Jr.

Nuclear Energy Division Director - Nuclear Licensing Louisiana Department of Gulf States Utilities Company Environmental Quality P. O. Box 2951 P. O. Box 14690 Beaumont, Texas 77704 Baten Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.

Mr. J. David 14theill, III Assistant Attorney General in Charge William G. Davis, Esq.

State of Louisiana Department of Justice Department of Justice 234 Loyula Avenue Attorney General's Office New Orleans, Louisiana 70112 7434 Perkins Road d

Baton Rouge, Louisiana 70808 Resident Inspector P. O. Box 1051 H. Anne Plettinger St. Francisville, Louisiar.a 70775 3456 Villa Rose Drive Baton Rouge, Lousiana 70806 l

Gretchen R. Rothsch'ild Louisianians for Safe Energy, Inc.

1659 Glenmore Avenue Baton Rouge, Louisiana 70775 Jaraes W. Pierce, Jr., Esq.

P. O. Box 23571 Baton Rouge, Louisiana 70893

}-

Regional Administratur, Region IV U.S. Nuclear Regulatory Conmission Office of Executive Director for Operations c

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

.