ML20133A517
| ML20133A517 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 09/12/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Withers B PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20133A521 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8510020224 | |
| Download: ML20133A517 (1) | |
See also: IR 05000344/1985029
Text
C8
'
-
SEP 121985
Docket No. 50-344
Portland General Electric Company
121 S. W. Salmon Street
Portland, Oregon 9 204
Attention;
Mr. Bart D. Withers
Vice President Nuclear
Gentlemen:
l
1
Subject: NRC Inspection
'
T!.is refers to the routine inspection conducted by Ms. L. R. Kanow of this
c fice on August 26-30, 1985, of activities authorized by NRC License
'
b . NPF-1, and to the discussion of our findings held by Ms. Kanow with
Mr. W. S. Orser and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
1
No violations of NRC requirements were identified within the scope of this
inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection we will be glad to
,
discuss them with you.
Sincerely,
C 'd I N d E
O
Y
D. F. Kinch
D. F. Kirsch, Acting Director
Division of Reactor Safety and Projects
Enclosure:
Inspection Report No. 50-344/85-29
cc:
W. S. Orser, PGE
J. W. Durham, Esq.
W. Dixon, DOE
bec:
RSB/ Document Control Desk (RIDS)
Mr
J. Martin
Mr. B. Faulkenberry
Resident Inspector
G. Cook
<p(f'#
b
'
RV
4. ,
LKanow:dh
TYoung
RPate
RDodds
DNirsch
9/ /d /85
9/// /85
9/ /L /85
9////85
9/AL/85
ga"R8an 8i8%4
g[