Forwards Safety Insp Repts 50-277/85-23 & 50-278/85-23 on 850604 & 09-13 & Notice of Violation.Station Procedures Should Be Revised to Allow Only App J Method for Meeting Leak Rate Test Acceptance Criteria.Response Requested
ML20133A144
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/29/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20133A147 List:
References
NUDOCS 8508050353
Download: ML20133A144 (2)


See also: IR 05000277/1985023

Text

r:

~

]

.,

.

i

JUL 2 91985

Docket Nos.

50-277

50-278

l

Philadelphia Electric Company

ATTN:

Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Inspection Report Nos. 50-277/85-23 and 50-278/85-23

This refers to the routine safety inspection conducted by Mr. D. Florek of

this office on June 4, and 9-13, 1985, at the Peach Bottom Atomic Power Station

Units 2 and 3, Delta, Pennsylvania of activities authorized by NRC License No.

DPR-44 and DPR-56 and to the discussions of our findings held by Mr. Florek

with Messrs. R. Fleischmann and D. Smith of your staff at the conclusion of the

inspection. This also reflects a subsequent telephone discussion between

Mr. D. Florek and Mr. R. Fleischmann on June 19, 1985.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the revised NRC Enforcement

Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8583) dated March 8, 1984.

You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

During the course of this inspection, a conflict was noted with your technical

specifications and 10 CFR 50 Appendix J.

Technical Specification 4.7. A./2.e.

indicates that a failed cor.tainment integrated leak rate test (ILRT) measured

value may be reduced-by local leak rate data, taken before and after repairs,

in order to meet the acceptance criteria.

It further states that the contain-

ment ILRT need not be repeated if the above actions satisfy acceptance

criteria.

10 CFR 50 Appendix J does not allow these reductions to meet accep-

tance criteria and furthermore requires successfully conducting a Type A

containment ILRT.

It is requested that you respond to the above conflict and

submit technical specification changes to resolve this conflict.

It should be

noted that at no time during the Peach Bottom Unit 2 ILRT did this conflict

become an issue since the plant staff was working to the requirements of 10 CFR 50 Appendix J.

However, station procedures should be revised to allow only the

Appendix J method for meeting the acceptance criteria.

TC-O\\,1

P.DR

-

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ -

-_

.

-Philadelphia Electric Company

2

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

, Your cooperation with us in this matter is appreciated.

Sincerely,

.

%

'

,

Stewart D. Ebneter, Director

Division of Reactor Safety

,

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined NRC Region I Inspection Report Number 50-277/85-23 and

50-278/85-23 *

cc w/encls:

R. S. Fleischmann, Station Superintendent

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire

A. J. Pietrofitta, General Manager, Power Production Engineering,

l

Atlantic Electric

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

Public Document Room (PDR)

s

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/encls:

Region I Docket Room (with concurrences)

Senior Operations Officer-(w/o encl)

R. Gallo, Chief, Section #2A, RPB#2, DRP

G. Gears, LPM, NRR

._.

RI

R

RI:DRS

' y ' l y s

D R "'% "; "

"

!

5

- _

-

.. e a w .. . . . . . . . . . . .

_...v

07/24/85

.

..

.

..

.

-_

- _____________________________________ _ ______________ -

-