ML20132H243

From kanterella
Jump to navigation Jump to search
Informs of Error in .Conclusion of Ltr Re Onsite & Offsite Plans for State of Wi Should Read as Stated
ML20132H243
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/30/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8508050281
Download: ML20132H243 (1)


Text

..

jut. 3 0 bb5 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:

Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

This is to inform you of an error in our letter dated July 10, 1985.

The conclusion of the letter should have read as follows:

"Thus, both the onsite plan and the offsite plans for the State of Wisconsin and associated local governments in the vicinity of the Point Beach Nuclear Power Plant are approved by NRC and FEMA."

If you have any questions concerning this letter, please contact Mr. M. Phillips of my staff at (312) 790-5530.

Sincerely, i

I W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch l

cc:

J. J. Zach, Plant Manager DMB/Docu ant Control Desk (RIDS)

Resident Inspector, RIII l

f John J. Duffy, Chief Boiler Section Ness Flores, Chairperson Wisconsin Public Service j

Commission g

/3 D. Matthews, EPB, 0IE

[9 ile W. Weaver, FEMA, RV g

8500050281 B50730 PDR ADOCM 05000266 F

PDR O

dW q@

4 RIII RIIJ RIII RIII Plok/bd P

ps 07/29/85