ML20132H210

From kanterella
Jump to navigation Jump to search
Forwards App,Errata & Corrected Pages to SALP 5 Rept 50-409/85-01 in Response to 850328 Meeting W/Util & Util 850418 Comments
ML20132H210
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/31/1985
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20132H214 List:
References
NUDOCS 8508050274
Download: ML20132H210 (2)


See also: IR 05000409/1985001

Text

-*

. Drrts

JUL 31 1986

Docket No. 50-409

Dairyland Power Cooperative

ATTN: Mr. J. W. Taylor

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the NRC's Systematic Assessment of Licensee Performance

(SALP) 5 Board Report for the La Crosse Boiling Water Reactor, our meeting

of March 28, 1985, which discussed in detail the contents of the report, and

your written comments dated April 18, 1985, relative to the report.

We have reviewed and evaluated your comments and have reached the conclusions

presented in the Appendix to this letter.

Based on our discussions during the meeting on March 28, 1985, and further

reiterated in your letter of response, certain portions of the SALP Board

Report have been modified as described in the attached Errata Sheet.

Corrected page(s) are included herein to update your copy of the SALP

Board Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter with the

referenced attachments, will be placed in the NRC's Public Document Room.

No reply to this letter is required; however, should you have questions on

the basis of conclusions reached by NRC, or if you need clarification on the

changes made to the SALP Report, please let us know and we will be pleased

to discuss them with you.

Sincerely,

Original hTgned by

J,2=s C. Keppl et"

James G. Keppler

Regional Administrator

Enclosures:

1. Appendix to SALP 5 Board Report

No. 50-409/85001

2. Errata Sheet

3. Corrected Page(s) to SALP Report

See Attached List for Distribution

8508050274 850731 ./

PDR ADOCK 05000409 I C 'fO

G PDR

  • I

'

e

Dairyland Power Cooperative 2 JUL 31 1985

Distribution

cc w/ enclosures:

J. Parkyn, Plant Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

Commission

Spark Burmaster, Coulee

Region Energy Coalit' ion

J. M. Taylor, Director, EI

H. R. Denton, NRR

Regional Administrators

RI, RII, RIV, RV

N. J. Palladino, Chairman

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

L. W. Zech, Commissioner

NRR Project Manager

H. L. Thompson, NRR

J. Axelrad, IE

'RIII PRR

RIII SGA

State Liaison Officer, State

of Wisconsin

INPO

I

-

RIII#[ RIIYRf

DeFayette/rr Boyd

RIII

n Sc

RIkIs

RINILyinzNoreYius

RIII

AR@

er P i pe ard Greger

C , r

07/22/85 1L 3

'

i

I

, _ , -