ML20132H210
| ML20132H210 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 07/31/1985 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Taylor J DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20132H214 | List: |
| References | |
| NUDOCS 8508050274 | |
| Download: ML20132H210 (2) | |
See also: IR 05000409/1985001
Text
Drrts
.
- *
JUL 31 1986
Docket No. 50-409
Dairyland Power Cooperative
ATTN:
Mr. J. W. Taylor
General Manager
2615 East Avenue - South
La Crosse, WI 54601
Gentlemen:
This refers to the NRC's Systematic Assessment of Licensee Performance
(SALP) 5 Board Report for the La Crosse Boiling Water Reactor, our meeting
of March 28, 1985, which discussed in detail the contents of the report, and
your written comments dated April 18, 1985, relative to the report.
We have reviewed and evaluated your comments and have reached the conclusions
presented in the Appendix to this letter.
Based on our discussions during the meeting on March 28, 1985, and further
reiterated in your letter of response, certain portions of the SALP Board
Report have been modified as described in the attached Errata Sheet.
Corrected page(s) are included herein to update your copy of the SALP
Board Report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter with the
referenced attachments, will be placed in the NRC's Public Document Room.
No reply to this letter is required; however, should you have questions on
the basis of conclusions reached by NRC, or if you need clarification on the
changes made to the SALP Report, please let us know and we will be pleased
to discuss them with you.
Sincerely,
Original hTgned by
J,2=s C. Keppl et"
James G. Keppler
Regional Administrator
Enclosures:
1.
Appendix to SALP 5 Board Report
No. 50-409/85001
2.
Errata Sheet
3.
Corrected Page(s) to SALP Report
See Attached List for Distribution
8508050274 850731
./
ADOCK 05000409
I C 'fO
G
- I
'
e
JUL 31 1985
Dairyland Power Cooperative
2
Distribution
cc w/ enclosures:
J. Parkyn, Plant Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin Public Service
Commission
Spark Burmaster, Coulee
Region Energy Coalit' ion
J. M. Taylor, Director, EI
H. R. Denton, NRR
Regional Administrators
RI, RII, RIV, RV
N. J. Palladino, Chairman
J. K. Asselstine, Commissioner
F. M. Bernthal, Commissioner
T. M. Roberts, Commissioner
L. W. Zech, Commissioner
NRR Project Manager
H. L. Thompson, NRR
J. Axelrad, IE
'RIII PRR
RIII SGA
State Liaison Officer, State
of Wisconsin
RIII#[
RIIYRf
er
RINILyinzRIkIs
AR@
I
RIII
RIII
-
DeFayette/rr
Boyd
P
n Sc
i
NoreYius
pe ard Greger
C
r
,
07/22/85
1L
'
3
i
I
,_
, _ , -
.. . - . .