Text
,
<v 2
i December 20,1996 Mr. Michael B. Roche Vice President and Director GPU Nuclear Corporation Oyster Creek Nuclear Generating Station P.O. Box 388 Forked River, New Jersey 08731
SUBJECT:
PLANT PERFORMANCE REVIEW - OYSTER CREEK
Dear Mr. Roche:
1 On November 6,1996, the NRC staff completed the semiannual Plant Performance Review (PPR) for the Oyster Creek facility. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Oyster Creek involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period June 8, 1996, through November 6,1996. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Oyster Creek PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six months. The rationale or i
basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
We willinform you of any changes to the inspection plan. If you have any questions, please contact me at (610) 337-5234.
Sincerely, ORIGINAL SIGNED BY:
Peter W. Eselgroth, Chief Projects Branch 7 Division of Reactor Projects Dce o: 50-219
Enclosure:
Inspection Plan I
cc w/ encl:
G. Busch, Manager, Site Licensing, Oyster Creek M. Laggart, Manager, Corporate Licensing State of New Jersey 0 k 9612300015 961220 j
s PDR ADOCK 05000219 G
C Mr. Michael B. Roche 2
Distribution w/ encl; Region i Docket Room (with concurrences)
PUBLIC Nuclear Safety information Center (NSIC)
NRC Resident inspector DRS Director, Region i DRS Deputy Director, Region i DRS Branch Chiefs, Region i DRP Director, Region i DRP Deputy Director, Region i DRP Branch Chiefs, Region i D. Haverkamp, DRP M. Oprendek, DRP C. O'Daniell, DRP Distribution w/enci(VIA E-MAIL):
W. Dean, OEDO J. Stolz, NRR R. Eaton, NRR inspection Program Branch, NRR (IPAS)
DOCUMENT NAME:
To receive a copy of this document, indicate in the box:G:\\ BRANCH 7\\OC\\OCPPR129.LTR attachment / enclosure "N" = No copy "C" = Copy without attachment / enclosure "E" = Copy with
' OFFICE RI\\DRP l p, ' RI\\DRP l$
l BWelling y/
PR @ th 12/n/96 12/4/96 i
OFFICIAL RECORD COPY
Mr. Micha:1 B. Rocha 2
i Distribution w/ encl:
Region i Docket Room (with concurrences)
PUBLIC l'
Nuclear Safety Information Center (NSIC)
NRC Resident inspector DRS Director, Region I DRS Deputy Director, Redon I DRS Branch Chiefs, Region i DRP Director, Region I DRP Deputy Director, Region i DRP Branch Chiefs, Region 1 D. Haverkamp, DRP M. Oprendek, DRP C. O'Daniell, DRP i
Distribution w/encI (VIA E-M AIL):
W. Dean, OEDO J. Stolz, NRR R. Eaton, NRR Inspection Program Branch, NRR (IPAS) l 4
i l
i i
i l
i l
1 I
i i
l l
?
DOCUMENT NAME: G:\\ BRANCH 7\\OC\\OCPPR129.LTR l
To receive a copy of this document. Indicate in the box:
"C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure
- N" = No copy i
I OFFICE RI\\DRP l p, RI\\DRg l5 BWelling R/
PE @ th l
12/n/96 12/if /96 i~
OFFICIAL RECORD COPY I
1 1
Enclosure 6 MONTH INSPECTION PLAN FOR OYSTER CREEK IP - Inspection Procedure Tl - Temporary Instruction CO - Core inspection SI - Safety issue inspection RI - Regional Initiative inspection l
lNSPECTION TITLE / PROGRAM AREA START TYPE OF DATE INSPECTION /
l COMMENTS i
l lP 37550 Engineering, Visit 1 3/21/97 CO IP 62706 Maintenance Rule inspection Team 4/7/97 Special Review on Maintenance Rule Program IP 81700 Physical Security, Visit 1 4/28/97 CO IP 62705 Electrical Maintenance 5/19/97 Rl, Focus on (Components and Systems) problems with old cable design and installation IP 84750 Effluent Controls 5/19/97 CO
!