Monthly Operating Rept for Jul 1985
ML20132H137
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/31/1985
From: Newburgh G, Romberg W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
MP-8077, NUDOCS 8510020074
Download: ML20132H137 (5)


Text

.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-245 UNIT Millstone 1 i

DATE 850808 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 MONTH July 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)-

(MWe-Net) 1 652 17 640 2.

650 18

'561 3

648 19 639 4

650 20 646 I

.5 649 21 647 6

648 22 645 7

647 23 647 4

8 646 24 542 9

645 25 647 10 602 26 644

^

11 498 27 644 12 638 28 644 1

13 642 29 643 4

14 643 30, 632 15 641 31 647 16 641 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in.the reporting month.

Compute to the nearest whole megawatt.

i

!Pd"!B8MB's5E45 e

OPERATING DATA REPORT DOCKET NO.

50-245 DATE 850808 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.

Unit Name:

Millstone Unit 1 Notes 2.

Reporting Period:

July 1985 3.

Licensed Thermal Power (MWt):

2011 4.

Nameplate Rating (Gross MWe):

662 5.

Design Electrical Rating (Net MWe):

660 6.

Maximum Dependable Capacity (Gross MWe):

684 7.

Maximun Dependable Capacity (Net MWe):

654 8.

If Ch;nges Occur in Capacity Ratings (Items Num5er 3 Through 7)

Since last Report, Give Reasons:

N/A s

9.

-Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A 4

This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 744 5087 128615 12.

Number Of Hours Reactor Was Critical 744 5087 98841.4 13.

Reactor Reserve Shutdown Hours 0

0 2775.8 14.

Hours Generator On-Line 744 5087 96023.5 15.

Unit Reserve Shutdown Hours 0

0 26.5 16.

Gross Thermal Energy Generated (MWH) 1466508 10066626 176474895 17.

Gross Elec. Energy Generated (MWH) 492300 3421000 59317696 18.

Net Electrical Energy Generated (MWH) 470467 3272151 56576311 19.

Unit Service Factor 100 100 74.7 20.

Unit Availability Factor 100 100 74.7 21.

Unit Capacity Factor (Using MDC Net) 96.7 98.4. _ _

67.3 22.

Unit Capacity Factor (Using DER Net) 95.8 97.5 66.6 23.

Unit Forced Outage Rate 0

0 12.5 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling, October 1985, 5 week duration.

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

-26.

Units In Test. Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION

i DOCKET NO.

50-245

~

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 850808

. COMPLETED BY G. Newburgh REPORT MONTH July 1985 TELEPHONE (203) 447-1791 j

Ext. 4400 l

2

(

No.

Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence 5

850711 S

0 8

5 N/A N/A N/A Down power to find and repair main condenser tube leaks.

1 2

3 4

F:

Forced Reason:

Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for LicenseG C-Refueling 3-Automatic Scram Event Report (LER) File-D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exihibit 1 - Same Source H-Other (Explain) 6-Other (Explain) l

REFUELING INFORMATION REQUEST 1.

Name of facility: _ Millstone 1 2.

Scheduled date for next refueling shutdown:

October 1985 3.

Schedule date for restart following refueling: December 1985 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes, Technical Specification Changes Regarding:

(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.

Scheduled date(s) for submitting licensing action and supporting information:

Summer 1985 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

200 GE78 Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent l

fuel storage pool:

(a) In Core': (a) 580 (b) 1346 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

2184 Assemblies I

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1987, Spent Fuel Pool Full Core Off Load Capability is Reached.

1991, Core Full, Spent Fuel Pool Contains 2146 Bundles.

=

NORTHEAST UTILETIES

"'c'" S*'*a S"' 8"a Coa""cu' l

Y[

,'

  • w.

P.O. BOX 270

.ts s

H ARTFORD, CONNECTICUT 06141-0270

.a os.cs.,0.r. cas,.,

aorman u.s seam cc--

(203) 666-6911 g

64A57 hauCLE AR E*sEnGv Conapassy August 12, 1985 MP-8077 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Provisional License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N0N W. D. Romb g Station Superintendent Millstone Nuclear Power Station WDR/GSN:jlc

Enclosures:

(

)

cc:

Director, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555

(\\