MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE AUGUST 9, 1985 COMPLErsu BY n n_ connrNow TELEPHONE r314) 6762846n PART A OPERATIONS
SUMMARY
JULY 1985 Callaway operated at 100% power except for a load reduction on 7/5, a Reactor Trip on 7/18. and a Reactor Trip on 7/31.
(See Part E) d PART B PORV AND SAFETY VALVE
SUMMARY
~
NONE CA-#804 851001d623 850731 PDR ADOCK 05000483 05/09/84 R
PDR QDP-ZZ-04204 Page 1 of 4 L
-g6 %i I
Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DATE AucusT 9, 1985 4.
COMPLETED BY R. R. GOODENOW TELEPHONE (314) 676-8460 MONTH JULY 1985 a
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) t MWe-Neti 1
IIO4 17 1094 1098 298 2
3, 1102 0
3 1068 473 4
3 f
987 1079 5
21 676 g
22 1093 849 1101 7
23 1023 1068 1
3 24 1006 1079 9
3 10 1068 26 1093 1032 966 11 27 1046 1100 12 3
974 1101 13 29
(
992 1095 34 15 1084 31 649 to 1100
[0 4
Page 2 of 4 QDP-ZZ-04204
Part D OPERATING DATA REPORT 50-483 DocxET NO.
Callaway UNIT DATE AT'i'i'9T 4 - 149s R. R. GOODENOW COMPLETED 8Y TELEPHONE (114) 676--8460 OPER ATING STATUS
.IULY 1985 Gross Moums IN REPORTING PERico:
75&
- 1. REPORTING PERsco:
30ll MAX. DEPEND. CAP ACITY (Mwe8ert):
1170
- . CURRENTLY AUTHC48 ZED POWER LEVEL (wwti:
DEllGN ELECTRICAL RATING iMw.heo: I171*
At stretch reactor power level which is not a
currently authorized under the operating license.
- 3. POwtm LEVEL TO WHICH RESTRICTED tlP ANYI IM8veNett:
- 4. REASONS FOR RESTRICTION (IP ANYl:
TMiSMONTH YR TO DATE CUMULATIVE
_ _ 9. 5 4600.5 4903.0 69 s scMcER op wouRS REACTOR WA3 CRITICAL 0
0 0
6 RE ACTCR RESERVE SmuTDOWN MOURS 691.7 4505.8 4808.3 7 woVAS CENER ATOR ON LINE 0
0 0
8.' UNaf RESERVE SMUTDOWN MOURS 2,204.437 13.419.499 14.941.524
- 9. GRC$3 THEm8AAL ENERGY GENER ATED IMwMI 745.761 4,719.036 5.058.216 10 GRCSS ELECTRICAL ENERGY GENER ATED IMwMI.
=
708,206 4,474,965 4,797,988 11-NET ELECTRICAL ENERGY GENER ATED IMwMi 94.0%
90.4%
91.02 12 REACTOR SERvlCE F ACTOR 94.0%
90.4%
91.0%
- 13. REACTOR AV Al(AglLITy, ACTom 93.0%
88.6%
89.27 14 UNat SERVICE F ACTOR 93.0%
88.67 89.25 15 uNir Av AiLAsit:TY F ACTom 85.0%
78.SY 79.57 1a. UNir CAPACITY F ACTOR tumac MDC) 81.37*
75.17*
76.07*
17 UNIT CAP ACITY F ACTOR (Umac Design Mwel 7.0%
5.9%
5.67 1s. UNIT FORCED OUTAGE RATE
- 19. SMUTDOwNS SCHEDULED OVER NExT 5 MONTHS (TYPE DATE. ANO QURATION OF EACMs: NONE 20 IF SM8JT DOWN AT END OF REPORT PEml00. ESTtMATED DATE OF STARTUP:
CA-#804 05/09/84 Page 3 of 4 QDP-ZZ-04204
.o O
s t
Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE AUGUST 9, 1985 R. R. GOODENOW COMPLETED BY Rl! PORT MONTil
.itTT,Y 198s '
TELEPHONE (31'4) 676-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DUR AllON THE REACTOR OR NO.
DATE S: SCHEDULED (HOURSI REASON REDUCING POWER CORRECTIVE ACTIONSrMNTS 13 850705 Scheduled 0
B 1
Load reduced for secondary plant equipment maintenance and condenser testing.
14' 850718 Forced 43.0 A
3 Reactor Trip from 100% power due to rod control rectifier failure.
LER 85-034-00 15 850731 Forced 9.3 G
3 Reactor Trip from 100% power due to inadvertent closure of MFIV.
LER 85-036-00 SubedARY:
CA-#804
' 05/09/84 Page 4 of 4 QDP-ZZ-04204
1 UNION EtecTnic COMPANY CALLAWAY PLANT M AaLJ NG ADDR E SG ;
9 O. DOR 630 7 ULTON, MO. S S 2 51 August 9, 1985' Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1150
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JULY 1985 The enclosed Monthly Operating Report for July 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
S. E. Miltenberger Manager, Callaway Plant MET /WRC/RRG/drs Enclosure cc: Distribution attached
cc distribution for ULNRC-1150 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector i