ML20132G774

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1985
ML20132G774
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/31/1985
From: Goodenow R, Miltenberger S
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1150, NUDOCS 8510010623
Download: ML20132G774 (6)


Text

.

MONTHLY OPERATING REPORT DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE AUGUST 9, 1985 COMPLErsu BY n n_ connrNow TELEPHONE r314) 6762846n PART A OPERATIONS

SUMMARY

JULY 1985 Callaway operated at 100% power except for a load reduction on 7/5, a Reactor Trip on 7/18. and a Reactor Trip on 7/31.

(See Part E) d PART B PORV AND SAFETY VALVE

SUMMARY

~

NONE CA-#804 851001d623 850731 PDR ADOCK 05000483 05/09/84 R

PDR QDP-ZZ-04204 Page 1 of 4 L

-g6 %i I

Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-483 UNIT Callaway DATE AucusT 9, 1985 4.

COMPLETED BY R. R. GOODENOW TELEPHONE (314) 676-8460 MONTH JULY 1985 a

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) t MWe-Neti 1

IIO4 17 1094 1098 298 2

3, 1102 0

3 1068 473 4

3 f

987 1079 5

21 676 g

22 1093 849 1101 7

23 1023 1068 1

3 24 1006 1079 9

3 10 1068 26 1093 1032 966 11 27 1046 1100 12 3

974 1101 13 29

(

992 1095 34 15 1084 31 649 to 1100

[0 4

Page 2 of 4 QDP-ZZ-04204

Part D OPERATING DATA REPORT 50-483 DocxET NO.

Callaway UNIT DATE AT'i'i'9T 4 - 149s R. R. GOODENOW COMPLETED 8Y TELEPHONE (114) 676--8460 OPER ATING STATUS

.IULY 1985 Gross Moums IN REPORTING PERico:

75&

1. REPORTING PERsco:

30ll MAX. DEPEND. CAP ACITY (Mwe8ert):

1170

. CURRENTLY AUTHC48 ZED POWER LEVEL (wwti:

DEllGN ELECTRICAL RATING iMw.heo: I171*

At stretch reactor power level which is not a

currently authorized under the operating license.

3. POwtm LEVEL TO WHICH RESTRICTED tlP ANYI IM8veNett:
4. REASONS FOR RESTRICTION (IP ANYl:

TMiSMONTH YR TO DATE CUMULATIVE

_ _ 9. 5 4600.5 4903.0 69 s scMcER op wouRS REACTOR WA3 CRITICAL 0

0 0

6 RE ACTCR RESERVE SmuTDOWN MOURS 691.7 4505.8 4808.3 7 woVAS CENER ATOR ON LINE 0

0 0

8.' UNaf RESERVE SMUTDOWN MOURS 2,204.437 13.419.499 14.941.524

9. GRC$3 THEm8AAL ENERGY GENER ATED IMwMI 745.761 4,719.036 5.058.216 10 GRCSS ELECTRICAL ENERGY GENER ATED IMwMI.

=

708,206 4,474,965 4,797,988 11-NET ELECTRICAL ENERGY GENER ATED IMwMi 94.0%

90.4%

91.02 12 REACTOR SERvlCE F ACTOR 94.0%

90.4%

91.0%

13. REACTOR AV Al(AglLITy, ACTom 93.0%

88.6%

89.27 14 UNat SERVICE F ACTOR 93.0%

88.67 89.25 15 uNir Av AiLAsit:TY F ACTom 85.0%

78.SY 79.57 1a. UNir CAPACITY F ACTOR tumac MDC) 81.37*

75.17*

76.07*

17 UNIT CAP ACITY F ACTOR (Umac Design Mwel 7.0%

5.9%

5.67 1s. UNIT FORCED OUTAGE RATE

19. SMUTDOwNS SCHEDULED OVER NExT 5 MONTHS (TYPE DATE. ANO QURATION OF EACMs: NONE 20 IF SM8JT DOWN AT END OF REPORT PEml00. ESTtMATED DATE OF STARTUP:

CA-#804 05/09/84 Page 3 of 4 QDP-ZZ-04204

.o O

s t

Part E DOCKET NO.

50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE AUGUST 9, 1985 R. R. GOODENOW COMPLETED BY Rl! PORT MONTil

.itTT,Y 198s '

TELEPHONE (31'4) 676-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DUR AllON THE REACTOR OR NO.

DATE S: SCHEDULED (HOURSI REASON REDUCING POWER CORRECTIVE ACTIONSrMNTS 13 850705 Scheduled 0

B 1

Load reduced for secondary plant equipment maintenance and condenser testing.

14' 850718 Forced 43.0 A

3 Reactor Trip from 100% power due to rod control rectifier failure.

LER 85-034-00 15 850731 Forced 9.3 G

3 Reactor Trip from 100% power due to inadvertent closure of MFIV.

LER 85-036-00 SubedARY:

CA-#804

' 05/09/84 Page 4 of 4 QDP-ZZ-04204

1 UNION EtecTnic COMPANY CALLAWAY PLANT M AaLJ NG ADDR E SG ;

9 O. DOR 630 7 ULTON, MO. S S 2 51 August 9, 1985' Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1150

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JULY 1985 The enclosed Monthly Operating Report for July 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

S. E. Miltenberger Manager, Callaway Plant MET /WRC/RRG/drs Enclosure cc: Distribution attached

cc distribution for ULNRC-1150 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector i

--.a

--.. -,,.