ML20132G743

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Procedure 1A,1B, Auxiliary Feed Pumps Overspeed Trips, Rev 0 to Procedure 10, Review of Operation of PORV & Rev 2 to Procedure 12, Auxiliary Feedwater Sys Valve Problem Analysis (AF 599 & AF 608).
Date released: 05/25/2020 Download: ML20132G743


Rev 2 to Procedure 12, Auxiliary Feedwater Sys Valve Problem Analysis (AF 599 & AF 608).
ML20132G756
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/26/1985
From: Long J
TOLEDO EDISON CO.
To:
References
Download: ML20132G756 (6)
Rev 0 to Procedure 10, Review of Operation of Porv.
ML20132G750
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/22/1985
From: Isley T
TOLEDO EDISON CO.
To:
References
Download: ML20132G750 (6)
Rev 1 to Procedure 1A,1B, Auxiliary Feed Pumps Overspeed Trips.
ML20132G745
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/25/1985
From: Wilczynski D
TOLEDO EDISON CO.
To:
References
Download: ML20132G745 (53)
Forwards Rev 1 to Procedure 1A,1B, Auxiliary Feed Pumps Overspeed Trips, Rev 0 to Procedure 10, Review of Operation of PORV & Rev 2 to Procedure 12, Auxiliary Feedwater Sys Valve Problem Analysis (AF 599 & AF 608).
ML20132G738
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/27/1985
From: Rossi C
NRC - TEAM ON DAVIS-BESSE EVENT
To: HOLAHAN G M, JORDAN E L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
References
Download: ML20132G738 (1)