-;,~.,Y RECEIVED NRC Arizona Nuclear Power Project 1985 a l7 AM 11: 14 P.O. BOX 52034
- PHOENIX, ARIZONA 85072-2034 f
REGION VIM July 15, 1985 ANPP-33013-TDS/TPS U. S. Nuclear Regulatory Commission 80 'Obb Region V S6 - 5 M 1450 Maria Lane - Suite 210 51 - 535 Walnut Creek, California 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Subj ect:
Time Extension for Report - DER 85-07 A 50.55(e) Potentially Reportable Deficiency Relating to Lack of Bolt Nut Retention Mechanism on CE Instrument Rack Design File:
85-019-026; D.4.33.2
Reference:
(A) Telephone conversation between L. Miller and T. Bradish on March 5, 1985 (B) ANPP-32329, dated April 8, 1985 (Interin Report)
(C) ANPP-32654, dated May 16, 1985 (Time Extension)
(D) ANPP-32828, dated June 13, 1985 (Time Extension)
Dear Sir:
The NRC was notified of a pctentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).
Time Extensions were requested by References (C) and (D). Our last forecast indicated that the Final Report would be completed by July 12, 1985.
Due to the eYtensive investigation and final evaluation of the bolting material used, it is now expected that this information will be finalized by August 12, 1985, at which time a complete report will be submitted.
There is no new information or change to the Intnrim Report at this time.
Very truly yours, LEGLhkrg 8508050125 850715 PDR ADOCK 05000528 E. E. Van Brunt, Jr.
S PDR Executive Vice President Project Director EEVB/TPS/jb 4
fa[r cc:
See Page Two
/
'o
r:'
'l
.1 S,,-
m LMr.
D.'F. Kirsch DER 85-07 C.
.Page Two ec:. Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 D. B. Karner W.JE. Ide D. B.-Fasnacht
' A. C. Rogers
- L. A. Souza D. E. Fowler
' T. D. Shriver C. N. Russo
. B. S. Kaplan J. R. Bynum J. M.' Allen D. Canady; A. C. Gehr-W..J.
Stubblefield W. G. Bingham R. -L'.'- Patterson R. W. Welcher
~
H. D. Foster D. R. Hawkinson.
R. P. Zimmerman M. L. Clyde B. T. Parker T. J.. Bloom-D. N. Stover J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Power Operations
. 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 4m a
y a
_y-
,--m
.c y
w
- -