Deficiency Rept DER 85-16 Re AHU Fan Wheel Hub Casting Failure.Initially Reported on 850507.Final Rept Delayed Until 850814
ML20132G713
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/15/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-33012-TDS, DER-85-16, NUDOCS 8508050118
Download: ML20132G713 (2)


Text

r 2.

!C Arizona Nuclear Power Project

[ M ll: lk P.O. BOX 52034 e PHOENIX ARIZONA 85072-2034 REGIONVli;E July 15, 1985 ANPP-33012-TDS/TPS N'

U. S. Nuclear Regulatory Commission Se-SM Region V M' W 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Time Extension for Report - DER 85-16 A 50.55(e) Iotentially Reportable Deficiency Relating to AHU Fan Wheel Hub Casting Failure File: 85-019-026; D.4.33.2 e

Reference:

(A) Telephone conversation between R. C. Sorensen and P. J. Coffin on May 7, 1985 (B) ANPP-32787, dated June 6, 1985 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by July 12, 1985.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by August 14, 1985, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

[

(

P E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/TPS/jb cc:

See Page Two 8508050118 850715 PDR ADOCK 05000528-p O M

S PDR fE-JT

a-

'..f.

Mr. D. F. Kirsch DER 85-16 Page Two'

~

cc:- Richard DeYoung, Director-Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington. D. C.

20555

.D..B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B..S. Kaplan J. R. Bynum J.

M.. Allen D. Canady-A. C. Gehr W. J. Stubblefield W. G. Bingham.

R. L. Patterson R.~ W. Welcher H.-D.

Foster D. R. Hawkinson R. P. Zimmerman M. L. Clyde B. T. Parker T.?J. Bloom D. N.' Stover J. D. Houchen

~J.

E. Kirby Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 O