ML20132G436

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-266/96-17 & 50-301/96-17 on 961118-1202 (Ref 10CFR73.21).Violations Noted
ML20132G436
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/19/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20132G391 List:
References
50-266-96-17, 50-301-96-17, NUDOCS 9612260257
Download: ML20132G436 (1)


See also: IR 05000266/1996017

Text

_ .

_

_

_

_

4

-

i

e

U. S. NUCLEAR REGULATORY COMMISSION

REGION III

.

!

Docket Nos:

50-266; 50-301

Licenses No:

DPR-24; DPR-27

Reports No.

50-266/96017(DRS); 50-301/96017(DRS)

Licensee:

Wisconsin Electric Power Company

Facility:

Point Beach Nuclear Power Plant

Location:

6610 Nuclear Road

Two Rivers, WI 54241

Dates:

Between November 18 and December 2, 1996

Inspector:

Terry J. Madeda, Physical Security Inspector

Approved by:

James R. Creed, Chief, Plant Support Branch 1

Division of Reactor Safety

i

9612260257 961219

PDR

ADOCK 05000266

G

PDR