PROPOSED TECHNICAL SPECIFICATION CHANGES 1

1 1

i t

i l

l l

t-i 1

i l

l i

i-I i

i i

l l

f i

G i

9612260238 961219 1-PDR ADOCK 05000368 P

PDR

a.

ADMINISTRATIVE CONTROL CORE OPERATING LIMITS REPORT 9)

"CESEC-Digital Simulation of a Combustion Engineering Nuclear Steam j

Supply System," December 1981 (Methodology for Specifications j

3.1.1.1 and.3.1.1.2 for Shutdown Margin, 3.1.1.4 for MTC, 3.1.3.1 for CEA Position, 3.1.3.6 for Regulating CEA and Group P Insertion l

}

Limits, and 3.2.4.b for DNBR Margin).

I

10) " Technical Manual for the CENTS Code," CENPD 282-P-A, February 1991 (Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown 1

Margin, 3.1.1.4 for MTC, 3.1.3.1 for CEA Position, 3.1.3.6 for Regulating and Group P Insertion Limits, and 3.2.4.b for DNBR Margin.

11) Letter:

0.D. Parr (NRC) to F.M. Stern (CE), dated June 13, 1975 l

(NRC Staff Review of the Combustion Engineering ECCS Evaluation Model). NRC approval for 6.9.5.1.4, 6.9.5.1.5, and 6.9.5.1.8 methodologies.

i

12) Letter:

0.D.

Parr (NRC) to A.E.

Scherer (CE), dated December 9, 1975 l

l (NRC Staff Review of the Proposed Combustion Engineering ECCS Evaluation Model changes). NRC approval for 16.9.5.1.6 j

methodology.

1 i

13) Letter 2CNA038403, dated March 20, 1984, J.R. Miller (NRC) to l

J.M. Griffin (APEL), "CESEC Code Verification."' NRC approval for 6.9.5.1.9 methodology.

6.9.5.2 The core operating lindts shall be determined so that all applicable limits (e.g. fuel thenmal-mechanical lindts, core thermal-hydraulic limits, j

ECCS limits, nuclear limits such as shutdown nargin, and transient and accident j

analysis limits) of the safety analysis are met.

i 6.9.5.3 The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions J

j or supplements thereto, shall be provided upon issuance to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.

4 1

i i

I i

4 I

ARKANSAS - UNIT 2 6-21a Amendment No. W, M4, M9

\\

s e

i l

i MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS (FOR INFO ONLY)

-.-~

ADMINISTRATIVE CONTROL CORE OPERATING LIMITS REPORT 9)

"CESEC-Digital Simulation of a Combustion Engineering Nuclear Steam Supply System," December 1981 (Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margin, 3.1.1.4 for MTC, 3.1.3.1 for M;c;ble Cent: 1 A::::ili :

CEA Position, 3.1.3.6 for l

Regulating CEA and Group P Insertion Limits, and 3.2.4.b for DNBR Margin).

10) " Technical Manual for the CENTS Code," CENPD 282-P-A, February 1991 (Methodoloav for SpecificatLons 3.1.1.1 and 3.1.1.2 for Shutdown Marain, 3.1.1.4 for MTC, 3.1.3.1 for CEA Position, 3.1.3.6 for Reculatina and Group P Insertion Limits, and 3.2.4.b for DNBR

]

Marcin..

i 141) Letters O.D.

Parr (NRC) to F.M. Stern (CE), dated June 13, 1975 l

(NRC Staff Review of the Combustion Engineering ECCS Evaluation Model). NRC approval for 6.9.5.1.4, 6.9.5.1.5, and 6.9.5.1.8 methodologies.

lig) Letter:

0.D.

Parr (NRC) to A.E. Scherer (CE), dated December 9, 1975 l

(NRC Staff Review of the Proposed Combustion Engineering ECCS Evaluation Model changes). NRC approval for 6.9.5.1.6 i

methodology.

133) Letter: 2CNA038403, dated March 20, 1984, J.R. Miller (NRC) to l

l J.M. Grif fin (AP&L), "CESEC Code Verification." NRC approval l

for 6.9.5.1.9 methodology.

j i

l 6.9.5.2 The core operating limitt shall be determined so that all applicable l

limits (e.g. fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear lindts such as shutdown margin, and transient and accident j

analysis limits) of the safaty analysis are met.

l 6.9.5.3 The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.

l 1

i l

1 l

l l

i l

j k

ARKANSAS - UNIT 2 6-21a Amendment No. M4,M4,M9 i

(

1 4,

)

?

.i j-i 1

j l

)

i i

i i

^

i

\\

5 i

PROPOSED TECHNICAL SPECIFICATION CHANGES SHOULD SBLOCA j

AMENDMENT BE APPROVED PRIOR TO THIS REOUEST 1

9 e

1 4

i e

9

c.

ADMXNISTRATIVE CONTROL i

CORE OPERATING LIMITS REPORT

10) "CESEC-Digital Simulation of a Combustion Engineering Nuclear Steam Supply System," December 1981 (Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margin, _3.1.1.4 for MTC, 3.1.3.1 for CEA Position, 3.1.3.6 for Regulating CEA and Group P Insertion l Limits, and 3.2.4.b for DNBR Margin).
11) " Technical Manual for the CENTS Code," CENPD 282-P-A, February 1991 (Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown

]

Margin, 3.1.1.4 for MTC, 3.1.3.1 for CEA Position, 3.1.3.6 for Regulating and Group P Insertian Limits, and 3.2.4.b for DNBR Margin.

12) Letter:

0.D.

Parr (NRC) to F.M. Stern (CE), dated June 13, 1975 l

(NRC Staff Review of the Combustion Engineering ECCS Evaluation 1

Model). NRC approval for 6.9.5.1.4, 6.9.5.1.5, and 6.9.5.1.8 methodologies.

l

13) Letter:

O.D.

Parr (NRC) to A.E.

Scherer (CE), dated December 9, 1975 l

(NRC Staff Review of the Proposed Combustion Engineering ECCS Evaluation Model changes). NRC approval for 6.9.5.1.6 methodology.

14) Letter:

K. Kniel (NRC) to A.E. Scherer (CE), dated September 27, 1977 l

(Evaluation of Topical Reports CENPD-133, Supplement 3-P and CENPD-137, Supplement 1-P). NRC approval for 6.9.5.1.9 methodology.

15) Letter 2CNA038403, dated March 20, 1984, J.R. Miller (NRC) to l

J.M. Griffin (AP&L), "CESEC Code Verification." NRC approval for 6.9.5.1.10 methodology.

6.9.5.2 The core operating limits shall be determined so that all applicable limits (e.g. fuel thenwl-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, and transient and accident analysis limits) of the safety analysis are met.

6.9.5.3 The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.

ARKANSAS - UNIT 2 6-21a Amendment No. -lM, M4, M9,