Forwards SER Re Submitting Topical Rept TR-087, Rev 0, TMI-1 Core Thermal-Hydraulic Methodology Using VIPRE-01 Computer Code
ML20132F845
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/19/1996
From: Norris J
NRC (Affiliation Not Assigned)
To: James Knubel
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20132F849 List:
References
TAC-M92168, NUDOCS 9612260112
Download: ML20132F845 (3)


Text

4 December 19, 1996 Mr. James Knubel i

Vice President and Director.- TMI GPU Nuclear Corporation Post Office Box 480 Middletown, PA 17057-0480

SUBJECT:

REVIEW 0F TOPICAL REPORT TR-087 ENTITLED TMI-I CORE THERMAL-HYDRAULIC METHODOLOGY USING VIPRE-01 COMPUTER CODE FOR THREE MILE ISLAND UNIT 1 (TAC NO. M92168)

Dear Mr. Knubel:

By letter dated April 25, 1995, GPU Nuclear (GPU), the licensee for Three Mile Island, Unit 1 (TMI-1), submitted topical report TR-087, Revision 0, "TMI-1 core thermal-hydraulic Methodology Using the VIPRE-01 Computer Code," for staff review and approval. The submittal was supplemented by response to a request for additional information dated June 13, 1996. On September 24-25, 1996, the staff met with GPU to verify aspects of the GPU analyses. The topical report presents the methods for performing steady-state and transient thermal-hydraulic analyses of the nuclear reactor core for normal operating conditions and several accident conditions. The staff has reviewed the submittals and, with consideration of the audit findings, concluded that GPU has demonstrated the adequacy of the TMI-l model and their ability to apply the VIPRE-01 code for performing licensing calculations. Our Safety Evaluation is enclosed. This completes our efforts on this issue and, consequently, we are closing TAC No. M92168.

1 Sincerely, (Original Signed By)

Jan A. Norris, Sr. Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-289 Distribution Docket File PEselgroth, RI

Enclosure:

As stated PUBLIC p

I PDI-3 cc w/ enclosure:

See next page SVarga JZwolinski g\\)

JStolz JNorris i

EDunnington

\\

ACRS

\\

i OGC DOCUMENT NAME G:\\NORRIS\\92168.TMI Ta snoelve a sepy of sideg==== Inesses in the hem: 'C' = copy without ettechenent/epatosure

  • E' = copy with attachment / enclosure
  • N" = No copy 0FFICE PM:PDMN l 6 LA:PD2-2 l s' D:PDI43 N l

l l

NAME JNorris)B EDunnington Ifb JStolzV /b DATE 11/q7/96 12//v/96 12/3) /96 0FFICIAL f:ECORD COPY

{-6 N 2G0008 9612260112 961219 PDR ADOCK 05000289 P

PDR J

l ncuq UNITED STATES a

y:

j NUCLEAR REGULATORY COMM;3SION 2

WASHINGTON, D.C. enans m December 19, 1996 Mr. James Knubel Vice President and Director - TMI GPU Nuclear Corporation Post Office Box 480 Middletown, PA 17057-0480

SUBJECT:

REVIEW OF TOPICAL REPORT TR-087 ENTITLED TMI-1 CORE THERMAL-HYDRAULIC METHODOLOGY USING VIPRE-01 COMPUTER CODE FOR THREE MILE ISLAND UNIT 1 (TAC NO. M92168)

Dear Mr. Knubel:

By letter dated April 25, 1995, GPU Nuclear (GPU), the licensee for Three Mile Island, Unit 1 (TMI-1), submitted topical report TR-087, Revision 0, "TMI-l core thermal-hydraulic Methodology Using the VIPRE-01 Computer Code," for staff review and approval. The submittal was supplemented by response to a request for additional information dated June 13, 1996. On September 24-25, 1996, the staff met with GPU to verify aspects of the GPU analyses. The topical report presents the methods for performing steady-state and transient thermal-hydraulic analyses of the nuclear reactor core for normal operating conditions and several accident conditions. The staff has reviewed the submittals and, with consideration of the audit findings, concluded that GPU has demonstrated the adequacy of the TMI-I model and their ability to apply the VIPRE-01 code for performing licensing calculations. Our Safety Evaluation is enclosed. This completes our efforts on this issue and, consequently, we are closing TAC No. M92168.

Si cerely, f

T ca.

Jan A. Norris, Sr. Project Manager project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

As stated cc w/ enclosure: See next page

l' Three Mile Island Nuclear Station, Unit No. 1 l

cc:

l Michael Ross Robert B. Borsum Director, O&M, TMI B&W Nuclear Technologies GPU Nuclear Corporation Suite 525 P.O. Box 400 1700 Rockville Pike Middletown, PA 17057 Rockville, MD 20852 John C. Fornicola William Dornsife, Acting Director i

Director, Planning and Bureau of Radiation Protection l

Regulatory Affairs Pennsylvania Department of i

GPU Nuclear Corporation Environmental Resources 100 Interpace Parkway P.O. Box 2063 Parsippany, NJ 07054 Harrisburg, PA 17120 Jack S. Wetmore Dr. Judith Johnsrud Manager, TMI Regulatory Affairs National Energy Comittee GPU Nuclear Corporation Sierra Club P.O. Box 480 433 Orlando Avenue Middletown, PA 17057 State College, PA 16803 Ernest L. Blake, Jr., Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.

Washington, DC 20037 Chairman i

Board of County Comissioners i

of Dauphin County Dauphin County Courthouse Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Michele G. Evans Senior Resident Inspector (TMI-1)

U.S. Nuclear Regulatory Commission P.O. Box 311 Middletown, PA 17057 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

-