ML20132F785

From kanterella
Jump to navigation Jump to search
Issues New License Condition 2.1.3 to Amend SG-2 of License SNM-1107,maintaining Status Quo Until New 10CFR74 Fundamental Nuclear Matl Control Plan Approved & Implemented
ML20132F785
Person / Time
Site: Westinghouse
Issue date: 05/29/1985
From: Brown W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Sanders C
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 8508020383
Download: ML20132F785 (2)


Text

J DESIGNATED ORIGINAL MRBUMN

Docket File 70-1151 Case File DJoy E4Y 2 91985 R Jackson SGFF r/f NMSS r/f .

SGFF:DRJ CNSmith 70-1151 ESuarez WCrow, FC LICobb, IE Westinghouse Electric Corporation EMcAlpine, RII Nuclear Fuel Division--Columbia Plant RDube ATTN: Mr. C. F. Sanders, Manager DWeiss Nuclear Materials Management RFonner Drawer R Columbia, South Carolina 29205 Gentlemen: -

The purpose of this letter is to clarify that certain licensees, subject to -

the provisions of new 10 CFR Part 74, must continue to follow their existing Part 70 Fundamental Nuclear Material Control (FNMC) Plan, as required by Condition 2.1 of the Safeguards Amendment to their SNM license until a new Part 74 FNMC Plan is approved and implemented.

Your current FNMC Plan was approved in the context of 10 CFR Part 70 and approval relied upon certain provisions of Part 70 that were not recapitulated in the license for the full effectiveness of the Plan. Because of this, it is now necessary to issue a license condition to incorporate the omitted Part 70 requirements to be in effect until a new FNMC Plan is appraved and implemented -

pursuant to 10 CFR 74.31(b). At that time your Safeguards Amendment will be revised in its entirety and reissued, and the following condition will be deleted. Thus, the condition added by this letter will serve to maintain the status quo until the new Plan is implemented.

Accordingly, we are hereby issuing new License Condition 2.1.3 to Amendment SG-2 of License No. SNM-1107, effective immediately, to read as follows:

2.1.3 Notwithstanding 10 CFR 74.31(c), the material control and accounting procedures for all low enriched uranium subject to the existing FNMC Plan, as identified in Condition 2.1, shall continue to -include all requirements in 10 CFR 70.51, .

70.57, and 70.58 that were applicable prior to March 27, 1985, except as noted in other conditions in this Amendment.

This matter was discussed between your Mr. C. F. Sanders and our Mr. D. R. Joy during a phone conversation on May 17, 1985, and was mutually agreed upon.

8508020383 850529

{DR ADOCK 07001151 PDR

e

)v Mr. C. F. Sanders We would also like to point out that your new Part 74 FNMC Plan must contain specific commitments that are fully and clearly described, and which are consistent with the acceptance criteria presented in NUREG-1065 (Rev. 1). .4 e urge you to study and use NUREG-1065 (Rev. 1) when compiling your new Plan so as to minimize requests for additional information or clarification and to minimize the time for the review and approval process.

It has been determined that the review of your new Plan, required by 10 CFR 74.31(b)(1), will be conducted on a fee chargeable basis; therefore, your submittal should be accompanied with a check in the amount of $150.

Should you have any further questions in this matter, please call Ray Jackson on (301) 427-4757 or Don Joy on 427 4756.

Sincerely, OdgM sW Dy Wherd 8. tuc n Willard B. Brown, Chief Fuel Facility Safeguards Licensing Branch Division of Safeguards, NMSS l

. olf)/$/

l .J A . y . . , g, f, JQi()

C  : FF :SGFF :LFMB :SG J  : ELD ';'~ fSG W o )4

" ^

____3'd,d /:SGFF *,,

l J__:_____..._i___:__ _

1 . _____:.___. M _',_:-________--

g__::DJo E RJackson :DWeissq' :RDube

CS f, :RFonnef :WBrown C__:____.___:: . . ________:____ . ___ .:-- . _______:-_______ -__:__-_____-___:________-__

IE: /8

5/'r' /85  : 5/. /85 :5/_ /85 :5/g%85 :5/ ~/85 :5 /85 m -

_ -