ML20132F683

From kanterella
Jump to navigation Jump to search
Forwards Engineering Assurance Program Implementation Insp Rept 50-498/85-09 at S&W,Boston,Ma on 850423-26.Open Items, Including Lack of Traceability of Some Design Input Info, Will Be Examined During Future Insps
Date released: 05/25/2020 Download: ML20132F683


Implementation Insp Rept 50-498/85-09 at S&W,Boston,Ma on 850423-26.Major Areas Inspected:Engineering Assurance Program.Program Capable of Evaluating Adequacy of Design & Effectiveness of Design Process for Sys Being Reviewed
ML20132F708
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 06/25/1985
From: Imbro E, Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
Download: ML20132F708 (9)
Forwards Engineering Assurance Program Implementation Insp Rept 50-498/85-09 at S&W,Boston,Ma on 850423-26.Open Items, Including Lack of Traceability of Some Design Input Info, Will Be Examined During Future Insps
ML20132F680
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 07/12/1985
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: GOLDBERG J H
HOUSTON LIGHTING & POWER CO.
References
Download: ML20132F680 (5)