Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 1999-09-03
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20207G3081999-06-0808 June 1999 Discusses Providing NRC Biological Assessment of Impact to Sea Turtles at Plant.Forwards Comments on Draft Biological Opinion Re Impact to Sea Turtles at Plant ML20195F3071999-06-0404 June 1999 Forwards Insp Rept 50-302/99-02 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206N5511999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Sr Peterson Will Be Section Chief for Crystal River Npp.Organization Chart Encl ML20206P5411999-05-0606 May 1999 Forwards Insp Rept 50-302/99-02 on 990228-0410.No Violations Noted.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206G1971999-05-0404 May 1999 Forwards Summary of 990412 & 14 Telcon with FPC Representatives Re NRC Questions Concerning Util 980729 & 1120 Ltrs Requesting Approval to Adopt NEI 97-03 Draft Final Rev 3, Methodology for Development of Eal ML20206K4461999-04-27027 April 1999 Forwards Notice of Withdrawal in Response to Util 990412 Request for Withdrawal of Application & Suppl by for Amend Re Normal Standby Position of Dh Removal Sys Valves DHV-34 & DHV-35 ML20206B9141999-04-20020 April 1999 Refers to Open Mgt Meeting Conducted at Licensee Request in Atlanta,Ga on 990414 Re Recent Crystal River 3 Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20205S4741999-04-20020 April 1999 Informs That NRC Determined FTI Topical Rept BAW-2342P,Rev 0,entitled OTSG Repair Roll Qualification Rept,Addendum a, Marked as Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) ML20205T3241999-04-0909 April 1999 Informs That on 990402,K Mccall & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Plant for Y2K Initial Exam Dates Are Wks of 000828 & 0911 for Approx Nine Candidates ML20205K6001999-04-0808 April 1999 Forwards Draft Biological Opinion from National Marine Fisheries Service Re Impact on Endangered Sea Turtles of Operation of Crystal River Energy Complex for Review & Comment ML20205K6111999-04-0202 April 1999 Forwards Request for Addl Info Re Util 980416 & Revised 981130 Submittals of Third 10-year Inservice Insp Program for Crystal River Unit 3 ML20205Q4871999-03-29029 March 1999 Forwards Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted ML20205D5101999-03-26026 March 1999 Discusses FPC 961008 & 970228 Responses to NRC RAI Re Postulated Failure of RCP Seal Area Heat Exchanger Which Could Cause Overpressurization of Nuclear Svcs Closed Cycle Cooling Sys.Determined That in-depth Study Not Needed ML20205D3391999-03-22022 March 1999 Advises of NRC Planned Insp Effort Resulting from Plant PPR Completed on 990203,to Develop Integrated Understanding of Safety Performance.Historical Listing of Plant Issues & Details of Insp Plan for Next Eight Months Encl ML20204J5601999-03-22022 March 1999 Confirms 990309 Telcon Between R Mclaughlin of Licensee Staff & Ninh of NRC Re Mgt Meeting to Be Held at Licensee Request & Scheduled for 990313 in Atlanta,Ga to Discuss Recent Crystal River 3 Performance ML20207L3501999-03-0404 March 1999 Forwards Request for Addl Info Re 980730 License Amend Request 222 on Control Room Emergency Ventilation Sys IR 05000302/19982011999-02-16016 February 1999 Forwards Operational Safeguards Insp Rept 50-302/98-201 on 980504-06.No Violations Noted.Briefings,Observations,Drills & Exercises Indicated That Modified Protection Strategy Generally Sound.Without Encl ML20203G4891999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20203A4301999-02-0303 February 1999 Forwards SE Re 3 EAL Changes.Nrc Has Concluded That Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 & Therefore Acceptable ML20206S4191999-01-26026 January 1999 Forwards FEMA Final Exercise Rept for 981014,emergency Response Exercise.No Deficiencies or Areas Requiring Corrective Action Were Identified During Exercise ML20199J8701999-01-14014 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of agency-wide Streamlining Effort. Copy of Organization Charts Encl for Info ML20199F4971999-01-11011 January 1999 Confirms FPC Informing That Request for USNRC Review of Topical Rept Boron Dilution by RCS Hot Leg Injection Submitted on 970227 Was Being Withdrawn.Informs That All Remaining Review Effort for Request,Canceled ML20199E3441999-01-11011 January 1999 Confirms Licensee Informing NRC That Request for Exemption from Requirements of 10CFR70.24(a) for Crystal River Unit 3,submitted by Util by Ltr Being Withdrawn ML20199D6071999-01-0404 January 1999 Forwards Insp Rept 50-302/98-10 on 981025-1205 & Notice of Violation.Nrc Concluded That Info Re Reason for Violation, C/A Taken & Plan to Correct Violation & Prevent Recurrence Already Adequately Addressed ML20199E3991998-12-23023 December 1998 Discusses Training Managers Conference Conducted at RB Russell Bldg on 981105.Agenda Used for Conference,List of Attendees,Slide Presentation & Preliminary Schedule for FY99 & FY00 Encl ML20198N9051998-12-16016 December 1998 Forwards Insp Rept 50-302/98-13 on 981116-20.No Violations Noted.Insp Consisted of Selective Exams of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20196H2511998-12-0101 December 1998 Forwards Insp Rept 50-302/98-12 on 981013-16.No Violations Noted.Insp Team Observed Selected Portions of Emergency Organizations Response in Key Facilities During EP Plume Exposure Exercise ML20196C2931998-11-24024 November 1998 Forwards Notice of Withdrawal of 971031 Application for Amend to License ML20196A5321998-11-23023 November 1998 Ack Receipt of That Informed of Clarifications Needed Re Time Necessary to Start Control Complex Chillers at Plant,After Loss of Offsite Power.Changes to Start Times Do Not Alter Conclusion in SE Supporting Amend 163 to TSs ML20196C6291998-11-20020 November 1998 Advises of Planned Insp Effort Resulting from Insp Planning Meeting Held on 981102.Insp Plan for Next 4 Months & Historical Listing of Plant Issues,Called Plant Issues Matrix, Encl ML20195G4461998-11-17017 November 1998 Discusses FPC 980518 Submittal of Operational Assessment of Once Through SG Tube Degradation at CR-3 in Accordance with License Commitment Submitted on 971207 1999-09-03
[Table view] |
Text
_ _ - _ _ . _ _ _ _ _ _ . . _ _ _ _ _ _ - _ . _ . _ . _ _ _ _ _ _ _
e ster p 4 UNITED STATES 3
.g
'j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. eassa nei
\,.....
l December 20, 1996 I;
- Mr. Percy M. Beard, Jr.
Senior Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing (SA2A)
Crystal River Energy Complex 15760 W Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 - FINAL SAFETY ANALYSIS REPORT REVISION 23
Dear Mr. Beard:
By letter dated November 18, 1996, you submitted Revision 23 to the Crystal River Unit 3 Final Safety Analysis Report (FSAR). The FSAR Revision 23 included changes to the facility that have been implemented as of the end of Refuel 10 which was completed in May 1996.
10 CFR 50.59, " Changes, Tests and Experiments," permits licensees to make changes in the facility or procedures as described in the FSAR without prior Commission approval, unless the proposed change involves an unreviewed safety question (USQ). A proposed change shall be deemed to involve an unreviewed safety question if the probability of occurrence of a malfunction of equipment important to safety previously evaluated in the SAR may be increased, if a possibility for an accident or malfunction of a different type than any l evaluated-previously in the SAR may be created, or if the margin of safety as ;
defined in the basis for any technical specification is reduced. i We understand from your November 18, 1996, submittal that you made the FSAR changes to reflect previously issued license amendments or other NRC approved changes. You also made other FSAR changes to reflect plant operational evolutions and to resolve design problems which have not been reviewed by the NRC. Our initial review of the FSAR revision indicates that some of these changes may involve an USQ. Enclosed are two of several examples of the FSAR changes which may involve an USQ.
i SC FRICENTER COM
\
240065 9612240311 961220 DR ADOCK050003j2
l :
' i i . .
i l
P. Beard, Jr. l Within 15 days of receipt of this letter, please schedule a meeting.with us to )
discuss the bases for your determination that the FSAR Revision 23 changes do not involve an USQ. We discussed this request today with your licensing staff who have agreed to the meeting. If you have any questions regarding this matter please contact me at (301) 415-1471 or write to me. ,
Sincerely, l
l ORIGINAL SIGNED BY: -
l L. Raghavan, Project Manager !
l Project Directorate 11-3 ;
Division of Reactor Projects - I/II l Office of Nuclear Reactor Regulation j i
Docket No. 50-302
Enclosure:
As stated cc w/ enclosure: See next page Distribution Docket File >
Public !
CR3 Reading [
F. Miraglia A. Thadani i R. Zimmerman l S. Varga ;
J. Zwolinski i OGC ACRS J. Jaudon, R-II DOCUMENT NAME: G:\ CRYSTAL \FSAR.MTG
'To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy 0FFICE PO!! 3/P98 l PDIl 3/LA l PDII 3/D ) lLf I l NM LReghaven W BClayton FNebdon hf DATE \l/19/ h /qf / % It./ OO /9 6, j 0FFICIAL RECORD COPY l
I o
.- Mr. Percy M. Beard, Jr. CRYSTAL RIVER UNIT NO. 3 Florida Power Corporation GENERATING PLANT cc:
Mr. R. Alexander Glenn Chairman Corporate Counsel Board of County Commissioners Florida Power Corporation Citrus County MAC-A5A 110 North Apopka Avenue P.O. Box 14042 Iverness, Florida 34450-4245 St. Petersburg, Florida 33733-4042 Mr. Larry C. Kelley, Director Mr. Bruce J. Hickle, Director Nuclear Operations Site Support Nuclear Plant Operations (NA2C) (SA2A)
Florida Power Corporation Florida Power Corporation Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 !
Mr. Robert B. Borsum Senior Resident Inspector B&W Nuclear Technologies Crystal River Unit 3 1700 Rockville Pike, Suite 525 U.S. Nuclear Regulatory Commission Rockville, Maryland 20852 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. Bill Passetti Office of Radiation Control Mr. Gary Boldt Department of Health and Vice President - Nuclear Production Rehabilitative Services Florida Power Corporation 1317 Winewood Blvd. Crystal River Energy Complex Tallahassee, Florida 32399-0700 15760 W. Power Line Street Crystal River, Florida 34428-6708 Attorney General Department of Legal Affairs Regional Administrator, Region II 1 The Capitol U.S. Nuclear Regulatory Commission Tallahassee, Florida 32304 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. Joe Myers, Director Division of Emergency Preparedness Mr. Kerry Landis Department of Community Affairs U.S. Nuclear Regulatory Commission I 2740 Centerview Drive 101 Marietta Street, N.W. Suite 2900 Tallahassee, Florida 32399-2100 Atlanta, Georgia 30323-0199
l CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 l
FINAL SAFETY ANALYSIS REPORT. REVISION 23 j TWO EXAMPLES OF FSAR CHANGES WHICH MAY INVOLVE US0s i
- 1. RCS Cold Lea Small Break LOCA
. Prior revision 23, FSAR Section 6.1.3.1.1, stated that:
1 l "To mitigate an accident resulting from a small break at the RCP i discharge which initiates the HPI System but not the LPI [ low pressure j injection] System, HPI [high pressure injection] flow to the reactor j must be the equivalent of 70% of the flow of one HPI pump. The
! following injection line/ pump configurations will result in at least the j required flow:
- a. 4 lines with 2 HPI pumps.
l b. 4 lines with 1 HPI pump.
l c. 3 lines with 2 HPI pumps. ;
- d. 2 lines with 2 HPI pumps. !
i The dual power source provision (see Section 6.1.2.1.1) of the HPI valves assures that one of these configurations will be achievable in the event of the worst case single failure during a small break LOCA."
There were no operator actions credited to mitigate this event.
FSAR Revision 23 describes a new scenario and indicates that a loss of electrical power to one train of ES equipment would create the worst case scenario. In the first 10 minutes, one HPI pump would be injecting through two HPI injection lines. This HPI line/ pump configuration is different from that described in the FSAR prior to Revision 23.
In addition, the revised HPI system configuration includes operator action.
a) Ist 10 minutes: One HPI pump injecting through two HPI injection lines.
Inherent flow differences in the HPI injection lines combined with no automatic isolation of the normal makeup flow and the RCP [ reactor coolant pump] seal injection flow result in only 36% of the total HPI flow [as compared to 70% of the flow of one HPI pump] going to the core.
b) 2nd 10 minutes: Operator swaps the electrical power supply for the remaining two injection valves to the operating emergency diesel generator.
c) After 20 minutes: Operator isolates the normal makeup flow and the RCP seal injection flow.
ENCLOSURE
- 2. Reactor Buildina Emeroency Coolina System i
Prior to Revision 23, FSAR Table 6-9, described Single Failure Analysis -
j Reactor Building Emergency Cooling System. Item 5 evaluated the diesel power to emergency air handling units during the event " diesel fails to start." It stated:
4 I "Each of the two air handling units have fixed connections to a diesel
! generator. The third air handling unit may be switched to either diesel generator. This arrangement assures power to two air handling units if one diesel generator is inoperative." Technical Specifcation (TS) bases B 3.6.6 also states that: l 1 "[D]uring a DBA, a minimum of one containment cooling train and one RB spray train are required to maintain the containment peak pressure and l temperature below the design limits. Additionally, one RB spray train ;
]. is required to remove iodine from the containment atmosphere and l l maintain concentrations below those assumed in the safety analysis. To l ensure that these requirements are met, two RB spray trains and two i containment cooling units must be OPERABLE."
i FSAR revision 23 states that only one air handling unit would be available. I
- This is necessary to prevent overloading of the diesel.