ML20132F432
| ML20132F432 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/20/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-33541-EEVB, NUDOCS 8510010323 | |
| Download: ML20132F432 (2) | |
Text
SA:EG_AUS 3 20NAT 3 THIS COCUMENT COP
'S SAFEGUARD INFORMAL y
IN ACCORDANCE VT t.
TR 73.21.
Arizona Nuclear Power Project P.O. box 52034 e PHOENIX, ARIZONA 85072-2034 Director of Nuclear Reactor Regulation September 20, 1985 Attention:
Mr. George W. Knighton, Chief ANPP-33541-EEVB/GEC' Licensing Branch No. 3 Division of Licensing U. S. Nuclear l'egulatory Commission Washington, D. C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Security Plan Revision 8 Docket hos. STN-50-528(License ko, NPF-41)/529/530 File: 85-056-026; G.l.01.10; 85-006-493
Dear Mr. Knighton:
Attached please find Control Copy Number 8-11 of Amendment 8 to the PVNGS Security Plan. These copies contain replacement pages for copies of the Security Plan currently held by the NRC.
In addition, we are herewith forwarding two copies to the NRC Document Control Desk and one copy each to Charles Gaskin and Dennis Schaefer of the NRC.
This document contains Safeguards Information which must be protected against unauthorized disclosure in accordance with the provisions of 10 CFR 73.21 and is therefore to be withheld from public disclosure in accordance with 10 CFR 2.790(d).
Please ensure appropriate steps are taken to safeguard its contents.
This plan change is submitted in preparation for issuance of the PVNGS Unit 2 operating license and incorporates Unit 2 into the security program as well as providing details of the Unit 2 security system.
The PVNGS Security Training and Qualification Plan (current through Revision 4) which is approved for Unit 1 is also applicable to Unit 2 and Unit 3.
Very truly yours, b
(
Cm B510010323 850920
)
PDR ADOCK 05000 8
E. E. Van Brunt, Jr.
P F
Executive Vice President Project Director EEVB/GEC/s1h Attachment
^
cc:
E. A. Licitra (Control No. 8-12)
C. E. Gaskin (Control No. 8-13) y' '
' " ^ " " ' " "
D. W. Scaefer (Control No. 8-3)
Document Control Desk (Control No. 8-4 and 8-9)
A. C. Gehr SA~~GJAUS FORMA 10h g
/
THIS DOCUMENT CONTAINS SAFEGUA'iD INFORMATIOt.
f IN ACCORDANCE WITH 10 CFR 73.21, I
SAFEGJARDS lEORMAILa THIS DCCU:'ENT CCilTA!?!S SAFEGUARD lilFORMATIOli 101 ACCORDN4CE Yi!TH 10 CFR 73.21.
STATE OF ARIZONA )
) ss.
COUNTY OF MARICOPA)
I, Donald B. Karner, represent that I am Assistant Vice President, Nuclear Production of Arizona Nuclear Power Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
_ _. 'M
- J W Donald B. Karner
,e dm/ey 1985.
Sworn to before me this j dl/ day of
.g n,r Y LLQ-
$ Nf
[ Notary Public My Commission Expires:
IJy Commiss'en Expires April 6.1937
~
J.
a m o m m !y
,j
.nggin,e m..z.,
SNp tGgJniag g-m r-
- r...
THIS DOCU:ENT CC:lT/f!'i F SU U/ ;D i: %
IN ACCOR0/.tiCZ '!/iTH 10 Cht /3 21.
L 1