ML20132F135
| ML20132F135 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/13/1996 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| EA-96-466, NUDOCS 9612240136 | |
| Download: ML20132F135 (5) | |
Text
.
~ -- -
5
- 5 *%
UNITED STATES
- ~
ft, NUCLEAR REGULATORY COMMISSION e
{,
a$
R EGloN IV j
[
611 RYAN PLAZA DRIVE, SUITE 400
$9+...+/
AR LINGToN. T E XAS 76011-8064 2
December 13,1996 t
I NOTICE OF LICENSEE MEETING j
Name of Licensee:
Southern California Edison 1
Name of Facility:
San Onofre Nuclear Generating Station, Units 2 and 3 Docket:
50-361;50-362 I
EA No.:
96-466 Date and Time January 3,1997 at 9:00 am of Meeting:
Location of Meeting:
Region IV office, Arlington, Texas 4* floor, Training Conference Room Purpose of Meeting:
Predecisional Enforcement Conference to Discuss Apparent Maintenance Rule Program Violations NRC Attendees:
S. Black, Chief, Quality Assurance and Maintenance Branch S. Collins, Deputy Regional Administrator R. Correia, Chief, Reliability and Maintenance Section M. Fields, Project Manager T. Gwynn, Director, Division of Reactor Safety D. Kirsch, Chief, Project Branch F C. Paulk, Reactor Inspector D. Powers, Chief, Maintenance Branch G. Vasquez, Enforcement Specialist J. Whittemore, Reactor Inspector Licensee Attendees:
D. Brieg, Manager, Station Technical G. Gibson, Manager, Compliance D. Nunn, Vice President, Engineering and Technical Services H. Ray, Executive Vice President, Power Generation M. Short, Manager, Technical Services K. Slagle, Manager, Nuclear Oversight Division NOTE:
(1)
This meeting is open to attendance by members of the general public.
(2)
NRC personnel, not listed above, that desire to attend this meeting should notify Dr.
Dale Powers at 817-860-8195by COB on December 27,1996.
Approve Thomas P. Gwyn, Direc/or i
Division of Reacto ty DISTRIBUTION:
See next page 9612240136 961213 PDR ADOCK 05000361 G
,.. ~
. - -... ~...
f i
Southern California Edison Meeting 1/3/97 l
l l
cc:
Harold B. Ray, Executive Vice President
{
Southern California Edison Co.
i San Onofre Nuclear Generating Station i
P.O. Box 128 i
San Clemente, California 92674-0128 Chairman, Board of Supervisors County of San Diego i
1600 Pacific Highway, Room 335
. San Diego, California 92101 Alan R. Watts, Esq.
Rourke & Woodruff 701 S. Parker St. No. 7000 Orange, California 92668-4702 Sherwin Harris, Resource Project Manager Public Utilities Department City of Riverside 3900 Main Street Riverside, California 92522 R. W. Krieger, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Cit,mente, California 92674-0128 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management I
California Department of Health Services P.O. Box 942732 Sacramento, California 94234-7320 Terry Winter, Managw Power Operations San Diego Gas & Electric Comp: ny P.O. Box 1831
(
San Diego, California 92112 l
l l
l
(
~
i O
Southern California Edison Meeting 1/3/97 Mr. Steve Hsu Radiological Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672 Mr. Truman Burns \\Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 i
San Francisco, California 94102 1
l i
i l
l i
l L
i y
r Southern California 'idison 4
Meeting 1/3/97 E-Mail To:
FOR
]
(SCB,SJC1,RPC,TPG,DFK,CJP,DAP,GMV, JEW)NRC Attendees PMNS Mtg Announcement Coordinator SAM J. L. Milhoan, DEDR 1
PAB H. L. Thompson, DEDS FMJ F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR i
RPZ R. P. Zimmerman, ADP/NRR MBF1 Project Manager, NRR i
OEMAIL J. Lieberman, D/OE l
LJC L. J. Chandler, OGC JAS7 SONGS Resident inspector
^
CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO j
MFH2 M. Hammond, PAO 1
JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division
)
LMB,CLG DRS Division
)
CLS1, NLH, WSW DNMS Division I
LSO Linda Ousley cc:
(DMB (IE 45);
OEDO RIV Coordinator (17G21)
Receptionist ORA File RIV File DOCUMENT NAME:
9' To receive copy of document. Indicate in box: "C" = opy without enclosures "E" = Copy with enclosures "N" = No copy RIV:RI:MB C:MB RSLO l/
PAO
$4 D:DRPR D:DRP f/.
o CJPaulk/Im$ DAPowerWCAHackney BHenderson JEDye'r M TPGwynn[/ [
12/pf96 124996 12/p/J06 12/ly96 12/G96 '
12/fj96 OFFICIAL RECORD COPY 240023
l i
i E
Southern California Edison 4
Meeting 1/3/97 E-Mail To:
FOR (SCB,SJC1,RPC,TPG,DFK,CJP,DAP,GMV, JEW)NRC Attendees PMNS Mtg Announcement Coordinator SAM J. L. Milhoan, DEDR PAB H. L. Thompson, DEDS FMJ F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR MBF1 Project Manager, NRR j
OEMAIL J. Lieberman, D/OE LJC L. J. Chandler, OGC JAS7 SONGS Resident inspector CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB, CLG DRS Division
' CLS1, NLH, WSW DNMS Division LSO Linda Ousley j
cc:
DMB (IE 45)
OEDO RIV Coordinator (17G21) j Receptionist ORA File RIV File T C DOCUMENT NAME:
}
To receive copy of document. Indicate in box: "C" = opy without enclosures "E" = Copy with enclosures "N" = No copy RIV:RI:MB C:MB RSLO
/
PAO d4 D:DRPp D:DRP A/
o CJPaNk/Img DAPowerWCAHackney BHenderson JEDye'r k TPGwynn[/ f 12/p(96 126/96 12/pl86 12/1996 12/ijy96 '
12//j96 OFFICIAL RECORD COPY
<