Summarizes 850702 Telcon W/K Kodali Re NRC 850701 Verbal Request for Addl Info Concerning 850523 Amended SNM License Application.Summary Includes Description of Training for Persons Involved in Fuel Handling Process
ML20132E746
Person / Time
Site: Hope Creek, 07003011  PSEG icon.png
Issue date: 07/10/1985
From: Mittl R
Public Service Enterprise Group
To: Butler W
Office of Nuclear Reactor Regulation
References
25534, NUDOCS 8507180072
Download: ML20132E746 (3)


Text

.

O PSEGEx 80 Park Plau Newark, NJ 07101/ 201430 H217 MAILING ADDRESS / P.O Box b/0, Newark, NJ 07101 Rotert L Mitti General Manarr Nuctoar Anurant n untf Requlation July 10, 1985 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenuo Bothosda, MD 20814 Attention:

Mr. Walter Butler, Chief Licensing Branch 2 Division of Licensing Gentlemen:

ilOPE CREEK GENERATING STATION DOCKET NO. 50-354 DOCUMENTATION OF TELECON CONCERNING !! OPE CREEK SPECIAL NUCLEAR MATERIAL LICENSE APPLICATION The purpose of this correspondence is to document the results of the tolocon hold betwoon Kishoro Kodali (NMSS) and representativos of Public Servico Electric and Gas Company (PSE&G) on July 2, 1985.

Tho subject tolocon focused on providing responson to your verbal request for additional information as convoyed to Mossrs.

B.

A.

Preston and I. M. Mormolstein (PSE&G) on July 1, 1985, portaining to the amor ded flopo Crook Special Nuclear Materials License Application submitted for NRC review (letter from R.

L.

Mitti, PSE&G, to W.

Butler, NRC, dated May 23, 1985).

The following providos a summary od our tolocon presented in question /rosponso format:

Ouontion 1:

Describo the training individuals involved in the fuel handling process will havo.

Idontify the individuals responsible for ensuring training is proporly implomonted.

Rosponso 1:

Gonoral Electric will provido fuel inspec-tion qualification training on-sito prior to fuel recolpt using dummy fuel annom-blios.

The PSE&G Nuclear Training Depart-mont will provido training for l

qualification of maintenanco personnol on the Polar Crano and for qualification of 3

oporations personnel on the rofueling

&cp bridge.

Additional fuel handling training u

i The Energy Peo 0507100072 050710 PDR ADOCK 00000354 A

PDH

% nu nisi m

Director of Nuclear Roactor Regulation 2

7/10/85 will be conducted by the Training Depart-mont prior to fuel receipt involving prac-tico using a shipping container and dummy fuel assemblies.

The Manager - Nuclear Training, H.

D.

Hanson, is responsible for ensuring that this training is proporly implomonted.

Quostion 2:

How do you ensure that administrativo pro-cedures for fuel handling are proporly instituted and maintained?

Rosponso 2:

Those station administrativo proceduros i

and departmental implomonting procedures which control and guido the conduct of new fuel rocoipt, inspection and storage will bo prepared, reviewed and approved in accordance with prosently approved admin-istrativo controls.

Those administrativo controls requiro review by the responsible department engi-noor and the Station Operations Review Committoo.

Station administrative proco-duros are approved by the Gonoral Manager -

Hopo Crook Operations; departmental pro-ceduros are approved by the responsible department manager.

All proceduro revisions are reviewed and approved at the samo level as the original proceduro.

Ouontion 3:

Stato the maximum number of loaded ship-ping containers to be located at the Hope Crook sito at any one time.

Rosponso 3:

It is planned that fuel will be unloaded from the shipping containers prior to the i

arrival of the next shipment.

However, loaded shipping containers may be tempora-rily stored on the refueling floor or in the reactor building railroad access area on the 102' olovation.

A maximum of 30 loaded metal shipping containors can bo 4

stored on the refueling floor.

Up to throo shipments of fuel can be stored in the railroad access area which amounts to

e Director of Nuclear Reactor Regulation 3

7/10/85 an additional 45 loaded shipping con-tainers.

Gonoral Electric will be con-tacted to halt further shipments and provent this storage capacity from being excooded.

Question 4:

Identify the individual rosponsible for ensuring Radiation Protection Training is proporly implemonted.

Response 4:

Donnis Hanson - Manager - Nuclear Training is the PSE&G representative responsible for ensuring Radiation Protection Training is proporly implomonted.

J.

R.

Lovell, Radiation Protection Manager, shall notify the Manager - Nuclear Training of those individuals requiring radiation protection training.

Should you have any additional questions or concerns, do not hositato to contact us.

Very truly yours, s / lt 1/

s C

K. Kodali USNRC Division of Fuel Cyclo and Material Safety D. H. Wagner USNRC Licensing Project Manager A.

R.

Blough USNRC Senior Resident Inspector