ML20132E571

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/85-25 & 50-425/85-24 on 850617-21.No Violation or Deviation Noted
ML20132E571
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/01/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20132E575 List:
References
NUDOCS 8508020028
Download: ML20132E571 (3)


See also: IR 05000424/1985025

Text

. _ _ _ _

_ _

_ _ _ _

_ _ _ _ _

.__

_ _ _

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _

_ _

_-

_

y

'

k.

~

ye, o /

s

-

...

M o1 W

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT N05. 50-424/85-25 AND 50-425/85-24

On June 17-21, 1985, NRC inspected activities authorized by NRC Construction

Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility.

At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations of activities

in progress.

The inspector also conducted independent measurements, utilizing

i

Region II ultrasonic equipment at your site, to verify your capability for

performing ultrasonic examinations and analyzing examination results.

Within the scope of the inspection, no violations or deviations were identified.

~'j

Should you have any questions concerning this letter, please contact us.

Sincerely,

,

I. (.h cW1tR h

-

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor' Projects

Enclosure:

Inspection Report Nos. 50-424/85-25

and 50-425/85-24

eyw/ encl:

W . E. Conway, Senior Vice President

, Auclear Power

,W. O. Foster, Vice President

W,,fd General Manager Vogtle Project

. H. Gregory, 111, General

nager Vogtle Nuclear Construction

.

. Bockhold, Jr., Vogtle

Plant Manager

(cc w/ encl cont'd

see page 2)

kn4

0

POR

$ 0l

l

E'

-

.,

O,

,

.

2

w/ enc 1: cont'd)

T. Gucwa, Chief

Nuclear Engineer

uble A. Thomas,

Vice President-Licensing Vogtle

,y Project

VEd Groover, Quality

ssurance Site Manager

W. Hayes, QA Manager

. T. Beckham, Vice President

General Manager - Operations

. A. Bailey, Project Licensing

anager

- orge F. Trowbridge, Esq.

JHaw,Pittman,PottsandTrowbridge

tke_ruce W. Churchill, Esq.

haw, Pittman, Potts and Trowbridge

rnest L. Blake, Jr. , Esq.

j/Shaw,Pittman,PottsandTrowbridge

VJames E. Joiner, Troutman, Sanders,

ockerman and Ashmore

a s G. Ledbetter, Commissioner

epartment of Human Resources

y arles H. Badger, Office of

Planning and Budget. Management

eview Division

eppish Kirkland, III, Counsel

Office of the Consumer's Utility

founcil

g',trouglas C. Teper, Georgians Against

/ Nuclear Energy

K aurie Fowler, Legal Environmental

/ as'sistance Foundation

t4fm Johnson, Executive Director

Educational Campaign for a Prosperous

,feorgia

til6rtonB.Margulies,Esq., Chairman

Administrative Judge Atomic Safety

,a

Licensing Board Panel

.

. Oscar H. Paris, Administrative Judge

omic Safety and Licensing Board Panel

stave A. Linenberger, Jr., Administrative

Judge Atomic Safety and Licensing Board

Panel

(becw/ enc 1:

seepage 3)

r"

\\

r

.

..

p

.

-

,

,

3

bec w/ enc 1:

E. Reis ELD

M. Sinlule, RII

vflRCResidentInspector

Document Control Desk

State of Georgia

fff,

R$

^

'

\\

- he

Jw

JJB ke

ARHerdt

R

g /2(ysome:

6/

85

6/%/85

6

/85

3