ML20132E571
| ML20132E571 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/01/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20132E575 | List: |
| References | |
| NUDOCS 8508020028 | |
| Download: ML20132E571 (3) | |
See also: IR 05000424/1985025
Text
. _ _ _ _
_ _
_ _ _ _
_ _ _ _ _
.__
_ _ _
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _
_ _
_-
_
y
'
k.
~
ye, o /
s
-
...
M o1 W
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT N05. 50-424/85-25 AND 50-425/85-24
On June 17-21, 1985, NRC inspected activities authorized by NRC Construction
Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility.
At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations of activities
in progress.
The inspector also conducted independent measurements, utilizing
i
Region II ultrasonic equipment at your site, to verify your capability for
performing ultrasonic examinations and analyzing examination results.
Within the scope of the inspection, no violations or deviations were identified.
~'j
Should you have any questions concerning this letter, please contact us.
Sincerely,
,
I. (.h cW1tR h
-
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor' Projects
Enclosure:
Inspection Report Nos. 50-424/85-25
and 50-425/85-24
eyw/ encl:
W . E. Conway, Senior Vice President
, Auclear Power
,W. O. Foster, Vice President
W,,fd General Manager Vogtle Project
. H. Gregory, 111, General
nager Vogtle Nuclear Construction
.
. Bockhold, Jr., Vogtle
Plant Manager
(cc w/ encl cont'd
see page 2)
kn4
0
POR
$ 0l
l
E'
- -
.,
O,
,
.
2
w/ enc 1: cont'd)
T. Gucwa, Chief
Nuclear Engineer
uble A. Thomas,
Vice President-Licensing Vogtle
,y Project
VEd Groover, Quality
ssurance Site Manager
W. Hayes, QA Manager
. T. Beckham, Vice President
General Manager - Operations
. A. Bailey, Project Licensing
anager
- orge F. Trowbridge, Esq.
JHaw,Pittman,PottsandTrowbridge
tke_ruce W. Churchill, Esq.
haw, Pittman, Potts and Trowbridge
rnest L. Blake, Jr. , Esq.
j/Shaw,Pittman,PottsandTrowbridge
VJames E. Joiner, Troutman, Sanders,
ockerman and Ashmore
a s G. Ledbetter, Commissioner
epartment of Human Resources
y arles H. Badger, Office of
Planning and Budget. Management
eview Division
eppish Kirkland, III, Counsel
Office of the Consumer's Utility
founcil
g',trouglas C. Teper, Georgians Against
/ Nuclear Energy
K aurie Fowler, Legal Environmental
/ as'sistance Foundation
t4fm Johnson, Executive Director
Educational Campaign for a Prosperous
,feorgia
til6rtonB.Margulies,Esq., Chairman
Administrative Judge Atomic Safety
,a
Licensing Board Panel
.
. Oscar H. Paris, Administrative Judge
omic Safety and Licensing Board Panel
stave A. Linenberger, Jr., Administrative
Judge Atomic Safety and Licensing Board
Panel
(becw/ enc 1:
seepage 3)
r"
\\
r
.
..
p
.
-
,
,
3
bec w/ enc 1:
E. Reis ELD
M. Sinlule, RII
vflRCResidentInspector
Document Control Desk
State of Georgia
fff,
R$
^
'
\\
- he
Jw
JJB ke
ARHerdt
R
g /2(ysome:
6/
85
6/%/85
6
/85
3