ML20132D476

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to Design Rept for Recirculation Sys Weld Overlay Repairs & Flaw Analysis at Brunswick Steam Electric Plant Unit 1 Re IGSCC Insp & Repair Work Conducted During Current Refueling Outage
Date released: 05/25/2020 Download: ML20132D476


Rev 2 to Design Rept for Recirculation Sys Weld Overlay Repairs & Flaw Analysis at Brunswick Steam Electric Plant Unit 1.
ML20132D484
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/30/1985
From: Gustin H, Kleinsmith M, Wenner T
NUTECH ENGINEERS, INC.
To:
References
Download: ML20132D484 (34)
Forwards Rev 2 to Design Rept for Recirculation Sys Weld Overlay Repairs & Flaw Analysis at Brunswick Steam Electric Plant Unit 1 Re IGSCC Insp & Repair Work Conducted During Current Refueling Outage
ML20132D475
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/25/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: VASSALLO D B
Office of Nuclear Reactor Regulation
References
Download: ML20132D475 (1)