Text
g
.
.
Docket No. 50-344
-
Portland General Electric Company
121 S. W. Salmon Street.
Portland, Oregon 97204
Attention:
Mr. Bart D. Withers
Vice President Nuclear
Gentlemen:
Subject: NRC Inspection of Trojan Nuclear Plant
This refers to the inspection conducted by Mr. M. L. Padovan of this office
during June 3 - 7,1985- of' activities authorized by NRC License No. NPF-1, ' and
to the discussion of our findings held by Mr. Padovan with Mr. Schmitt and
. other members of your staff periodically during the inspection.
. Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
_
examinations of procedures and representative records, interveiws with
personnel, and observations by the inspector.
No violations of NRC requirements were identified within the scope of this
inspection.
In accordance with 10 CFR 2.79'0(a), 'a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
~ &!(not d]neil liv
D.' F. }0rzh
D. F. Kirsch, Acting Director
Division of Reactor . Safety & Projects
Inspection' Report No. 50-344/85-17
cc w/ enclosure:
State of Oregon (Dixon)
W. S. Orser, PGE
J. W. Durham, Esq.
bec w/ enclosure: RSB/ Document Control Desk (RIDS); Mr. Martin; Resident'-
Inspector
bec w/o enclosure: LFMB; Gre'g Cook
C
P
.D0DD
get
KIRSCH
6/ 3/5
- ).5/85lhfjf}/85
8500010025 850705
f[}
.. gaa ancn **g*
.
p/
,y