From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
(RDC-139(85)), PY-CEI-OIE-0800, PY-CEI-OIE-800, RDC-139(85), NUDOCS 8507310271
Download: ML20132D283 (2)


Text

,

D gP THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P.O. BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLD3. - 55 PUBL!C SQUARE f

Serving The Best Location in the Nation MURRAY R. EDELMAN N$ CLEAR July 11, 1985 PY-CEI/OIE 0080 L Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket No. 50-440; 50-441 Seismic Support Spacing Criteria for Tubing Installed by Johnson Control Co.

[RDC 139 (85)]

Dear Mr. Keppler:

This letter is an interim report pursuant to 10CFR50.55(e) concerning violations of seismic support spacing criteria for tubing supports in balance of plant areas. On June 11, 1985, Mr.

E. Riley of the Cleveland Electric Illuminating Company tele-phoned Mr. F. Jablonski to report this deficiency which is being evaluated under Deviation Analysis Report 243.

Description of Deficiency During the review of the as-built configuration of tubing in the balance of plant areas, violations of the seismic support spacing criteria were identified. The violations resulted from improper applications of the criteria specified in Gilbert Commonwealth, Inc. Specification 90, and Report 1937 which governed the design implementation and installation of the tubing.

Analysis of Safety Implications The functional integrity of the instrumentation / control cystems cannot be assured without adherence to the seismic support spacing criteria.

1 8507310271 850711 h

{DR ADOCK05000g0 f g g IdDL 151985

e

. Mr. Jcmso G. Krppler July 11, 1985

~

- PY-CEI/OIE 0000 L Corrective Action Engineering Change Notices have been issued to revise and clarify the criteria in Specification 90, and Report 1937 which governed the installation of the balance of plant tubing.

A review is being conducted of all piping, tubing and racks installed by the contractor who was responsible for the instal-lation of the balance of plant tubing. This review utilizes a checklist to ensure that problems with the implementation of the criteria are identified and evaluated. Nonconformance Reports (NRs) are being issued to document each violation of the criteria and these NRs are being evaluated and dispositioned by Engineering.

Another report, either interim or final, will be provided when additional information is available. If you have any questions, please call.

Sincerely, 14 W C Murray R. Edelman Vice President Nuclear Group MRE:sab cc: Mr. J. A. Grobe USNRC, Site Office Mr. D. E. Keating USNRC, Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Control Branch Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339