ML20132D018

From kanterella
Jump to navigation Jump to search
Safeguards Amend SG-1 to License SNM-639 for Union Carbide Subsidiary B,Inc,Incorporating 821101 Rev to Fundamental Nuclear Matl Control plan,840501 Page Changes & Apps A-F Marked Demonstration
ML20132D018
Person / Time
Site: 07000687
Issue date: 04/12/1985
From: Brown W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML20132D017 List:
References
NUDOCS 8507310140
Download: ML20132D018 (3)


Text

_ _ _ _ _ _ _ _ - _ _ _ _ _ . _. - - _ _

n' UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE AMENDMENT FOR SPECIAL NUCLEAR MATERIAL SAFEGUARDS Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorgani-zation Act of 1974,-and Title 10, Code of Federal Regulations, Chapter 1, Part 70,'the following amendment to the special nuclear material license.

identified below is hereby issued, incorporating specific safeguards require-ments for special nuclear material.

Licensee:

Name: Union Carbide Subsidiary B., Inc. License No.: SNM-639

(Company B)'

Safeguards Amendment: SG-1 Address: Sterling Forest Research Center P. O. Box 324 Docket No.:

70-687 Tuxedo, New York 10987 Date Issued: 779 7, g g CONDITIONS

1. 0 - FACILITY ORGANIZATION Currently no license conditions under this section. The appropriate requirements have been incorporated into the approved plan.

2.0 FACILITY OPERATION 2.1 The licensee shall follow the Fundamental Nuclear Material Control Plan dated November 1, 1982; the page changes made thereto dated May 1, 1984; and as revised in accordance with the provisions of 10.CFR 70.32(c). Appendices A through F marked "DEMONST. RATION" are included for cescriptive and clarification purposes and are not part of the FNMC Plan, f

2.2 Operations involving special nuclear materials which are not described in the Plan identified in Ccndition 2.1 shall not be initiated until an appropriate safeguards plan has been approved by the Nuclear Pegulatory Commission.

3.0 MEASUREMENTS 3.1 Measurements are not required on sealed PuBe sources, and those samples intended for analysis and testing which have been determined by other means to contain less than tan grams U-235 each.

8507310140 850412 PDR ' ADOCK 07000607 C PDit

5 Amendment No. SG-1 Docket No.70-687 -

License No. SNM-639 3.2 Enrichment factors determined from plating solution materials ca.n be applied to U-235 values for sealed targets for purposes of obtaining uranium values.

4.0 MEASUREMENT CONTROL 4.1 Notwithstanding the requirements in 10 CFR 70.57(b)(4) to provide sampling systematic errors and to conduct engineering tests on all material types, the licensee shall follow the Plan identified in License Condition 2.1. .

4.2 Notwithstanding the requirements of 10 CFR 70.51(e)(4)(i) to calculate the associated limit of error of material unaccounted for (i.e., LEID), the LEID value need not be calculated if the Plant inventory difference (ID) is less than 300 grams of uraniun or U-235.

4.3 Notwithstanding the requirement in 10 CFR 70'.57(b)(8)(ii) to have a replicate program for the determination of random errors, this replicate program is not required provided the Plant ID is less than 300 grams of uranium or U-235.

1 5.0 INVENTORY 5.1 Notwithstanding the requirements of 10 CFR 70.51(d) and 70.51(e)(2),

the licensee is not required to inventory the SNM described in Section 5.0 of the Plan identified in License Condition 2.1.

6.0 -

R$ CORDS AND REPORTS Currently no license conditions under this section. The appropriate requirements have been iccorporated into the approved plan.

7.0 INTERNAL CONTROL 7.1 Accurate records shall be established and maintained which provide on a daily basis knowledge of the identity, location, and quantity of hil SNM within the plant in discrete items and containers.

8.0 MANAGEMENT Currently no license conditions under this section. The appropriate requirements have been incorporated into an approved plan.

9 Amendment No. SG-1 Docket No.70-687 License No. SNM-639 9.0 PHYSICAL PROTECTION REQUIREMENTS FOR SPECIAL NUCLEAR MATERIAL OF MODERATE STRATEGIC SIGNIFICANCE 9.1 The licensee shall maintain and fully implement all provisions of the Commission approved security plan titled, " Physical Secur.ity Plan for the Union Carbide Corporation Facility at Tuxedo, New York, Revisions 3 and 4," dated April 30, 1983, and May 19, 1983, respectively; and as revised in accordance with the provisions of 10 CFR 70.32(e).

For the Nuclear Regulatory Commission V?M h be-Willard B.' Brown, Chief Fuei Facility Safeguards Licensing Branch Division of Safeguards, NMSS D. ate of Amendment Y