|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20235U0881987-09-17017 September 1987 Informs That Deviant Matl May Be Used for Castor V/21 Baskets W/O Compromising Cask Safety.Boron Content of Deviant Matl Does Not Adversely Affect Structural Integrity or Criticality Margins of Cask ML20238A4451987-08-0303 August 1987 Notifies of Initiation of Matl Deviation for Two Butting Fuel Baskets Resulting from Review of Cask Fabrication Documentation.Baskets Put on Hold,Segregated & Tagged. Deviation Rept Will Be Forwarded for NRC Review ML20211E2681987-02-0505 February 1987 Forwards Nonproprietary Castor V/21 Borated Stainless Steel Basket Evaluation, Incorporating Changes to Previous Submittal Based on Meeting W/Nrc & Lll in Oct 1986 ML20141E7821986-03-25025 March 1986 Forwards Proprietary Drawings A500.11-15 & B525.106-544 to Facilitate NRC Review of Mechanical Design of Castor V/21 Fuel Basket.Rt Anderson Affidavit Requesting Withholding Encl.Drawings Withheld (Ref 10CFR2.790) ML20199E1791986-02-28028 February 1986 Requests Amend to Tsar to Include All Stainless Steel Basket Designs.Design Maintains Criticality Via Safety Analysis & Dimensional Check ML20154M1181986-02-0505 February 1986 Forwards Gusset Plate Temp Profiles Generated for Input to Tsar Thermal Stress Analysis ML20198H0761986-01-0202 January 1986 Responds to Item 7.3.2 Re Corrections to Shielding of Castor V/21 Tsar,Per L Rouse .Mod to Gamma Shielding Proposed,Based on Dose Rate Measurements Obtained During Demonstration Test at Inel.Figures Encl ML20134D1411985-08-14014 August 1985 Informs That 831109 Partial Application for Castor Vb Cask & 850304 Application for QA Program Approval Have Been Withdrawn.Requests That QA Program Be in Place Prior to Preapplication Meeting to Discuss Drop Test Plan for Castor ML20132C0121985-08-0808 August 1985 Withdraws Application for QA Plan Approval.Rev Underway,Per ,To Incorporate 10CFR71.101 Requirements ML20132F5391985-07-0909 July 1985 Advises That Unless Response to NRC 850508 Request for Addl Info Received within 30 days,850304 Application for QA Program Approval for Radioactive Matl package:0510 Will Be Denied ML20132C0251985-07-0909 July 1985 Advises That 850304 Application for QA Program Approval Will Be Denied Unless 10CFR71.101 Info Provided within 30 Days ML20129B5431985-06-19019 June 1985 Forwards Rev 0 to Design Analysis for Castor V/21 End Drop Impact Limiter. Cask Body Stresses Previously Determined Remain Valid & Bounding for Encl Design ML20132C0281985-03-0404 March 1985 Forwards QA Plan for Dry Spent Fuel Storage & Transport Cask,For Review & Approval 1987-09-17
[Table view] Category:NRC TO VENDOR/MANUFACTURER
MONTHYEARML20132C0251985-07-0909 July 1985 Advises That 850304 Application for QA Program Approval Will Be Denied Unless 10CFR71.101 Info Provided within 30 Days 1985-07-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20134D1411985-08-14014 August 1985 Informs That 831109 Partial Application for Castor Vb Cask & 850304 Application for QA Program Approval Have Been Withdrawn.Requests That QA Program Be in Place Prior to Preapplication Meeting to Discuss Drop Test Plan for Castor ML20132F5391985-07-0909 July 1985 Advises That Unless Response to NRC 850508 Request for Addl Info Received within 30 days,850304 Application for QA Program Approval for Radioactive Matl package:0510 Will Be Denied ML20132C0251985-07-0909 July 1985 Advises That 850304 Application for QA Program Approval Will Be Denied Unless 10CFR71.101 Info Provided within 30 Days 1985-08-14
[Table view] |
Text
/ i
/
c# % UNITED STATES i
.. t NUCLEAR REGULATORY COMMISSION j WASHINGTON, D. C. 20555
- "* . , -5 FCTC: RHO i. ' '
71-0510 gggg General Nuclear Systems, Inc.
ATTN: Mr. Victor J. Barnhart Program Manager 135 Darling Drive Avon, CT 06001 Gentlemen:
This refers to your application dated March 4,1985, for a Quality Assurance (QA) Program Approval for General Nuclear Systems, Inc. (GNSI).
By letter dated May 8,1985, an application which addresses all the requirements of 10 CFR 571.101 was requested. To date we have not received the additional infonnation. Unless this information is provided within 30 days, we plan to issue a denial of your March 4,1985, application.
Sincerely, Charles E. MacDonald, Chief Transportation Certification Branch Division of Fuel Cycle and Material Safety, NMSS cc: GNS, Inc.
I ATTN: Mr. Jack D. Rollins 340 Six Branches Court Roswell, GA 30076 i
l l
l 8509260383 850808 PDR ADOCK 07100510 C PDR