Forwards Application for Amend to License NPF-3 to Revise TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle
ML20132B680
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/11/1996
From: Jeffery Wood
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132B685 List:
References
2405, NUDOCS 9612170351
Download: ML20132B680 (2)


Text

. - - . . . . . . . . . .

l CENTERIOR ENERGY i

550t N. State Route 2 419-249-2300 John K. Wood Oak Harbor.OH 43449 FAX: 419 3218337 Vce Presdert Nuclear Davis-Besse l

l Docket Number 50-346 l

License Number NPF-3 l

Serial Number 2405 I

December 11, 1996 I United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 ,

I

Subject:

License Amendment Application to Revise Technical Specification Definitions, Instrumentation Technical Specifications, and j Emergency Core Cooling System Technical Specifications for -l Conversion to a 24 Month Fuel Cycle Ladies and Gentlemen:

i Enclosed is an application for an amendment to the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1 Operating License Number NPF-3, j Appendix A, Technical Specifications. The proposed changes involve

-Technical Specification-(TS) Section 1.0, Definitions, Table 1.2, Frequency Notation; TS 3/4.3.1.1, Reactor Protection System l Instrumentation; TS 3/4.3.2.1, Safety Features Actuation System l Instrumentation; TS 3/4.3.2.2, Steam and Feedwater Rupture Control System Instrumentation; TS 3/4.3.3.1, Radiation Monitoring Instrumentation; TS 3/4.3.3.5.2, Remote Shutdown Instrumentation; TS 3/4.3.3.6, Post-Accident Monitoring Instrumentation; TS 3/4.5.1, Emergency Core Cooling Systems (ECCS), Core Flooding Tanks; and TS 3/4.5.2, Emergency Core Cooling Systems, ECCS Subsystems - T > 280*F.

4 The proposed changes would revise TS Definition Table 1.2, Frequency Notation. The frequency notations defined by Table 1.2 are utilized in j various tables in the Instrumentation Technical Specifications. Notation \

"R", which is presently defined as a frequency of "At least once per 18

. months," is proposed to be redefined as a frequency of "At least once per 24 months" for instrumentation surveillance frequencies being changed to ( -fy [y a 24 month frequency. A new Notation "E" is proposed to be used to '

i designate the existing frequency of "At least once per 18 months" for instrumentation surveillance frequencies remaining on an 18 month frequency.

9612170351 961211 PDR ADOCK 05000346 p PM

Dockst Number 50-346 Licensa Numbsr NPF-3 Ssrial Number 2405 Page 2 The proposed changes would also modify presently specified 18 month rurveillance frequencies in certain TS Surveillance Requirements contained in the above-mentioned TS Sections to new specified frequencies of once each Refueling Interval, or once each 24 months. These changes are in accordance with the NRC guidance provided by Generic Letter 91-04,

" Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle," and will support conversion of the DBNPS from an 18 month to a 24 month fuel cycle.

Certain TS Surveillance Requirements that are intended to remain on an 18 month frequency, but which presently utilize Notation "R", are proposed to be administrative 1y changed to utilize the new Notation "E" described above.

The LSNPS is commencing longer fuel cycles during the current Cycle 11.

This license amendment application is one of several applications which will be submitted in support of the 24 month fuel cycle conversion.

These applications are being submitted to the NRC as a Cost Beneficial Licensing Action. As will be demonstrated in each license amendment application, the proposed changes will not adversely impact safety. The proposed changes will provide an estimated cost savings of $24 million over the DBNPS's remaining life.

l This amendment application includes a proposed change to Surveillance Requirement (SR) 4.5.2.d. Several additional license amendment applications scheduled to be submitted to the NRC, License Amendment Requests (LAR) 95-0019, 95-0022, and 95-0024, also affect SR 4.5.1.d. In addition, the change to TS Definition Table 1.2 redefining Notation "R" affects various other Instrumentation TS Surveillance Requirements that are not addressed by this amendment application, but that will be addressed subsequently by LAR 95-0024. Therefore, Toledo Edison requests that amendments for LAR 95-0019, 95-0022, 95-0024, and this amendment application, LAR 95-0027, be issued together by the NRC by December 5, 1997.

Should you have any questions or require additional information, please contact James L. Freels, Manager - Regulatory Affairs, at (419) 321-8466.

I Ver truly yours, i

M /laj Enclosure cc: A. B. Beach, Regional Administrator, NRC Region III A. G. Hansen, NRC/NRR Project Manager S. Stasek, NRC Region III, DB-1 Senior Resident Inspector J. R. Williams, Chief of Staff, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)

Utility Radiological Safety Board