ML20132B444

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/85-36 & 50-364/85-36 on 850811-0910.No Violations or Deviations Noted
ML20132B444
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/20/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20132B450 List:
References
NUDOCS 8509260193
Download: ML20132B444 (2)


See also: IR 05000348/1985036

Text

,

,.. . '

SEP 2 01985

.

. .

) n"abama Power Company

ATTN: - Mr. R. P. Mcdonald

Senior Vice President-Nuclear Generation

P. O. Box 2641-

Birmingham, AL 35291

4

Gentlemen:

SUBJECT: REPORT NOS. 50-348/85-36 AND 50-364/85-36

>

On August 11 - September 10, 1985, NRC inspected activities authorized by NRC

License Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

,( f. fkSn W

j' David M. Verrelli, Chief

v Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-348/85-36

and 50-364/85-36

c w/ encl:

0. Whitt, Executive Vice President

. D. Woodard, Plant Manager

J. G. Hairston, III, Manager, Nuclear

, Engineering and Technical Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

M 0. Thrash, Manager, Nuclear Operations

fand Administration

J . G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/ encl: (See page 2)

8509260193 850920

PDR ADOCK 05000348

G PDR ,

I 36o t

.. . - - .

--," -

-SEP 20 g

.. ' Alabama Power Company 2

b c w/ encl:

i

RC Resident Inspector

. Reeves, Project Manager, NRR

' Document Control Desk

State of Alabama

l

!

,

!

.

4

i

RII RII

A on:sa

,

09/f7/85 09//]/85'

_ _ - . - . _ _- . - _ . , . . - . .