Notification of 961205 Meeting W/Mpr Associates,Inc in Alexandria,Va to Review Status of Midland Annealing Demonstration Project at Time Stop Work Order Issued by DOE for FY97 Work Under Project
ML20132B010
Person / Time
Issue date: 12/05/1996
From: Diane Jackson, Shah Malik
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Shao L
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
NUDOCS 9612160419
Download: ML20132B010 (4)


Text

_

>s

"%g e"

4 UNITED *TATES s

g NUCLEAR REGULATORY COMMISSION

't WAsHINoToN. O.C. 20555 4001 Decernber 5,1996 l

MEMORANDUM TO:

Lawrence C. Shao, Director Division of Engineering Technology Office of Nuclear Regulatory Research l

l THRU:

Michael E. Mayfield, Chief l

Electrical, Materit,:s and a csi ngi eeri ranch l

Division of Engineering Technology, RES FROM:

Deborah A. Jackson, Mechanical En jh' l

Electrical, Mechanical and Materia s ngineering Bra ch Division of Engineering Technology, RES Shah N. Malik, Senior Materials Engineer C

k (C

Electrical, Mechanical and Materiats Engineering Branch Division of Engineering Technology, RES

SUBJECT:

HIGHLIGHTS: STEERING COMMITTEE MEETING FOR THE MIDLAND ANNEALING DEMONSTRATION PROJECT Meeting Date:

November 7,1996 Location:

Offices of MPR Associates, Inc.

320 King Street Alexandria, VA 22151

Purpose:

Project Review Meeting of the Steering Committee for Midland Reactor Vessel Annealing Demonstration Project (ADP)

{

l Attendees:

See Attachment On November 7,1996, a meeting was held to review the status of the Midland ADP at the time the "stop work order" was issued by DOE for CY97 work under the project and to discuss possib!e actions for continuing the project at a later date. The NRC staff attended the meeting as observers.

Highlights of the meeting are as follows:

1.

Alex Zarechnak of MPR gave an update on the f abrication and assembly of the annealing electrical heater. The heater was completed except for the installatior of the top cover. Hot functional testing of the heater was scheduled to begin on November 18,1996. On November 22,1996, the hot functional test of the furnace was completed. The test confirmed the successful operation of the furnace. All internal instrumentation was ordered and installed. The external instrumentation l

l gf Nk pgT@ h 9612160419 961205 s

gQ PDR ORG NREB

- - - - ~ _ _ _. _..

=

=...

..,e*

Lawrence C. Shto was not ordered at the time of the stop work order. Due to the shorter lead time, I

I l

about 3 months, on the external instrumentation, it can be ordered once the project I

recommences.

Based on DOE instructions, the annealing heater assembly will presently be stored in Russia, even though a number of Steering Committee (SC) members expressed reservations on keeping it stored in Russia due to potential for vandalism and l

possible deterioration in electrical wiring and connections due to lack of controlled environment at the storage location, should the storage become long term. The DOE /MPR team will have to find a funding source for transportation (after disassembly) and storage of the heater in the U.S., if the team decides to bring the heater from Russia.

l l

2.

Bob Steele of MPR briefly discussed the issue of ownership of the annealing heater.

l The rights of the team members to ownership are a legalissue that will be discussed at a subsequent meeting.

3.

Larry Stanek of Framatome Technologies discussed the site preparation at Midland.

The objective of the latest site visit was to identify items that need to be cleaned / completed prior to starting the ADP. A letter was sent to Consumers l

Power, owner of the Midland Plant, to identify these items. The additional l

instrumentation for the ADP SC and consumable items (e.g., temperature crayons, I

paint, labels, etc.) had been ordered. The instrumentation order has not been paid, and was canceled after receiving the stop work order, but the consumable items were paid for in full and were of small cost. Consumers Power stated that the vessel will be available until March 31,1998, provided the ADP is fully funded.

4.

Project alternatives / options were discussed among the SC members. The following alternatives / options were discussed; a.

Completing the Midland ADP in FY 1997. This would require 100% industry funding for the remaining part of the unfinished project.

b.

Completing the ADP in FY 1998. The SC, including DOE, would need to initiate

pe funding and contract changes to make this option viable.

CN c.

Terminating ADP at the end of 90 days from the day stop work order was C

issued. This option is the Mast desirable due to the fact that 77% of the funds are expended.

- (g 5.

Additional funAg discussions will take place with the cost share partners and i

DOE /Sandia e

A)

O Future Meetings:

To be announced Mct i

W

Attachment:

Attendance List

! b l

Distribution:

El J. Taylor D. Morrison T. Speis F. Miraglia f

l E

B. McCabe J. Strosnider K. Wichman M. Mitchell M. Gamberoni Branch R/F PDR DOCUMENT NAME: G:WEBWIDLMEET.117 To receive e copy of tNs document. Indicate in the box: "C* = Copy without attachment / enclosure "E* = Copy with attachment / enclosure

  • N* = No cooy OFFICE EMMEB l

EMME8 l

SC\\EMMEB l

) C\\EMMESgo 1, l

l O

NAM N O. Jackson

  • S Mahk E.Hackett '
    • Mayf 4M///

O DATEG/$

12!

I96 12/

19 6 12/ _

19 8 12/ (

/96

  • See Prewous Coxurrence OFFICIAL RECORO COPY RES Fde Code: 181 OgW

,..ge Lawrence C. Shao,

l Based on DOE instructions, the annealing heater assembly will presently be stored in Russia, even though a number of Steering Committee (SC) members expressed reservations on keeping it stored in Russia due to potential for vandalism and possible deterioration in electrical wiring and connections due to lack of controlled environment at the storage location, should the storage become long term.

DOE /MPR team will have to find funding source for transportation (af ter disassembly) and storage of the heater in the U.S., if the team decides to bring the l

heater from Russia.

2.

Bob Steele of MPR briefly discussed the issue of ownership of the annealing heater.

The rights of the team members to ownership are a legal issue that will be discussed at a subsequent meeting.

3.

Larry Stanek of Framatome Technologies discussed the site preparation at Midland.

The objective of the latest site visit was to identify items that need to be cleaned / completed prior to starting the ADP. A letter was sent to Consumers Power, owner of the Midland Plant, to identify these items. The additional instrumentation for the ADP SC and consumable items (e.g., temperature crayons, j

paint, labels, etc.) had been ordered. The instrumentation order has not been paid, j

and was canceled after receiving the stop work order, but the consumable items were paid for in full and were of small cost. Consumers Power stated that the vessel will be available until March 31,1998, provided the ADP is fully funded.

4.

Project alternatives / options were discussed among the SC members. The following alternatives / options were discussed:

i i

a.

Completing the Midland ADP in FY 1997. This would require 100% industry funding for the remaining part of the unfinished project.

l b.

Completing the ADP in FY 1998. The SC, including DOE, would need to initiate funding and contract changes to make this option viable, c.

Terminating ADP at the end of 90 days from the day stop work order was issued. This option is the least desirable due to the fact that 77% of the funds are expended.

5.

Additional funding discussions will take place with the cost share partners and f

DOE /Sandia.

Future Meetings:

To be announced

Attachment:

Attendance List Distribution:

J. Taylor D. Morrison T. Speis F. Miraglia B. McCabe J. Strosnider K. Wichman M. Mitchell M. Gamberoni Branch R/F PDR DOCUMENT NAME: G WEBWIDLMEET.117 To receive e copy of this document, indicate in the box: *C* = Copy without attachment / enclosure

  • E* = Copy with attachment / enclosure
  • N* = No copy OFFICE EMME8 lF EMME8 lE SCTEMMEB

[ /V l C\\EMMEL l

l NAME/Jre-D. Jackson /MP S.Mahk fM M E.Hackett _V tf //N M Mayfielo

/

OATEf2/4 12/

d

/96 12/ O V 19 6 12/

OA~

/96 12/

/56 OFFICIAL RECORD COPY GES Fde Code: 181 l

.... = _ _ _ _. -

l

)

,e a Attachment i

Attendance List: November 7,1996, Midland Steering Committee Meeting tac D. Jackson, RES j

S. Malik, RES DDE D. Harrison

0. Agarwal J. Warren

\\

SNL J. Nakos MPR 1

N. Marrone B. Steele A. Zarechnak D. Chapin l

l Framatome Technolooies L. Stanek

)

D. Darling i

Emoire State Electric Enerav Research Co.

B. Monti J. Burger EP_B1 S. Rosinski IV.A D. Couch GPU Nuclear H. Shipman i

l l

- -