ML20132A939
| ML20132A939 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/03/1979 |
| From: | Beatty G FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-02, IEB-79-2, NUDOCS 7908300775 | |
| Download: ML20132A939 (1) | |
Text
)
^
~
1 Tolacopy
- l i
~
i 14r. J. P. O'Reilly, Dir'eeter
~~
- c. >
~_
{
Of fice of Inspection and Enforcementi 10J Marietta St., Suite 31,00 w
AtIsnta, CA-30303 255 4T.:
tocket 50-302 1.ic en n e I.?P.-7 2 n
N l
This will confir:n a repert r..ade to Mr. Denald Price of your offida at 1400, 2 July I'119, that at 1000 2 July 1979, it war determined that ninety-l tve (92) pipe supports have thus far heen identified na inadequate based I
on the guide 11ues of I & E Eullet$ns 79-02 and 79-02 revision 1.
This is f
reported under Technical Specification 6-9-1-81.
o u
The effected sutperts are being redesigned and installed under modifi-E cation 79-6-86.
Three of the ninety-two supports (SWH-522, PCH-301,.
g DF.H-645), have a safety factor less than one (1) and have been identified ar a cenetraint for startup, s
f i
Guy P. Eeatty, Jr.
Nuclear P]nnt Manager
. r 8, P. mur-Crystal P.$ver Unit 3 m
i T1orida 7ower Corporation
' t E urmsHr
{
F. D. CNENDON n.
nom
,l F.1 tons j
xc W. P.
Stnwart
} s. E. uunruf i
J. C. Hobbs L T. annEauum
'g P. R. Quick.
E cgAaK T
i 6
I t
)'
e 3
i 1
'r
?.
l d
I f
k
~ ~ ~
y y
~
l
- p..)
7 9083 0 0~7 gf) ie A.__-_
.. ~.
J