Text
} f}
p p*
4 UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666-0001 e\\
/
Decenber 10, 1996 Mr. E. Thomas Boulette, Ph.D Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, MA 02360 SUtMECT: CLOSE0VT FOR BOSTON EDIS0N COMPANY RESPONSE TO GENERIC LETTER 92-01, REVISION 1, SUPPLEMENT 1 FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. M92716)
Dear Mr. Boulette:
On May 19, 1995, the NRC issued Generic Letter (GL) 92-01, Revision 1, Supplement 1 (GL 92-01, Rev.1, Supp.1), " Reactor Vessel Structural Integrity."
In GL 92-01, Rev. 1, Supp. 1, the NRC requested that nuclear licensees perform a review of their reactor pressure vessel structural integrity assessments in order "to identify, collect, and report any new data pertinent to [the] analysis of [the] structural integrity of their reactor pressure vessels (RPVs) and to assess the impact of that data on their RPV integrity analyses relative to the requirements of Section 50.60 of Title 10 of the Code of Federal Regulatfons (10 CFR 50.60), 10 CFR 50.61, Appendices G and H to 10 CFR Part 50 (which encompass pressurized thermal shock (PTS) and upper shelf energy (USE) evaluations), and any potential impact on low temperature overpressure (LTOP) limits or pressure-temperature (P-T) limits."
More specifically, in GL 92-01, Rev.1, Supp.1, the NRC requested that addressees provide the following information in their responses:
(1) a description of those actions taken or planned to locate all data relevant to the determination of RPV integrity, or an explanation of why the existing database is considered complete as previously submitted; (2) an assessment of any change in best-estimate chemistry based on consideration of all relevant data; (3) a determination of the need for the use of the ratio procedure in accordance with the established Position 2.1 of Regulatory Guide 1.99, i
'J Revision 2, for those licensees that use surveillance data to provide a basis for the RPV integrity evaluation; and (4) a written report providing any newly acquired data as specified above i
and (1) the results of any necessary revisions to the evaluations of RPV l
integrity in accordance with the requirements of 10 CFR 50.60, p
l 10 CFR 50.61, Appendices G and H to 10 CFR Part 50, and any potential I
impact of the LTOP and P-T limits in the technical specifications, or (2) a certification that previously submitted evaluations remain valid.
h l
9612160206 961210 l
PDR ADOCK 05000293 P
..- ~.- ~~ ~-.
E. Boulette Decenber 10, 1996 i
Revised evaluations and certifications were to include consideration of Position 2.1 of Regulatory Guide 1.99, Revision 2, as applicable, and any new data. The information in Reporting Item (1) was to be submitted within 90 days of the issuance of the GL. The information in Reporting Items (2) - (4) was to be submitted within 6 months of the issuance of the GL.
i The staff has noted that Boston Edison Company (BECo) submitted the j
information requested in Reporting Item (1) on August 16, 1995, and requested in Reporting Items (2) - (4) on November 17, 1995.
Your response indicates that BECo has performed some additional reviews of the pertinent Owners Group databases and has not found any additional data regarding the best-estimate chemistries for the RPV materials and-surveillance capsules at the Pilgrim l
Nuclear Power Station.
Since BEco has submitted the requested information and has indicated that the previously submitted evaluations remain valid, the staff considers the RPV integrity data for the Pilgrim Nuclear Power Station j
to be complete at this time. -The staff therefore concludes that,no additional i
information regarding the structural integrity of the RPV,at.the Pilgrim Nuclear Power Station is available at this time, and that your efforts i
regarding GL 92-01, Rev.1, Supp.1 are complete. This completes all actions i
related to the referenced TAC Humber.
The staff has also noted that you are' waiting for some of.the Owners Groups Reactor Vessel Working Groups to complete activities to' establish a_
comprehensive RPV information database. yThese assessments are' expected to be completed by the summer of 1997. We request that you provide.us with the results of the Owners Groups' programs relative tolyour' plant.' ' When you 1
j providethisinformation,thestaffmayopena; plant-specificTACNo.forits review.
e y,y
,e i.
Questions regarding this letter should be sent to me at the letterhead a.ddress l
or you can contact me at (301) 415-1445. Thank -you for your cooperati 1
- Singrely, j
Alan B. Wang, Project Manager Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-293 cc:
See next page DISTRIBUTION:
Docket File SVarga Slittle RConte, RGN-I PUBLIC JZwolinski OGC DMcDonald PDI-I Reading SBajwa ACRS DOCUMENT NAME:PIM92716.LTR To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy OFFICE PM:PDial lE LA:PDI 1 O\\J_,
l D:PDI 1 /rb l
l l
NAME AWang:nw lb V' SLIttle #
$8ejwa /3 # M f DATE 12/ (/%
12/ 5 /%
12/ /0/%
12/ /96 12/ /%
Offic' al Record Copy
f E. Boulette :
Revised evaluations and certifications were to include consideration of Position 2.1 of Regulatory Guide 1.99, Revision 2, as applicable, and any new data. The information in Reporting Item (1) was to be submitted within 90 days of the issuance of the GL. The information in Reporting Items (2) - (4)
)
was to be submitted within 6 months of the issuance of the GL.
The staff has noted that Boston Edison Company (BECo) submitted the information requested in Reporting Item (1) on August 16, 1995, and requested in Reporting Items (2) - (4) on November 17, 1995.
Your response indicates that BEco has performed some additional reviews of the pertinent Owners Group databases and has not found any additional data regarding the best-estimate chemistries for the RPV materials and surveillance capsules at the Pilgrim l
Nuclear Power Station.
Since BEco has submitted the requested information and has indicated that the previously submitted evaluations remain valid, the j
staff considers the RPV integrity data for the Pilgrim Nuclear Power Station to be complete at this time. The staff therefore concludes that no additional information regarding the structural integrity of the RPV at the Pilgrim Nuclear Power Station is available at this time, and that your efforts regarding GL 92-01, Rev. 1, Supp. I are complete. This completes all actions l
related to the referenced TAC Number.
The staff has also noted that you are waiting for some of the Owners Groups Reactor Vessel Working Groups to complete activities to establish a i
comprehensive RPV information database. These assessments are expected to be completed by the summer of 1997. We request that you provide us with the results of the Owners Groups' programs relative to your plant. When you provide this information, the staff may open a plant-specific TAC No. for its review.
Questions regarding this letter should be sent to me at the letterhead address or you can contact me at (301) 415-1445. Thank you for your cooperation.
Sincerely, han (U Dat Alan B. Wang, Project Manager i
Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-293 cc:
See next page
l a
l E. Thomas Boulette Pilgrim Nuclear Power Station cc:
Mr. Leon J. Olivier Mr. David F. Tarantino Vice President of Nuclear Nuclear Information Manager Operations & Station Director Pilgrim Nuclear Power Station j
Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road RFD #1 Rocky Hill Road Plymouth, MA 02360 Ms. Kathleen M. O'Toole Resident Inspector Secretary of Public Safety i
U. S. Nuclear Regulatory Commission Executive Office of Public Safety Pilgrim Nuclear Power Station One Ashburton Place Post Office Box 867 Boston, MA 02108 Plymouth, MA 02360 Mr. David Rodham, Director l
Chairman, Board of Selectmen Massachusetts Emergency Management 11 Lincoln Street Agency Plymouth, MA 02360 400 Worcester Road P.O. Box 1496 1
Chairman, Duxbury Board of Selectmen Framingham, MA 01701-0317 Town Hall Attn: James Muckerheide 1
878 Tremont Street Duxbury, M 02332 Chairmen, Citizens Urging Responsible Energy Office of the Commissioner P. O. Box 2621 Massachusetts Department of Duxbury, MA 02331 Environmental Protection One Winter Street Citizens at Risk Boston, MA 02108 P. O. Box 3803 Plymouth, MA 02361 Office of the Attorney General One Ashburton Place W. S. Stowe, Esquire 20th Floor Boston Edison Company Boston, MA 02108 800 Boylston St., 36th Floor Boston, MA 02199 Mr. Robert M. Hallisey, Director Radiation Control Program Chairman Massachusetts Department of Nuclear Matters Committee Public Health Town Hall 305 South Street 11 Lincoln Street Boston, MA 02130 Plymouth, MA 02360 Regional Administrator, Region I Mr. William D. Meinert U. S. Nuclear Regulatory Commission Nuclear Engineer 475 Allendale Road Massachusetts Municipal Wholesale King of Prussia, PA 19406 Electric Company P.O. Box 426 Ms. Jane Fleming Ludlow, MA 01056-0426 8 Oceanwood Drive Duxbury, MA 02332 Mrs. Nancy Desmond Manager, Reg. Affairs Dept.
Pilgrim Nuclear Power Station RFD #1~ Rocky Hill Road Plymouth, MA 02360