Letter Sequence Approval |
---|
EPID:L-2020-TOP-0022, Cover Letter Final Safety Evaluation for Westinghouse Electric Company LTR-NRC-19-15, Notification of Changes to Westinghouse Qms (Approved, Closed) |
|
MONTHYEARML19246A0082019-09-19019 September 2019 Cover Letter Final Safety Evaluation for Westinghouse Electric Company LTR-NRC-19-15, Notification of Changes to Westinghouse Qms Project stage: Request ML20120A5382020-04-30030 April 2020 Request for Additional Information Westinghouse Electric Company Topical Report Quality Management System (Qms), Revision 8.0 Project stage: RAI ML20125A2842020-05-0505 May 2020 Cover Letter Draft Safety Evaluation for Westinghouse Electric Company Topical Report Quality Management System (Qms), Revision 8.0 Project stage: Draft Approval ML20132A3252020-05-12012 May 2020 Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report Quality Management System (Qms) Project stage: Approval ML20132A0172020-05-12012 May 2020 Final Safety Evaluation for Westinghouse Electric Company Topical Report Quality Management System (Qms), Revision 8.0 Project stage: Request ML20132A3212020-05-12012 May 2020 Enclosure Final Safety Evaluation for Westinghouse Electric Company Topical Report Quality Management System (Qms), Revision 8.0 Project stage: Approval ML20132A3032020-05-12012 May 2020 Cover Letter Final Safety Evaluation for Westinghouse Electric Company Topical Report Quality Management System (Qms), Revision 8.0 Project stage: Approval ML20140A3302020-05-20020 May 2020 Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report Quality Management System (Qms), Revision 8.0 Project stage: Other 2020-05-12
[Table View] |
|
---|
Category:- No Document Type Applies
MONTHYEARML22180A2212022-09-12012 September 2022 Us Nuclear Regulatory Commission Record of Decision Westinghouse Electric Company LLC Application for Renewal of Columbia Fuel Fabrication Facility Richland County South Carolina ML22054A1882022-02-23023 February 2022 South Carolina Department of Health and Environmental Control, Bureau of Air Quality Draft Statement of Basis for the State Operating Permit for Westinghouse Electric Company, LLC in Hopkins, South Carolina ML22054A1872022-02-23023 February 2022 South Carolina Department of Health and Environmental Control, Bureau of Air Quality Draft State Operating Permit for Westinghouse Electric Company, LLC in Hopkins, South Carolina ML21187A2012021-03-27027 March 2021 NPS 2018 Congaree Biosphere Res ML21187A2082021-03-0909 March 2021 NRCS_2021_Soil_Report ML21189A3542021-02-23023 February 2021 Nces 2020 ML20353A2952020-12-18018 December 2020 Enclosure 18 -Response to Request for Additional Information - Acetone and 2-Butanone Creation Associated with Biological and Chemical Remediation of Environmental Contamination ML21187A2112020-10-19019 October 2020 NWS2020 Congaree - Advanced Hydrologic Prediction Service ML20162A0272020-06-10010 June 2020 FAQs Regarding Nrc'S Decision to Prepare an EIS for Westinghouse Cfff License Renewal ML20132A3252020-05-12012 May 2020 Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report Quality Management System (Qms) ML19246A0242019-09-19019 September 2019 Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company LTR-NRC-19-15, Notification of Changes to Westinghouse Qms ML19190A2912019-08-0606 August 2019 NON-PROP Attachment 1 - Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies ML19218A1712019-06-27027 June 2019 List of Attendees for the June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Clad ML19218A2222019-06-27027 June 2019 List of Attendees for the Summary of June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18443-P/Np, Qualification of the Two-Dimensional Transport Code Paragon2 ML19143A1312019-04-29029 April 2019 Attendees List Closed Pre-submittal Meeting WCAP-10965-P-A Add 3 Nexus TR ML19101A0282019-02-28028 February 2019 Attendees List for Westinghouse Electric Company - USNRC Partially Closed Meeting to Discuss Proprietary Information Regarding Westinghouse Encore Accident Tolerant Fuel Technology ML19028A0952019-01-17017 January 2019 Attendees List 1-17-2019 Closed Meeting to Discuss Westinghouse Electric Company (Westinghouse) Accident Tolerant Fuel Technology ML19022A0162018-12-27027 December 2018 Attendees Closed Meeting 12-27-18 WCAP-16260-P ML18263A1932018-09-18018 September 2018 Attendee List for Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Licensing Plan ML18213A1352018-07-18018 July 2018 List of Attendees WCAP-18240-P, Westinghouse Thermal Design Procedure (Wtdp) Pre-submittal Closed Meeting ML18165A0872018-06-11011 June 2018 06/11-12/2018, Closed Audit List of AWCAP-16747-P ML18073A2242018-03-22022 March 2018 Enclosure - Evaluation on Threshold Determination ML21187A2372012-06-0707 June 2012 SCDHEC 2012 Air Permit ML0627101442006-09-25025 September 2006 Violations (Violations Are Severity Level IV Unless Otherwise Stated) 2022-09-12
[Table view] |
Text
RESOLUTION OF COMMENTS ON DRAFT SAFETY EVALUATION FOR TOPICAL REPORT QUALITY MANAGEMENT SYSTEM (QMS), REVISION 8.0 WESTINGHOUSE ELECTRIC COMPANY By letter dated May 7, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20129K029), Westinghouse Electric Company (Westinghouse) provided comments on the draft safety evaluation (SE) for Topical Report Quality Management System (QMS), Revision 8.0. Westinghouse stated that there is no proprietary information in the draft SE. The NRC staff has reviewed two clarification comments provided by Westinghouse and agrees that the proposed changes provide additional clarification. The NRC staff reviewed nine editorial comments provided by Westinghouse and finds them acceptable because the changes are editorial in nature.
Comment Comment Location Comment Type Comment NRC Number 1 Page 1/Line 15 Editorial ML20118C993 is the non-proprietary Change accepted package. ML20118C994 is the actual transmittal letter. Suggest referencing ML20118C994 to be consistent with the SE cover letter.
2 Page 1/Line 36 Editorial Revision 7.0 should be changed to Change accepted Revision 7.1. Westinghouse QMS Revision 7.1 was accepted by the U.S.
NRC on September 19, 2019 (ML19246A008) 3 Page 1/Line 36 Editorial The quoted QMS text is in Section 4.3.1, Change accepted General, under Procurement.
Therefore, Section 4.3, Procurement, should be changed to Section 4.3.1, General, under Procurement.
4 Page 1/Line 46 Editorial The quoted QMS text is missing the Change accepted following paragraphs:
For safety-related items and services, Quality determines the need to conduct supplier audits based on an evaluation that is conducted and documented in accordance with established procedures. Based on this evaluation Supplier audits need not be conducted for suppliers of safety-related items which are:
Audit programs for suppliers of items and services for nuclear power plants that are not subject to NRC regulations comply with requirements imposed by the governing regulatory agency or customer contract.
Attachment
Comment Comment LocationComment Type Comment NRC Response Number 5 Page 2/Line 27 Editorial type should be changed to types Change accepted 6 Page 2/Line 42 Editorial the should be deleted Change accepted 7 Page 2/Line 43 Editorial supplier audits should be changed to Change accepted supplier audits and surveys to be consistent with the last sentence in the paragraph.
8 Page 3/Line 41-42 Clarification It is unclear to Westinghouse the Change made. Final applicability of the SE reference to SE references Westinghouse, when the QMS cites RG 1.28, Rev. 4, RG 1.28, Revision 4, Section C.2.b.5 Section C.2.b.5 and which allows the 90-day grace period. not the SE.
9 Page 4/Line 10 Editorial length should be changed to duration Change accepted 10 Page 5/Line 7 Clarification It is unclear to Westinghouse the Change made. Final applicability of the SE reference to SE references Westinghouse, when the QMS cites RG 1.28, Rev. 4, RG 1.28, Revision 4, Section C.2.b.5 Section C.2.b.5 and which allows the 90-day grace period. not the SE.
11 Page 5/ Line 7 Editorial ML101830108 should be changed to Change made. Final ML101820108 SE references RG 1.28, Rev. 4 when discussing the 90-day grace period. SE reference deleted.