ML20129K268

From kanterella
Jump to navigation Jump to search
Order (Corrections to LBP-96-23).* Changes Listed.W/ Certificate of Svc.Served on 961108
ML20129K268
Person / Time
Site: Oyster Creek
Issue date: 11/08/1996
From: Bollwerk G
Atomic Safety and Licensing Board Panel
To:
AFFILIATION NOT ASSIGNED, CITIZENS AWARENESS NETWORK
References
CON-#496-18043 96-717-02-OLA, 96-717-2-OLA, LBP-96-23, OLA, NUDOCS 9611140061
Download: ML20129K268 (6)


Text

._

l Ju@

b UNITED STATES OF AMERICA 00CKEIEO NUCLEAR REGULATORY COMMISSION USNRC ATOMIC SAFETY AND LICENSING BOARD g g, ,g g Before Administrative Judges:

OFFICE OF SECRETARY DOCKEII ERVICE G. Paul Bollwerk, III, Chairman Dr. Charles N. Kelber Dr. Peter S. Lam i

In the Matter of l Docket No. 50-219-OLA GENERAL PUBLIC UTILITY NUCLEAR CORPORATION ASLBP No. 96-717-02-OLA (Oyster Creek Nuclear November 8,1996 Generating Station)

SERVED NOV-BW (Corrections to LBP-96-23)

The following corrections are made to LBP-96-23,44 NRC ___ (Oct. 25,1996):

1. On page two, the seventh line of the text is revised to read as follows:

" entitled to standing as of right or to show it should be afforded discretionary".

2. On page four, in the first line of the continuation of footnote two, the phrase

" Energy Act (AEA)" is revised to read " Energy Act (AEA),42 U.S.C. { 2239(a)(1)(A),".

2. 9n page five, in the fourth, eleventh, thirteenth, fourteenth, sixteenth, seventeenth, and nineteenth lines of the text; on page six in the second line of the text; and on page eight in the eighth line of the text, the acronym "HMS" is revised to read "HSM".

'Q \.

9611140061 961108

" b PDR ADOCK 05000219 Q PDR b

4 I

! 4. On page six, in the third line of the text, the word "into" is revised to read "onto".

5. On page six, in the twenty-third line of the text, tne phrase "two and" is revised  !

to read "two-and ".

6. On page seven, in the twenty-second line of the text, the word " half" is revised to read "one-half". ,
7. On page eight, in the second line of footnote six, the word "an" is revised to read "a".
8. On page eight, the fourth line of footnote six is revised to read as follows:

" hearing rights under AEA section 189a,42 U.S.C. Q 2239(a). Sgg Cleveland".

9. On page nine, in the eighteenth line of the text, the phrase "5000 pound" is revised to read "5000-pound".

, J l

10. On page nine, in the twenty-second line of the text, the phrase "350 pound" is revised to read "350-pound".

I1, On page nine, in the twenty-fifu line of the text, the phrase "2000 gallon" is revised to read "2000-gallon".

12. On page ten, in the thirteenth line of the text, delete the word "that".

13.~ On page twelve, in the thirteenth line of the text, the word " practicable" is revised to read " practical".

I 14. On page thirteen, in the forty-second line of the continuation of footnote i  !

4 seven, the phrase "5000 pound" is revised to read "5000-pound". l j

i

. 1

l

)

15. On page fourteen, the tenth line of the text is revised to read as follows:

" heavier than a fuel assembly to be carried over spent fuel will violate

" defense-in-depth'*'.

16. On page nineteen, in the first and third lines of the text, the word "has" is revised to read "had".

l

17. On page nineteen, in the second line of the text, the word " petitioners" is t

revised to read " petitioners'".

18. On page twenty-two, in the fifteenth line of the text, delete the first word o 97,,,
19. On page twenty-seven, in the third line of the text, and on page thirty-one, in the second line of the text, the word " injury-in-fact" is revised to read " injury in fact".
20. On page twenty-nine, the sixth line of the text is revised to read as follows:

" provide the requisite injury in fact for standing as of right. We agree with that analysis,".

21. On page thirty, in the sixth line of the text, the word " petitioners'" is revised I

l

- to read " petitioner's". \

22. On page thirty-three, in the fourth line of the text, the word " issue" is revised to read " matter". J l
23. On page forty, in the fifth line of the text, the phrase " oral argument" is i

j revised to read "prehearing conference".

4

24. On page forty-one, the seventh line of the text is revised to read as follows:

" reason to conclude Basis C establishes a".

25. On page forty-one, in the eighth line of the continuation of footnote nineteen, the word "NUREG-0652" is revised to read "NUREG-0612".

l 26. On page forty-two, in the sixteenth line of the text, the word " practicable" is revised to read " practical".

! 27. On page forty-five, in the fourth line of the text, the phrase " live, work, or engages in" is revised to read " lives, works, or engages in".

28. On page forty-five, in the sixteenth line of the text, the phrase "is entitled to" is revised to read "should be granted".
29. On page forty-five, in the twenty-third line af the text, the citation " supra l

p.1," is revised to read " supra p.12,".

1

30. On page forty-seven, in the second line of footnote twenty-four, the acronym "GPU" is revised to read "GPUN".

l FOR THE ATOMIC SAFETY AND LICENSING BOARD

b. J 'U 5 i

G. Paul Bollwerk,III, Chairman ADMINISTRATIVE JUDGE l

l Rockville, Maryland November 8,1996 1

-. . - . . - - - - - - . - . - _ - ~ _ . .-.- - - - - .-

i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION l In the Matter of GENERAL PUBLIC UTILITY NUCLEAR Docket No.(s) 50-219-OLA CORPORATION l

(Oyster Creek Nuclear Generating Station) l CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB CORRECTIONS TO LBP-96-23 l have been served upon the following persons by U.S. mail, first class, except ,

I as otherwise noted and in accordance with the requirements of 10 CFR Sec. 2.712.

1

! Administrative Judge l Office of Commission Appellate G. Paul Bollwerk, Chairman l Adjudication Atomic Safety and Licensing Board i U.S. Nuclear Regulatory Commission Mail Stop - T-3 F23 Washington, DC 20555 U.S. Nuclear Regulatory Commission l

j Washington, DC 20555 Administrative Judge Administrative Judge l Charles N. Kelber Peter S. Lam j_ Atomic Safety and Licensing Board Atomic Safety and Licensing Board i Mail Stop - T-3 F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Ann P. Hodgdon, Esq.

Richard G. Bachmann, Esq. Ernest L. Blake, Jr., Esq.

l Office of the General Counsel David R. Lewis, Esq.

l Mail Stop 15 B18 Shaw, Pittman, Potts & Trowbridge

! U.S. Nuclear Regulatory Commission 2300 N Street, N.W.

Washington, DC 20555 Washington, DC 20037 4

Kent Tosch i Frederick Katz Bureau of Nuclear Engineering l l Citizens Awareness Network New Jersey Department of Environmental P.O. Box 83 Protection Shelborne Falls, MA 01370 CN 415 Trenton, NJ 08625 1

.. .- . _- _ _ _ . -- . . _ . = . . . -

I Docket No.(s)50-219-OLA LB CORRECTIONS TO LBP-96-23 l

Paul Gunter William decamp, Jr.

l '

Nuclear Information and Resource Oyster Creek Nuclear Watch l

I Service P.O. Box 243 l 1424 16th Street, NW, Suite 404 Island Heights, NJ 08732 l Washington, DC 20036 Dated at Rockville, Md. this -

8 day of November 1996 Office of th cretary of the Commission I

l 1

l e

i