e
jk" "' %g
UNITED ST AVES
(
,t
NUCLEAR REGULATORY COMMISSION
J-
REGloN IV
f
611 RY AN PL AZA DRIVE, SUIT E 400
6
- .../
t
AR LINGTON, Th X As 76011 8064
y
OCT 31 1996
Donald F. Schnell, Senior Vice
President - Nuclear
Union Electric Company
P.O. Box 149
St. Louis, Missouri 63166
SUBJECT: NRC INSPECTION REPORT 50-483/96-09 AND NOTICE OF VIOLATION
Dear Mr. Schnell:
An NRC inspection was conducted September 1 through October 12,1996, at your
Callaway Plant reactor facility. The enclosed report presents the scope and results of that
inspection.
During the 6-week period covered by this inspection period, your conduct of activities at
Callaway was generally characterized by safety-conscious operations; sound engineering
practices; and appropriate performance of maintenance, surveillance, and plant support
activities. We are concerned, however, about one violation of NRC requirements that was
identified by the NRC inspectors. The violation involved failure to properly translate a
modification to a hydrogen recombiner into plant procedures. The violation is of concern
because it indicates a weakness in your design modification process that did not ensure
procedures associated with the modification were revised prior to modification
implementation.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detail in the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
,
I
its enclosure, and your response will be placed in the NRC Public Document Room (PDR).
l
To the extent possible, your response should not include any personal privacy, proprietary,
l
or safeguards information so that it can be placed in the PDR without redaction.
l
9611060224 961031
ADOCK 05000483
G
.
__
.
.-
.
Union Electric Company
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
J. E.
yer, Director
Division of Reactor Projects
Docket No.: 50-483
'
License No.: NPF-30
Enclosures:
,
'
2. NRC Inspection Report
50-483/96-09
cc w/ enclosures:
Professional Nuclear Consulting, Inc.
l
19041 Raines Drive
Derwood, Maryland 20855
Gerald Charnoff, Esq.
Thomas A. Baxter, Esq.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, N.W.
Washington, D.C. 20037
l
H. D. Bono, Supervising Engineer
Site Licensing
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
G. L. Randolph, Vice President
Nuclear Operations
'
Union Electric Company
P.O. Box 620
l
Fulton, Missouri 65251
l,
l
!
-- -
..
- _ . - . - - - ...
_. - - --. .-
-
. - - . .
.
-.- .- - .
.
.
Union Electric Company
-3-
Manager - Electric Department
Missouri Public Service Commission
301 W. High
P.O. Box 360
Jefferson City, Missouri 65102
Ronald A. Kucera, Deputy Director
Department of Natural Resources
!-
P.O. Box 176
' ~
Jefferson City, Missouri 65102
Neil S. Carns, President and
l
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, Kansas 66839
Dan I. Bolef, President
Kay Drey, Representative.
,
Board of Directors Coalition
!
.for the Environment
l
6267 Delmar Boulevard
University City, Missouri 63130
i
Lee Fritz, Presiding Commissioner
Callaway County Court House.
10 East Fifth Street
!
Fulton, Missouri 65151
Alan C. Passwater, Manager
Licensing and Fuels
Union Electric Company
l
P.O. Box 149
St. Louis, Missouri 63166
J. V. Laux, Manager
]
Quality Assurance
1
l
l
Union Electric Company
I
P.O. Box 620
l
Fulton, Missouri 65251
Q
i
!
5
a
l
4
y1.y
-
,
. .
.
-
, . , ,
._
_ . , - , - . .
.
~-
. . - _ . _ _ - . _ _ . . _
_ _ _ _ _ - _ . _ _ . . _ _ _
_ _ _ . - .
_.- _ _ _ .._ _ . _ _ . _ . .
!
l,
OCT 3 I l996
,
Union Elet:tric Company
-4-
!
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
l
~
gcc'to DMB (IE01)
i
l
bec distrib. by RIV:
l
L. J. Callan
Resident inspector
DRP Ditector
DRS-PSB
'
l
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
{
l
L
l
!
.
l
!
l
l
l
l
t
l
!
!
DOCUMENT NAME: R:\\_CW\\CW609RP.DGP
')
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy
,
RIV:SRil,M
C:DRP/B[ [
D:DRP
DGPass(11'
WDJohns]n
JEDyer 3/54.
10/ g\\ /96
10/ g1/96
10/3//96
OFFICIAL RECORD COPY
060052
.
-
.
.
-
.
_
_ . _ _ . _ _ _ _ _ - . _
_ _- . __. .
_. _ _
. - _ _ .
_.
_ . _
_______._m.
.
l
-
l
l.
OCT 3 l 1996
Union Electric Company
-4-
,
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bec to DMB (IE01)
bec distrib. by RIV:
!
!
L. J. Callan
Resident inspector
l
DRP Director
DRS-PSB
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
t
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
!
I
l
DOCUMENT NAME: R:\\_CW\\CW609RP.DGP
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
_
j
RIV:SRll,M
C:DRP/Bl [
D:DRP
j
DGPass@l'
WDJohns]n
JEDyer 3/pt
10/ g\\ /96
10/ g1/96
10/3//96
I
OFFICIAL RECORD COPY
f
t
!
. ~ - -
-_ ,