Forwards Draft SER Requesting Addl Info Re Generic Ltr 83-28,Item 1.1 Concerning post-trip Review.Addl Info Needed Re Criteria for Determining Acceptability of Restart & Method
ML20129J294
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/21/1985
From: John Miller
Office of Nuclear Reactor Regulation
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20129J297 List:
References
GL-83-28, NUDOCS 8506100051
Download: ML20129J294 (4)


Text

y -

O f

  • e May 21, 1985 DISTRIBUTIONS N ABournia Docket No. 50-285 NRC PDR DShum Local PDR ACRS +10 ORB Rdg Gray File HThompson Mr. R. L. Andrews OELD Division Manager, Nuclear Production EJordan Omaha Public Power District BGrimes 1623 Harney Street JPartlow Omaha, Nebraska 68102 EGTourigny PMKreutzer

Dear Mr. Andrews:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON ITEM 1.1.,

GENERIC LETTER 83-28 The staff and its consultant, Science Applications International Corporation, have completed the review of your submittal made in response to Item 1.1 of Generic letter 83-28, Post-Trip Review. The results of our review are con-tained in the enclosed draf t safety evaluation.

We find that we require additional information in the following areas:

1. The criteria for determining the acceptability of the restart.
2. The qualifications, responsibilities and authorities of the personnel responsible for performing the post-trip review.

i

3. The method and criteria for comparing the event with expected plant performance.
4. The criteria for determining the need for independent assessment of the event following a trip.
5. The minimum required information that must be included in the pro-cedures submitted.

These areas are discussed in greater detail in Section III of the draft safety evaluation.

P Nk $b5 PM

.m .

Mr. R. L. Andrews You are requested to respond to this request within 30 days of your receipt of this letter or provide the NRC project manager with a response date that

.you can accommodate. If you have any questions, please contact the project manager, E. Tourigny (301) 492-7110.

This request for information affects fewer than ten respondent; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Orginst s'gned by:

E. G. Tourigny, Acting Chief Operating Reactors Branch #3 Division of Licensing

Enclosure:

As stated cc w/ enclosure See next page

  • See previous concurrence page ORB #3:0L* ORBf3:DL* BY3 [

'PKreutzer ETourigny:dd J;;;;11er 5/20/85 5/20/85 5/>I/85

fl  ;,

o .

Mr. R. L. Andrews You are requested to respond to this request within 30 days of your receipt of this letter or provide the NRC project manager with a response date that you can accommodate. If you have any questions, please contact the project manager, E. Tourigny (301) 497-7110.

This request for information affects fewer than ten respondent; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, James R. Miller, Chief Operating Reactors Branch #3 Division of Licensing

Enclosure:

As stated cc w/ enclosure See next page r

ST ORBf3:DL ORB #3:DL ORBf3:DL zer ETourigny:dd JRMiller

/85 She /85 5/ /85

1 ,

{

l Mr. R. L. Andrews Omaha Public Power District Ft. Calhoun Station, Unit No. I c,

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby A MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68023 Metropolitan Planning Agency

.-- ATTN: Dagnia Prieditis 7000 West Center Road Omaha, Nebraska 68107 Mr. Larry Yandell U.S. NRC Resident Inspector Post Office Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations C-E Power Systems 7910 Woodmont Avenue Bethesda, Maryland 20814 Regional Administrator

. USNRC, Region IV Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 i

t i

t