ML20129J057

From kanterella
Jump to navigation Jump to search
Informs That 850328 Rev to FSAR Chapter 17.2 in Compliance W/Requirements of App B to 10CFR50 & Acceptable
ML20129J057
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/05/1985
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jens W
DETROIT EDISON CO.
References
NUDOCS 8506100003
Download: ML20129J057 (1)


Text

,.

L

?

JUN 5 1985 l

Docket No. 50-341 l

The Detroit Edison Company ATTN: Wayne H. Jens Vice President Nuclear Operations i

6400 North Dixie Highway l

l Newport, MI 48166 Gentlemen:

l l

The 10 CFR 50.71(e) submittal of your FSAR revisions dated March 28, 1985, has been reviewed by the Region III office as required by 10 CFR 50.54(a). This l

review was conducted of the Chapter 17.2 revisions to assess that no reduction l

in commitments had occured. Based on this review, we find that the revised j

p ngram continues to satisfy the requirements of 10 CFR 50, Appendix B, and is aptable.

Your timely submittal of the information required by 10 CFR 50.54(a) is appreciated.

Please contact Mr. Frank Hawkins of my staff (312-790-5555) with any questions you may have regarding this matter.

Sincerely,

" Original S!gne.J by R. L. Spessard" R. L. Spessard, Director Division of Reactor Safety cc:

L. P. Bregni, Licensing Engineer P. A. Marquardt, Corporate Legal Department DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Harry H. Voigt. Esq.

Nuclear Facilities and Environmental Monitoring Section G. T. Ankrum, IE NRR Project Manager hl II RI::I RI L

o W

/A KI, Vandel/lc Hawkins Chqissotimost g/jt ee 6/4/85 g

AY$ $

s

\\

/jlp/

u

__-