MONTHLY OPERATING. REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE ApnTT a. loss COMPLs1su BY R.
R COODENOW TELEPHONE (114)'676'-8460 PART A OPERATIONS
SUMMARY
MARCH 1985 Unit operated at full power for entire month except for a Reactor Trip on 3/3/85, as noted on Part E, and a scheduled shutdown on 3/29/85 due to a planned outage to remove startup strainers on main steam stops and control intercept valves.
During shutdown for the planned outage an Unusual Event was declared on 3/30/85 o
due to a safety injection actuation on low steamline pressure on one of the four steamlines.
PART B PORV AND SAFETY VALVE
SUMMARY
~
None 8506070631 850331 d
PDR ADOCK 05000483 11 R
PDR pF CA-#804 05/09/84 QDP-ZZ-04204 Page 1 of 4
~
Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DATE APRTT. 4. 1985 COMPLETED BY R. R. GOODENOW TELEPHONE (314) 676-8460 MONTH MARCH 19R5 a
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net)
~
1 1108 17 1102 1112 1098 2
gg 1091 1097 3
3,,
0 1096 4
3 21 1111 470 1108
- g 22 1076 1101 7
23 1097 1109 8
24 1107 1108 3
1104 1106 3
10 1100 1091 33 p
- 1106 1064 g,
828 13 1105 3
1099 0
14 y
1101 0
15 1034 16 CA-#804 05/09/64 Page 2 of 4 QDP-ZZ-04204 r---
--c w,
e i.
l Part D OPERATING DATA REPORT 50-483 DOCKET NO.
UNIT Callaway APRIL 4, 1985 DATE R. R. COODENOW COMPLETED BY (314) 676-8460 TELEPHONE OPERATING STATUS 744 MARCH 1985 gross MOURS IN REPORTING PERICO:
- 1. REPORTING PERIOO:
3413 MAX. DEPENO. CAPACITY (m): Not vet known
- 2. CURRENTLY AUTHORIZED POWER LEVEL (mwd:
OEslGN ELECTRfCAL RATING IMWo.Noo:
1171*
- At stretch reactor power level which is o.
not currently authorized under the operating license.
- 3. POWER LEVEL TO WHICM RESTRICTED (IP ANY) (MWo. Net)
- 4. REASONS FOR RESTRICTION llP ANYl:
THIS MONTH VR TO DATE CuMULATivt
. S.8. 2 2032.6 2335.1-
- 5. NUMSER OF HOURS REACTOR WAS CRITICAL 0
0 0
- s. REACTOR RESERVE SMuTOOWN MOURS 637.2 1976.5 2279.0
- 7. MOURS GENERATOR ON UNE 0
0 0
S. UNIT RESERVE SMUTDOWN MOURS
. $.091.R19 5.916.689 6.918.214
- 9. GROSS TMERMAL ENERGY GENERATED IMWHI 713,842 2,002,172 2.341,352 to. GROSS ELECTRICAL ENERGY GENERATED (MWM)..
679.448 1,894.764 2.217.787
- 11. NET ELECTRICAL ENERGY GENERATED (MWM) 88.5%
94.1Y 94.87
- 12. REACTOR SERvlCE PACTOR 88.5%
94.1%
94.8%
- 13. REACTOR AvalLAstuTY PACTOR 85.6%
91.5%
92.5%
- 14. UNI,7 SERVICE PACTOR 85.6%
91.5%
92.5%
i is. UNIT AvalLAeluTY PACTOR l
NA NA NA l*
- 16. UNIT CAPACITY PACTOR (Umas MDCI 78.0%*
74.9%*
76.97*
f
- 17. UNIT CAPACITY P ACTOR IUmns Dw MWel..
8.4%
6.4%
5.6%
ts uMIT PORCEO OUTAGE MATE
- 19. SMUTDOWNS SCHEDULED OVER NEXT S MONTMS ITYPE. DATE. AND OURATION OP EACMl: None l
20.17 SMUT DOWN AT END OF REPORT PERICO. ESTIMATED DATE OP STARTUP:
4 /10/R 5
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
PORECAST ACHIEVEO 10/2/84 f
INITIAL CRITICAuTy 10/24/84 INITI AL ELECTRICITY COMMERCIAL OPERATION
- Unit fully operational. 12/19/84. Placed in commercial operation 4/9/85.
CA-gqQ4 05/ vi84 the date unit is reflected in rates charged to Missouri customers.
Page 3 of 4 QDP-ZZ-04204
--,v
-y.
7--
m w
w
.,,g,
,--w,.---.----..-myv..---.7
--...,~.-~n w~-
ew-,
,-w i+ = - -
o Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway QATE APRIL 4, 1985 R. R. GOODENOW COMPLETED BY REPORT MONTH MARCH 1985 TELEPHONE (314) 676-8460 METHOD OF TYPE SHUTTING DOtWe F: FORCED DURAYlON THE REACTOR OR NO.
DATE S: SCHEDULED l HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONE/ COMMENTS 6
850303 Forced 58.3 A
3 Reactor Trip from 100% Power due to Pressurizer pressure. LER 85-016-00.
7 850329 Scheduled 48.5 B
1 Planned outage to remove startup strainers on main steam stops and control intercept valves.
SURAGARY:
i CA-f804
- 05/09/84 Page 4 of 4 QDP-ZZ-04204
er
.?: i.
i.;
UNION EtscTaic COMPANY CALLAWAY PLANT MAILING ADDRSSS:
P. O. BOX SSO FULTON. MO. SS2St April 9, 1985 Director, Resource'anagement M
U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1077
Dear-Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MARCH 1985 The enclosed Monthly Operating Report for March 1985 is
-submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
s.J S. E. Miltenberger Manager, Callaway Plant e n,
,/WRC/RRG/drs MET Enclosure cc: Distribution attached
.' i l
f:[
cw p
3 ;.,
ec distribution for ULNRC-1077.
with' enclosures Mr.' James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S.-Nuclear Regulatory Commission-
-Region III 799: Roosevelt Road Glen Ellyn, IL 60137
'- Director Office of Inspection'& Enforcement U. S. Nuclear Regulatory Commission
- Washington, DC.20555
- NRC Resident Inspector
- 1 h
I s
T d.
. m.mm m.m s.
m m. m m m
m
--