Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A8641999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20138K0131997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970324-28 ML20138K0091997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970324-28 ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135E7161997-03-0303 March 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961118-22 ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236U9391995-12-20020 December 1995 Discusses Oi,Region IV Rept of Investigation,Dtd 940511, Case 5-93-023R,which Reported OI Investigative Efforts Re Alleged Employee Discrimination at Plant Units 1,2 & 3.Rept Was Sent to Us Attorney Office in Phoenix,Az in May 1994 IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr1994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr ML20138F9871994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20198E3271992-10-20020 October 1992 Notification of Significant Licensee Meeting W/Util on 921027 to Discuss Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Programs within Security Dept ML20126L8441992-09-14014 September 1992 Provides Status Rept Concerning Actions Re Det Performed at Plant ML20127C2461992-03-0202 March 1992 Forwards AEOD SALP Input for Facilities in Support of Ongoing SALP Reviews.Two of Six Important Operating Events Involved Deficiencies of Reactor Power Cutback Sys Which Relies on Proper Functioning of Steam Bypass to Condenser ML20127B6281990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility IA-92-218, Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility1990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B5671990-12-12012 December 1990 Forwards NRR Input for SALP Rept,Per NRC Ofc Ltr 907,Rev 1 ,NRC Manual Chapter 0516 & 901120 Memo ML20059M2041990-09-27027 September 1990 Notification of Significant Licensee Meeting W/Util on 901003 to Discuss Licensee Response to Diagnostic Evaluation Team Findings & Overall Status of Programs. Addl NRC Attendees Should Be Made Known by 901002 ML20059L6531990-09-20020 September 1990 Notification of 900921 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives & Status in Area of QA ML20059D6361990-08-27027 August 1990 Notification of 900831 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Medical Qualifications & Exams of Licensed Operators ML20127B4571990-08-24024 August 1990 Comments on Response to Facility Diagnostic Evaluation Team Rept.Suggests That Region V Followup & Closely Monitor Development & Implementation of Specific Tasks Which Will Address Team Findings ML20058M3441990-08-0606 August 1990 Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at Plant ML20126L8271990-06-14014 June 1990 Provides Summary of Schedule & Status of Items Re Det of Plant Performed by Aeod,In Response to 900314 Memo ML20127B2171990-01-18018 January 1990 Forwards AEOD Input for Commissioner Curtiss Visit to Plant on 900201,consisting of Summary of Operating Experience from Oct 1988 to Dec 1989 ML20127B1681989-11-0909 November 1989 Forwards NRR Input to SALP for Facilities.Category 2 Rating Assigned in Functional Areas of Plant Operations, Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality Verification ML20246N7371989-08-29029 August 1989 Notification of Maint Team Insp Meeting on 890901 W/Util in Phoenix,Az to Discuss Status of Licensee Commitments from 890605 Mgt Meeting in Consideration of Unit 3 Restart ML20127B1401989-08-0707 August 1989 Forwards for Info & Consideration for Info Notice,Lers Describing Potter & Brumfield Relay Problems & Atmospheric Dump Valve Deficiencies.Info Provided as Part of AEOD Function to Identify Potential Adverse Events ML20127G5121989-03-15015 March 1989 Discusses Atmospheric Dump Valve Failures at Plant.Cause Still Under Investigation.Related Documentation Encl ML20236B4871989-03-14014 March 1989 Notification of 890316 Meeting W/Util in Rockville,Md to Discuss Electrical Distribution Sys as Related to Load Injection Event on 890303.Preliminary Agenda for Electrical Meeting Encl ML20195G8481988-11-21021 November 1988 Notification of Significant Meeting on 881201 in Wintersburg,Az to Review Util Action on NRC Concerns ML20206L6701988-11-21021 November 1988 Notification of 881209 Meeting W/Util in Rockville,Md to Present Engineering Excellence Program ML20207D6471988-08-0505 August 1988 Notification of Significant Meeting on 880817 W/Util in Walnut Creek,Ca for Enforcement Conference Re Early Criticality Event at Unit 1,personnel Radiation Overexposure at Unit 2 & Violation Re Essential Chiller Water Sys ML20196L2531988-06-28028 June 1988 Recommends Closeout of Eab Long-Term Followup Item 87-157 on Reactor Coolant Pump Shaft Cracking at Plant.Modified Shafts Installed & Vibration Monitoring Programs in Place ML20150A8971988-06-24024 June 1988 Advises That C-E 880108 Rept of Fuel Surveillance Test Results Previously Submitted to NRC as Nonproprietary Info, Should Be Considered Proprietary ML20196F9801988-06-23023 June 1988 Advises That Licensee 880609 Justification for Continued Operation Re Recent Auxiliary Feedwater Pump Degradation Event Acceptable.Licensee Will Perform Corrective Maint When Replacement Parts Received ML20154N1601988-05-25025 May 1988 Notification of 880531 Meeting W/Util in Rockville,Md to Discuss Evaluation of Failure of Auxiliary Feedwater Pump at Unit 1 & Planned Actions to Correct Root Cause of Failure ML20151E2061988-04-0808 April 1988 Notification of 880414 Meeting W/Util & BNL in Rockville,Md to Discuss Vibration Monitoring Program for Reactor Coolant Pump Shafts & Status on Plant Shaft Evaluations.Agenda Encl ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20147H6821988-03-0404 March 1988 Confirms 880302 Telcon Re Evaluation of Justification for Continued Operation.Agreed That Continued Operation of Plant Presents No Undue Risk to Public Health & Safety.Util Received Which Confirms Info Provided by T Polich ML20236X7421987-12-10010 December 1987 Forwards Draft Director'S Decision Re Coalition for Responsible Energy 2.206 Petition Concerning Plant Submitted on 870716,for Comments & Concurrence ML20195F8761987-12-0202 December 1987 Requests Review of Encl Draft SALP Rept for Plant.Recipients Should Be Prepared to Comment on Rept at 871208 Board Meeting.Update of Tables 1-10 Which Includes All Pertinent Data Through End of SALP Period Also Encl ML20236X5801987-11-30030 November 1987 Comments on Draft Director'S Decision on Coalition for Responsible Energy Education 2.206 Petition Re Plant. Editorial Comments for Consideration Marked on Encl Draft ML20247G3591987-09-16016 September 1987 Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 25141987-09-16016 September 1987 Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 ML20237L7011987-08-31031 August 1987 Notification of 870909 Meeting W/Util in Bethesda,Md to Discuss Proposed Amend to Tech Specs Re Organizational Structure.Meeting Agenda Encl ML20195G3751987-08-21021 August 1987 Forwards Rept Re Licensing & Restart Schedules,Per EDO 870727 Memo.Info Will Be Provided Weekly ML20235V8251987-07-20020 July 1987 Notification of 870730 Meeting W/Util & C-E in Bethesda,Md to Discuss Licensee 870629 Submittal on Cycle 2 Reload IR 05000528/19860261987-07-16016 July 1987 Forwards marked-up Draft NRC Info Notice Entitled Control of Hot Particle Contamination at Nuclear Power Plants, Per 870626 Request.Issuance of Notice Suggested.W/O Encl. Portion of NRC Insp Rept 50-528/86-26 Also Encl 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A8641999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20138K0131997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970324-28 ML20138K0091997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970324-28 ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135E7161997-03-0303 March 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961118-22 ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236U9391995-12-20020 December 1995 Discusses Oi,Region IV Rept of Investigation,Dtd 940511, Case 5-93-023R,which Reported OI Investigative Efforts Re Alleged Employee Discrimination at Plant Units 1,2 & 3.Rept Was Sent to Us Attorney Office in Phoenix,Az in May 1994 ML20138F9871994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr1994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20198E3271992-10-20020 October 1992 Notification of Significant Licensee Meeting W/Util on 921027 to Discuss Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Programs within Security Dept ML20126L8441992-09-14014 September 1992 Provides Status Rept Concerning Actions Re Det Performed at Plant ML20127C2461992-03-0202 March 1992 Forwards AEOD SALP Input for Facilities in Support of Ongoing SALP Reviews.Two of Six Important Operating Events Involved Deficiencies of Reactor Power Cutback Sys Which Relies on Proper Functioning of Steam Bypass to Condenser IA-92-218, Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility1990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B6281990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B5671990-12-12012 December 1990 Forwards NRR Input for SALP Rept,Per NRC Ofc Ltr 907,Rev 1 ,NRC Manual Chapter 0516 & 901120 Memo ML20059M2041990-09-27027 September 1990 Notification of Significant Licensee Meeting W/Util on 901003 to Discuss Licensee Response to Diagnostic Evaluation Team Findings & Overall Status of Programs. Addl NRC Attendees Should Be Made Known by 901002 ML20059L6531990-09-20020 September 1990 Notification of 900921 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives & Status in Area of QA ML20059D6361990-08-27027 August 1990 Notification of 900831 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Medical Qualifications & Exams of Licensed Operators ML20127B4571990-08-24024 August 1990 Comments on Response to Facility Diagnostic Evaluation Team Rept.Suggests That Region V Followup & Closely Monitor Development & Implementation of Specific Tasks Which Will Address Team Findings ML20058M3441990-08-0606 August 1990 Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at Plant ML20126L8271990-06-14014 June 1990 Provides Summary of Schedule & Status of Items Re Det of Plant Performed by Aeod,In Response to 900314 Memo ML20127B2171990-01-18018 January 1990 Forwards AEOD Input for Commissioner Curtiss Visit to Plant on 900201,consisting of Summary of Operating Experience from Oct 1988 to Dec 1989 ML20127B1681989-11-0909 November 1989 Forwards NRR Input to SALP for Facilities.Category 2 Rating Assigned in Functional Areas of Plant Operations, Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality Verification ML20246N7371989-08-29029 August 1989 Notification of Maint Team Insp Meeting on 890901 W/Util in Phoenix,Az to Discuss Status of Licensee Commitments from 890605 Mgt Meeting in Consideration of Unit 3 Restart ML20127B1401989-08-0707 August 1989 Forwards for Info & Consideration for Info Notice,Lers Describing Potter & Brumfield Relay Problems & Atmospheric Dump Valve Deficiencies.Info Provided as Part of AEOD Function to Identify Potential Adverse Events ML20127G5121989-03-15015 March 1989 Discusses Atmospheric Dump Valve Failures at Plant.Cause Still Under Investigation.Related Documentation Encl ML20236B4871989-03-14014 March 1989 Notification of 890316 Meeting W/Util in Rockville,Md to Discuss Electrical Distribution Sys as Related to Load Injection Event on 890303.Preliminary Agenda for Electrical Meeting Encl ML20206L6701988-11-21021 November 1988 Notification of 881209 Meeting W/Util in Rockville,Md to Present Engineering Excellence Program ML20195G8481988-11-21021 November 1988 Notification of Significant Meeting on 881201 in Wintersburg,Az to Review Util Action on NRC Concerns ML20207D6471988-08-0505 August 1988 Notification of Significant Meeting on 880817 W/Util in Walnut Creek,Ca for Enforcement Conference Re Early Criticality Event at Unit 1,personnel Radiation Overexposure at Unit 2 & Violation Re Essential Chiller Water Sys ML20196L2531988-06-28028 June 1988 Recommends Closeout of Eab Long-Term Followup Item 87-157 on Reactor Coolant Pump Shaft Cracking at Plant.Modified Shafts Installed & Vibration Monitoring Programs in Place ML20150A8971988-06-24024 June 1988 Advises That C-E 880108 Rept of Fuel Surveillance Test Results Previously Submitted to NRC as Nonproprietary Info, Should Be Considered Proprietary ML20196F9801988-06-23023 June 1988 Advises That Licensee 880609 Justification for Continued Operation Re Recent Auxiliary Feedwater Pump Degradation Event Acceptable.Licensee Will Perform Corrective Maint When Replacement Parts Received ML20154N1601988-05-25025 May 1988 Notification of 880531 Meeting W/Util in Rockville,Md to Discuss Evaluation of Failure of Auxiliary Feedwater Pump at Unit 1 & Planned Actions to Correct Root Cause of Failure ML20151E2061988-04-0808 April 1988 Notification of 880414 Meeting W/Util & BNL in Rockville,Md to Discuss Vibration Monitoring Program for Reactor Coolant Pump Shafts & Status on Plant Shaft Evaluations.Agenda Encl ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20147H6821988-03-0404 March 1988 Confirms 880302 Telcon Re Evaluation of Justification for Continued Operation.Agreed That Continued Operation of Plant Presents No Undue Risk to Public Health & Safety.Util Received Which Confirms Info Provided by T Polich ML20236X7421987-12-10010 December 1987 Forwards Draft Director'S Decision Re Coalition for Responsible Energy 2.206 Petition Concerning Plant Submitted on 870716,for Comments & Concurrence ML20236W3181987-12-0404 December 1987 Staff Requirements Memo Re Commission 871125 Discussion/Vote in Washington,Dc on Full Power OL for Facility.Commission Requested Staff to Monitor Control Room & Corporate Mgt Activities & to Increase Number of Resident Inspectors ML20195F8761987-12-0202 December 1987 Requests Review of Encl Draft SALP Rept for Plant.Recipients Should Be Prepared to Comment on Rept at 871208 Board Meeting.Update of Tables 1-10 Which Includes All Pertinent Data Through End of SALP Period Also Encl ML20236X5801987-11-30030 November 1987 Comments on Draft Director'S Decision on Coalition for Responsible Energy Education 2.206 Petition Re Plant. Editorial Comments for Consideration Marked on Encl Draft ML20247G3591987-09-16016 September 1987 Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 25141987-09-16016 September 1987 Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 ML20237L7011987-08-31031 August 1987 Notification of 870909 Meeting W/Util in Bethesda,Md to Discuss Proposed Amend to Tech Specs Re Organizational Structure.Meeting Agenda Encl ML20195G3751987-08-21021 August 1987 Forwards Rept Re Licensing & Restart Schedules,Per EDO 870727 Memo.Info Will Be Provided Weekly ML20235V8251987-07-20020 July 1987 Notification of 870730 Meeting W/Util & C-E in Bethesda,Md to Discuss Licensee 870629 Submittal on Cycle 2 Reload 1999-08-27
[Table view] Category:NRC TO ASLP
MONTHYEARML20128J1721985-07-0808 July 1985 Forwards Util Application for SNM License.W/O Encl.Related Correspondence ML20127E9961985-06-20020 June 1985 Urges Substitution of Given Paragraph for Paragraph 1 on Page 8 of Applicant Proposed Initial Decision & Order Re Agricultural Effects of Cooling Tower Drift.Justification of Substitution Provided ML20129H6451985-06-0404 June 1985 Forwards Rev 4 to Util Salt Deposition Monitoring Program, Per 850603 Request.Rev Will Be Incorporated Into Full Power Licenses When Issued.Related Correspondence ML20128P4961985-05-30030 May 1985 Forwards Testimony of RB Samworth Per ASLB Request.Related Correspondence ML20128H4221985-05-23023 May 1985 Confirms 850522 Telcon W/Judge Lazo Re Permission to Defer Filing Testimony of R Samworth Due to Apparent Settlement of Contentions Between West Valley Agricultural Protection Counsil,Inc & Applicant.Related Correspondence ML20054F5811982-06-11011 June 1982 Advises That NRC Intends to Have R Gonzales Introduce Previously Filed Testimony During Hearings Scheduled to Commence on 820622.Rebuttal Testimony Not Presently Contemplated ML20148G1811978-10-30030 October 1978 Forwards 780929 & 780927 NRC Memos Re Recent Underwriters Lab Fire Protec Test to Demonstrate Effectiveness of Area Sprinklers & Mineral Wool Blanket Cable Tray Fire Barriers. (See ANO:7810050359 & 7810050373.) 1985-07-08
[Table view] |
Text
.h g.( ,% UNITED STATES RNO
, gg3 (' ;' ,g NUCLEAR REGULATORY COMMISSION !-
L /~f WASHINGTON, D. C. 20555 Aggl .
DeCKETED USNRC June 4, 1985 35 m 4 m g c: n- ..
~
Robert M. Lazo, Esq., Chairman Dr. Richard F. Cole .
Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Dr. Dixon Callihan James H. Carpenter Administrative Judge Administrative Judge Union Carbide Corporation Atomic Safety and Licensing Board P.O. Box Y U.S. Nuclear Regulatory Commission Oak Ridge, TN 37830 Washington, DC 20555 In the Matter of ARIZONA PUBLIC SERVICE COMPANY, ET AL.
(Palo Verde Nuclear Generating Station, Uniti 2 and 3)
Docket Nos. STN 50-529 and STN 50-530 c4
Dear Administrative Judges:
Pursuant to your request during our telephone conference call on June 3,1985, enclosed is Revision 4 of Applicants' Salt Deposition Monitoring Program which has been incorporated by reference in the Environmental Protection Plan for the full power license of Palo Verde Unit 1 that was issued on June 1, 1985. Revision 4 will also be incorporated in the full power licenses for Units 2 and 3 when they are issued.
Sincerely, b <
Lee S. Dewey Counsel for NRC Staff
Enclosure:
As Stated cc: w/ enclosure Service List 8506070626 850604 A PDR ADOCK 05000529 '
G PDR D(
o Arizona Nuclear Power Project P O. box 52034
May 17, 1985 Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528(License No. NPF-34)/529/530 .
Salt Drift Monitoring Plan File: 85-004-419.06: 85-056-026
Reference:
(1) Letter from E. E. Van Brunt, Jr., ANPP, to G. W. Knighton, NRC, (ANPP-32275) dated March 29, 1985,
Subject:
Salt Drift Monitoring.
(2) Letter from E. E. Van Brunt, JR., ANPP, to G. W. Knighton, NRC, (ANPP-32547) dated May 3, 1985,
Subject:
Salt Drift Monitoring.
(3) Letter from E. E. Van Brunt, Jr., ANPP, to G. W. Knighton, NRC, (ANPP-32651) dated May 16, 1985,
Subject:
Salt Drift Monitoring.
Dear Mr. Knighton:
Enclosed for your information is a copy of Revision 4 of the Salt Deposition and Impact Monitoring Plan for the Palo Verde Nuclear Generating Station Units 1, 2, and 3. This Revision 4 incorporates revisions to the monitoring plan previously provided in our letters, References (1), (2), and (3).
We request that the Evironmental Protection Plan (section 4.2.2) for the full power operating license reflect this Revision 4.
If you have any-questions, please contact W. F. Quinn of my staff.
Very truly yours, e b E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/WFQ/sih Enclosure cc: ~R. P. Zimmerman E. A. Licitra A. C. Gehr n
STATE OF ARIZONA )
) ss.
COUNTY OF MARICOPA)
I, Donald B. Karner, represent that I am Assistant Vice President, Nuclear Production of Arizona Nuclear Power Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
D
-\ ~ D % ;:..
8
\. ~
Donald B. Karner Sworn to before me this /7 day of '7Nd4! , 1985.
Yhckt (f 17LeOABC-
/ Notary Public My Commission Expires:
My Comm;isica Expiras April 6,1987
Salt Deposition and Impact Monitoring Plan for The Palo Verde Nuclear Generation Stations Units 1, 2, and 3
- (Rev. 4) .
Prepared For Arizona Public Service Company Prepared By NUS Corporation 910 Clopper Road Gaithersburg, Maryland-May 1985
^
e 4
s- ge . . , , , -
4-,,.e- y e - -- - , , - , ,.- % %- .-,, .....- ,.,%- ,y A.
Table of Contents -
Page 1.0 Introduction 1-1 2.0 Monitoring Program Design 1 2.1' Selection of Monitoring Locations 2-1 2.2 Sampling Methods 2-7 2.2.1 Soil Sampling 2-7
^
2.2.2 Indigenous and Agricultural Vegetation Sampling 2-8 2.2.3 Salt Deposition Sampling 2-9 2.?.4- irborne Salt Sampling 2-10 2.2.5 Sampling Schedule. 2-10 2.3 Sample Analysis 2-10 2.4 - Data Review 2-12 2.5 Quality ~ Assurance Program 2-12 Note: Changes to this document are noted in the margins on each page with
, identifying numbers representing the revision. The original issue was in February 1983; a Revision 1 was prepared but never issued, being' superseded by Revision 2, dated April 1983. <
m-
'; i- -
List of Tables Table
Page 1-1 Salt Monitoring Program for PVNGS 1-1 2-1 Summary of the Types of Sampling to be Performed for Each Sampling Location 2-4 2-2 Program Sampling Schedule 2-11 List of Figures
~ Figure ,
Page 1 Distribution of Soil and Dustfall Sampling Locations 2-3 -
2-2 Distribution of Vegetation Sampling Locations 2-6 O
9
-r --w.-, .--- -
1.0 INTRODUCTION
This document presents the design of an environmental monitoring program to determine the environmental impact, if any, due to salt drift from operation of the'PVNGS inechanical draft cooling towers. It'is designed to meet the com-mitment for a monitoring program contained in the Environmental Report, Con-
.struction Phase. Table 1-1 is a summary of this commitment.
Table 1-1. Salt Monitoring Program for PVNGSa Duration and Periodicity of Study Plant System Predicted
~
Physical Biotic Preoperation Operation Inducing Physical Parameter Indicator Period Period Change Change to be to be
' Monitored Monitored Drift from Foliar Airborne Salt Baseline Seasonal cooling deposition salt sensitive seasonal data until tower salt of salt plant data one level of species year prior impact to opera- determined tion a
Environmental Report - Construction Permit Stage, Section 6.2.5.
4 The monitoring program (1) determines levels ~ airborne salt deposition, (2) defines physical and chemical propertier surficial soils, (3) estimates species richness and cover and measures salt . .iing of the indigenous natural plant communities, and (4). measures salt loading and yield of cotton.
Comparisons of these parameters are made at sampling locations between the period prior to operation and the period during operation of one, two, and three units. There are also several control sites, which are used as back-ground locations not affected by operation of the cooling towers, that give an indication of any long term changes.
1-1
2.0 MONITORING PROGRAM DESIGN - - -
.This section presents a description of the program design and includes a dis-cussion of the selection of monitoring locations, sampling methods and equip- 3 ment, laboratory sample analyses, data review and report preparation, and quality assurance.
2.1 Selection of Monitoring Locations The. monitoring program.is conducted both onsite and offsite out to approxi-mately 20 miles from the cooling towers. Most of the sampling locations are at distances of five miles or less from the cooling towers. This 5-mile dis- '4 tance corresponds to that beyond which salt deposition is not predicted to
~
exceed about one pound per acre per year. Five control sites are included in the monitoring program to measure background levels of salt deposition at dis-tances unlikely to be significantly affected by PVNGS emissions.
Factors considered for the selection of these control site areas included an '2 examination of the potential influences from any of the surrounding topography and their proximity to significant sources of fugitive dust or particulate emissions such as industry. Two control sites are located approximately 20 miles to the northwest of the cooling towers and two other control sites approximately 15 miles to the southest of the cooling towers. One control site will be an agricultural area and the other will be in native desert 4
environment for each of these quadrants. A fifth native vegetation control site is located approximately 7 miles to the northwest of the cooling towers.
A total of 44 sampling locations were selected to meet the following objec-tives:
- o. Measure site-originated deposition via dustfall collection, and any changes in vegetation and/or soil chemistry at all nearby agricul-tural fields o Establish background data on salt ons f 2-1
o Provide salt deposition data that could possibly be correlated with 3 ongoing radiological and natural vegetation studies .
o Demonstrate that the monitoring program can detect site-originated sal't deposition and determine the geographical limit of detection 3
o Provide long-term control plots (at 15 to 20-mile distances and in gl
. directions that are _least frequently downwind of the cooling towers).
for detennining background variations in salt levels in the vicinity of PVNGS.
Figure 2-1 shows the approximate locations of the 44 sites for the monitoring 4 of salt deposition and soil sampling, including the 5 control locations used to determine background changes, if any, in salt levels. Table 2-1 presents a 3 summary of the types of sampling to be performed at each sampling location. At the 6 locations footnoted on Figure 2-1, the existing low-volume samplers used for the station radiological monitoring program are used to determine airborne salt concentrations. At 11 other locations near the site (see Figure 2-2),
sampling of the agricultural crops actually under cultivation are conducted.
At five onsite locations (1, 2, 3, 4 and 6), representative indigenous plant 4 communities of the site, which have been identified and monitored since 1976, are sampled semiannually (spring and fall). During June 1983, the native vege-tation communities at site number 5 were destroyed by fire. Site number 5 was then and is currently maintained as a sampling site for dustfall and soils only. The locations of these five communities, shown in Figure 2-2, provide 3 continuity with an ongoing baseline study of native vegetation (see Section 2.2.2.1). Soil and dustfall monitoring are also conducted at these locations.
'1 The monitoring program has 33 sampling locations within approximately 5 miles of the cooling towers. These locations were selected so that any measurable changes in deposition due to operation of the cooling towers woult Se detected by the monitoring program. Additionally, those sampling locations oriented
'toward the northeast of the towers correspond to the predicted direction for maximum deposition of salt. <
2-2
,.r -- -
hll* - %l . glQI. ,
r i t . /
,, l
. Fp hl,.'1l3 ** (, . t i. kp . g .
s . , . . i <
e / ,
- .lf - l
, . , ,7 i,;
mi. Vhg- e ; - \. .i g
- g f
- J. ! . l . ; . l
.,.I*j
- i. . l . , , .l .
y- -
-- -i. .
- -..,. .g ,. .l i>.
b,.,
.e. . . .
. . i t '... __%. {.i.J.p. A
. i ,. -
m _ ,_ : .* i 1.
a-. J. c .
m
. ; X', 44 . . ' p. .ts. 1 . - -
,. . l ', . . g,i . f.:- ,y %:l: n N ' .-T i,. K. ..!//i . !-
..!.4.i. gi Ap b, b, .- Q_
.. ., 2q-.. .. =~
-r M:
(I .
s . . .
,- .S m
.s.:..,.- .
b ,.,o b' % , eo h/
M\
j ...l.3 aE ., ., . 11 .
I' i
'l r
./A
.-4 .,/1:...f. . ,,v.g:.--
.81. g t.m.e.y .
, n h1.ff. - m'P. .' .'i@nW.
a f,.
.. f.. ,
. 1. . . . .
.t / 1 .. 7 . . . . . # f. . J. i .
L M C L ;' .;. L ' :- :C.}g: :n s.. y. . .). /. . .
.: . .r
.y.1 r . .
- .- 2d .4 ..
. s.-e. . . -. 4, .
4 s -
3: 4,o.c. 7 er7\\ i . h.'.: . is -. 1.n,u 'wg>yg/s^ ;B g mcn:
l V. n ., .
.,- .,2 n . -
.: < a n.
W
- w .ik VWAkta4.s'.,/.lQ;- f{
./ ' y. I 4,; & T . , ', \ Qgg k. l/I&. I h=
1 .,; '. .: ) ~M--% f6
'~
.Yl.;. W j ,
j
.(f (Q ' . i . - '
., . l/ ,'. , . .; .
- . .;. ., l .- 1
- A -
kl t _-ll a ,W. G- lii h r - .
?- ! '
I Q.' 5k
> ; ry
.- *\ >
.g).g
[ '. W\ '
~
I'~ / '
- , , 1j y
i
.Ek E! L '
.: .gA. 1
! 5 L_,
. I gf.!- f
. kw; .
.y .)]. .,.- w -
j
- l. . \._ _
i t. . . .g . i . y v. , irar Sy i .uy 1 . .
4 A ., .fm ~ . R . i . r- .n /1. : . w ; .,
i .
/ p- , j.. :. . !- x !, ' . >. / .; .,. . .jp , . M . q,'. . . . .c 9
- v. ; . . ./. p.,.al.i.i.i. e. ; j g. . ; N e . . . .
- F .I.cs. ! .m
! . ! .j .p / yt:,. ,:i @ gy.. . . ;-
-l , 7 5 . i .}n ./ . .R ., .
/ u., p hi s ,< : ,
g i.. r ..f !. . g .y/.s . .
v g, .
,<; o .n
~ . ~
. j .. s .,. .,. n, . .
. , 2-h
- g. g .,e. c i .f. .i... .,.
a~~i . ! %.s%
~
j l& /. T - --
-0. R . \ /,Ir E..s. - .
~% . :,.=. t N.t,,,; . . ... t. . !.g . y s. yI /, .;. ':i : -
e
. lfg a. v .i. g.,. .
.c -
.yh < n,- i 3.s .. . .
o .) y . , ?
.ig ,. .. ,. . . ,;. . r ... .i- . .'. ,. 1p :;
.l.j
- p. ./ ..
s=
.l. . . .
- f. . ....
Il;L, ' - 5 '5
., .n 5
.f' f ..
.-(. ., / -
,l. . . .
.,. 12 .
l 7 8 o
,,. l -
/- - -
41 4 . .
.i.i.t.. . c. ., ..- . ..- -
.i.q I
Table 2-1 --
Summary of the Types of Sampling to be Performed at Each Sampling Location Airborne Airborne Sampling Salts Via Salts Via Location Dustfall Native Low Volume No. . Collection Soils Vegetation Agricultural Samplers
. . ~ . - .
2 1 X X X 2' X X X 3 X X X 4 X X X Sa X X 6 X X X f 2
7 X X X
'8 X X X 9 X X X 10 X X X 11 X- X X 12 X X X 13 X X X 14 X X 15 X X 16 X X 17 X X 18 X X 19 X X 20 X X X 21 X X X 22 X X 23 X X X 24 X X X 25 X X X 26 X X 27 X X X 28 X X X 29 b
'30 X X X 31 X X X 32 X X X 33 X X 34 X X 35 X X 36 X X a
e 2-4
Table 2-1 (Continued) -
Summary of the Types of Sampling to be Performed at Each Sampling Location Airborne Airborne Sampling Salts Via Salts Via Location Dustfall Native Low Volume No. Collection Soils Vegetation Agricultural Samplers 37 X X 2 38- X X 39 X X 40 X X X 41 X X 42 X X X 43 X X X 44c X X X 4 45d X X X Total 44 44 8 13 6 aNative vegetation communities destroyed by fire in June 1983.
bDecommissioned during June 1984 Monitoring equipment was destroyed by agricultural activity.
cEstablished as .a native vegetation control site for salt bush. In May 1984, the saltbush plant community at site Number 42 was tilled and the land was converted to agricultural use sometime prior to May 1984.
dBegan operation in July 1984 to replace site Number 29.
Y B
2-5
,,. 4
' \,
r
$n
, .j . f. ;,/[p Nhl$
f lf',.\hh h' 'f.W
..' +t: ,
(( .I' n rPad Tit.
gew . '.r p Y,'P'ij.~
.Qs ip -Q' - !- jp
.j . j . .i.
- 1. .
. \ . ,1-pn . l .
- y. ii.n.w gogp$ w ->.n .
I- @A
~
?w't? ; " ;J!;li w(, ==
i.
q- _
_. .i./,
..y.sm7
., N i iW. '/. f. -
.y q . g m%.4 mlt i ! I i.., ,,'
.(. e*wj-li .i.i.
$* *f*l. .d f/ _ f,. .
>-l.
r
.b.-P. 3(*
- t. g.
,i ,
' ' ' ,! ' ' "j i, . F -tr--W d.:. 4.' . 9 s /. l y.
g&.
- n. i. I.%. w . - - .
.f, . . w -r;.m ge% '4Iy
. . 51.. %.m -_1 : a!.g. 2'-e . 'x! , ,
.p- . /. AMH.i 5 , 3, y,,_, ; . .t j.;.,(
_ m. , . a.. .x .i.
1 3MFA !.,' Mf .i , ...QO:.i r _
, . m. - .
3.----1. tq . .:n v 1 p-
- a. vme .>.g.
xp
t .,-- w r
W.-
- + \.t,n1
...a.._m v .'f -
Y .= .
.u
.w W.wiix 3 ', t .
rt kl. .
. v .. w A .
9:.'.ci. /- N - ,i . g
- wt % .vi.yen. w.
- . n eo, w, < .a.q.W.
ec p / :
s 7,
.s
- i. O . - -
/ -v g? .d .J . a ,,
gg_- w z t.Q;,; __r ; ; .r
-g w .
\: : . . c=y .
3 ,, y. 7 y
,v. > . -
-t ;{, (t... w . w.g. a yu
. m ,. .. ,. O a.i- 3 t, .r. a..k.. .,, ,.; m .g . : .:
y .- -+
- n. ; .y.y s.
. . r. x rr,. >. ,.. .
. m. >y.x ,.
i a p
.m m
..x !. . . ,1 . ..
<. ! i . . 1 ,t 3
-v. ; : p l. a.\.c n .
., .p-- ./yp .- . .
4 l ,
. m .i. . L w .; .w .
1
- . w. /
- f. u..
g n., . '. ,of .. - !, .:
gt g4 2
,3 .f .. . . . . .
i
- 7. . , , . .c 7y. . . , , . .i .
., k: a fr. i . f.rWf. c H.t .c . m . f,u-m %
. ... r 5 ,. . 3.g >I t
pw,, . . .. . ,.n . v , q, _.
,x P. .fr!
. u. a. . . -y ., . ,. y . .
- }
a w- ' i.
fz gl. }/-
i r- . .
? Jd . .
^ \ r N I ff .
.. i; r. .- . . c. .< . . ..
3 ,
g ,
- y. . ,ip -. >,
) ., .v ., .u . . . .
g a i .
t' E.
i
.g . . . . .j .. .
- f. ,.,. ..- .. ..- .
.g
.s f: / 2 5
.l. qi.y w ...
f,;
_ q.
. p . E . .
.n.3 .y. ... .
if . g. .
g=o
.- .y. m .y .y ;ll p:-ti. :
.! . /. .
.H .
4 . ..
- r. .
g.\
/ t..w .p.N
. -:- T.l-b O' I . i. . V ..
./
t ll9. I kJ .
.h .: Q'yi^ - yj}y b .
Il- -
lM N. A l
)
LA r lf' 'ti =h i k..:_;I l- -
1-l . .
- A ., Y.h ._ . . - \.
/..
\ . L *' .u. k ., .;. .. ', ;, ;
--lll l -- ,
l -.. l . ..
l l ...;llit... ps .} .
- r Additional criteria used as a basis for selection of the monitoring sites -.
included the specification of their location at a distance from roads adequate to minimize the collection of traffic-generated dust.
2.2 Samplino Methods The sampling methodologies presented below and described in further detail in the applicable work instructions are designed to assure valid data acquisition.
Five separate sampling methodologies are described; one for soils, twc for vegetation (indigenous and agricultural), and 'two for airborne salt.
2.2.1 Soil Sampling At each of the 44' monitoring locations, composite soil samples (based on 5 cores from each of 2 transects) are collected at the end of the dry season (July-August), and at the end of the wet season (normally February-March); an additional sampling is conducted e' all 13 agricultural sites after cotton defoliation. The sanpling procedure (Reference Work Instruction GO 5.2.16.1) follows the DOE Environmental Measurements Laboratory's HASL-300 Method for soil sampling,(1) and uses a soil auger to collect 3-inch diameter core samples in depth increments to 30 cm, which are divided into upper and lower segments. The depth to the break between upper and lower segments is determined in the field for uncultivated soils based on the depth to a textural change. Cores in cultivated areas are divided into equal upper and lower segments. All upper segments and all lower segments for each transect are separately combined to form 4 composites (2 depth increments for each of 2 transects) from each of which 2 samples are taken and labelled. One sample of each composite is shipped to the analytical laboratory for analysis and the other retained in storage.
2 (1) Department of Energy, Environmental Measurements Laboratory, EML Proce- i dures Manual, HASL-300, New York, NY, undated. l .
a 2-7
\
Q 1 .
2.2.2 Indigenous and Agricultural Vegetation Sampling --
2.2.2.1 Native Vegetation Representative native plant communities, which have been identified and moni-tored since 1976 to determine baseline conditions, are sampled semi-annually 4
(March /Apri!andAugust/ September). Eight vegetative study areas are sampled as depicted in Figure 2-2.
The indigenous plant communities of the PVNGS are dominated by creosote and salt bush. Associated with these are mesquite and several species of cacti.
The vegetative monitoring program conducted within the eight vegetative commun-ities (Reference Work Instruction SRO 5.2.32.2) includes:
o The measurement of species richness and relative cover. 4 o The measurement of salt loading in tissues of the dominant or co-dominant flora (other than cacti).
2.2.2.2 Crop Sampling At each of the 13 agricultural monitoring locations (Figure 2-2), agricultural 2 crops are sampled (Reference Work Instruction SR0 5.2.32.1) twice each growing season (e.g., June and September for cotton) prior to defoliation (or harvest) to determine the amount of plant tissue salt loading. Additionally, cotton L yield is obtained by collecting the seed and fiber (boll) from selected cotton plots (ReferenceWorkInstructionSR05.2.32.1) as well as from the Agricul-tural Stabilization Conservation Service.
2.2.2.3 Infrared Photography In addition to the quantitative vegetative analyses, both native vegetation and agricultural crops are monitored using infrared photography (Reference Work Instruction SRO 5.2.32.3). Aerial photography (false color infrared) is 4 performed to coincide with peak vegetative crop productivity for the principal crops grown in a 5-mile radius of PVNGS (e.g., August / September for cotton).
2-8
3 This methodology permits the detection of vegetative stress, confirmed by -
field inspection, whether due to natural or artificially induced (e.g., salt drift) conditions and provides a documented photographic record of existing environmental conditions.
2.2.3 Salt Deposition Sampling 3
The rate of salt deposition is measured by the collection of dustff.1 samples which are analyzed for salt content. The dustf all sampling (described in ASTM method 01739(2)) is accomplished by placing pairs of open jars at the selec-ted monitoring locations. Two jars are placed at each sampling location to provide an estimate of sample precision.
The jars are elevated approximately three feet above the ground on stands, with a bird ring placed around the edge of the jar to prevent birds from. perch-ing and contaminating the sample. This height differs from the recommended minimum height of eight feet presented in the ASTM method to permit the collec-tion of dustfall at the approximate plant crown height. A chemically inert 1 to 2 mm conical screen is hung above the maximum water level in the jars to keep out any potential contaminants such as insects.
The monthly sampling (Reference Work Instruction EMD 5.2.17.27) follows the ASTM method for collection of destfall. At the end of each month the jars are collected and replaced by a clean set of jars. The collected jars are rinsed to transfer the samples to shipping bottles which are labeled and sent to a laboratory for analysis. At least one inch of water is maintained in the jars to prevent collected dust from being blown out. The distilled water added to the jars contains 15 mg/ liter of copper sulfate as an algicide. An 18-inch deep ASTM jar used for dustfall collection is the most suitable collection jar for sampling in a desert environment; it requires less frequent checking and replenishment of the water level than other, shallower jars.
s (2) American Society of Testing and Materials (ASTM), Standard Method for Collection and Analysis of Dustfall (Settleable Particulates) 01739-70, Annual Book of ASTM Standards < Part 26, Philadelphia, PA.,1970.
2-9 L
r-e 2.2.4 Airborne Salt Sampling '
Airborne salt concentrations,are measured by collecting particles on a low- 3 volume particulate sampler. Measurements are taken from the six existing low volume samplers (Figure 2-1) being used as part of the radiological monitoring program. The samplers are made by Schmidt, Inc., and draw air through a 50 mm 4
diameter filter. The filters are collected weekly for radiological analysis and are composited for the additional chemical analyses on a monthly basis.
2.2.5 Sampling Schedule The monitoring program frequency for salt deposition is generally on a monthly basis. Although the low-volume particulate filters are collected weekly, the
~
filters collected during any one month are combined and processed as one collet-tive sample for each site. Other exceptions include: native vegetation, sampled twice each year, in March / April and in September / October; agricultural sampling in June / July and again with aerial photography in August / September; and soils sampled at the end of the rainy (normally February / March), and the 4
dry seasons (July / August) and post-defoliation (November). The dustfall samples l and low-volume sampler filters are analyzed on a regular monthly schedule.
Cooling tower basin water is sampled at least quarterly to provide the chemical composition data used as a basis for comparison with the analyses of deposited and airborne material samples. Table 2-2 summarizes the sampling schedule for components of the program.
2.3 Samole Analysis Samples collected during thi program are sent to selected laboratories for the indicated analyses. The laboratory procedures adopted for analysis of soi's, vegetation, water, and dustfall are documented. The procedures include the documentation of quality control checks on the instrumentation and the analyses.
2-10
=
t Table 2-2. Program Sampling Schedele --
COMPONENT MONTH J. F M A M J J A S 0 N D Particulate Dustfall X X X X X X X X X X X X Airborne Sant Concentration X X X X X X X X X X X X
~(Mo. Avg.)
4
. Soils X/X X/X X l Native Vegetation X/X X/X Crops X/X X/X 4 Aerial Infrared Photography X/X l Cooling Tower Basin Water X
~
X X X Soil samples are analyzed for the following: pH; soluble Na, Ca, K, Mg; B; exchangeable Na, Ca, K, Mg; electrical conductivity; SO 4 ", NO 3 , Cl , F, C0 3 , HCO 3 , NH4 + and P0 4 ". Textural analysis is performed once as part of a baseline characterization for each monitoring site. Native vegetation and crop samples are analyzed for Na, Ca, K, Mg and for as SO 4 ", 3NO , Cl , F and
- 4 PO4 l
The collected dustfall samples are analyzed for total suspended solids and the most significant components of the cooling tower blowdown (and drift) as iden-tified in Table 3.6-1 of the PVNGS ER-OL, Units 1-3. Since copper sulfate is used as an algicide, the analysis also includes copper.
Finally, cooling tower basin water is sampled and analyzed at least quarterly for the same major constituents as the dustfall samples and identified in Table 3.6-1 at the PVNGS ER-OL, Units 1-3, to confirm the composition of the drift (and blowdown). As a minimum, these include: Ca, Mg, Na, K, Cl , NO 3'
SO 4
", and Si. Additionally, minor constituents are quantitatively assessed to the extent possible.
2-11
'^
Interpretation of the aerial photography is conducted by qualified personnel. 3-Areas of apparent vegetative stress are delineated, and a field inspection l conducted to identify causal effects for all areas of apparent stress. If there are any environmental charyges, a map is prepared which indcates those areas.
2.4 Data Review 3
The reported data is examined by NUS for consistency. Suspicious data may prompt & request for a repeat analysis of the sample (s). Meteorological data are used.to ascertain that the pattern of salt deposition is consistent with the prevailing winds, stability classes, and precipitation over the period of sampling. Patterns of inconsistent data, or locations with large differences in the paired samples may indicate that the locations are subject to interfer-ences or tampering. Additional sampling or an alternate,. sampling location may-be. required for these locations. Once the individual data have been examined, timely summaries are prepared. Data are compared for discernible differences between the control samples.
Seasonal and annual summaries are prepared and the data examined for cor-relations with meteorological conditions over the period. Methods for demon-strating differences in the annual data include changes in the chloride to sodium ratios, and isopleths of annual concentrations. The evaluation of the control and plant vicinity differences includes analyses for correlation between salt deposition, airborne concentration, and changes in soll and/or plant chemistry. Detailed evaluation of changes in any of the three media (air, soil, plants) at one or more sampling locations are evaluated by ap-propriate statistical analyses.
2.5 Quality Assurance Proaram A comprehensive quality assurance program is essential for the successful con-duct of a good monitoring program. The quality control measures designed into the program include:
2-12
o' Colocated samples at each sampling location to determine sample pre- --
cision; t
o An observation and da.ta record for each sample; o The checking of the algicide concentration as an indication of_ sample integrity for dustfall samples; o Sampling at a range of distances from the cooling towers to show the -
-procedures are capable of detecting salt deposition and also for determining the limit of detection; o led written procedures for all aspects of the program 3
Written quality assurance procedures have been developed in accordance with the quality assurance requirements of APS. The laboratory quality assurance programs provide the required quality assurance checks on the sample analyses at the laboratory. An independent audit and inspection will be conducted to review the sampling methods and the techniques and records of the analytical laboratory.
2-13