Text
,
, _
_
_
_
_
__
_ - - - -
g(J) b
%
-
...
JUN 3
1985
Docket No.~ 50-454
Docket No. 50-455
Commonwealth Edison Company
,
ATTN: Mr. Cordell Reed
Vice President
,.
Post Office Box.767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. J. M. Hinds,
K. A. Connaughton, P. G. Brochman, R. Lerch, M. Ring, D. Hills, T. Reidinger,
D. Williams, M. Farber, B. Burgess, L. Hueter, and C. Gill of this office on
January 1 through March 26, April 6, 9, 10, and 12, 1985, of activities at
Byron Station, Units 1 and 2, authorized by NRC Operating License NPF-37 and
NRC Construction Permit CPPR-131 and to the discussion of our findings with
Mr. R. E. Querio and others of your staff at the conclusion of the inspection.
This also refers to.the management meetings conducted at Byron Station on
January 2, .16 and 30 and February 14 and 27,1985, concerning operating
. performance, schedules,. reportable events, and associated action plans.
Additionally, this refers to the enforcement conference conducted in our
office on April 29, 1985, relating to (1) the operation of Unit I with certain
protection system components not being seismically qualified, and (2) the
. adequacy of the technical review of test results.
The' enclosed copy of our inspection report identifies areas examined during
the inspection and discussed during the enforcement conference. Within these
-areas, the inspection consisted of a selective examination of procedures and
-
representative records, observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
violation of NRC requirements, as specified in the enclosed Appendix.
A written response is required. With regard to Item 2, we recognize that
the operator error was identified and corrected by the plant staff before
the technical specification time allowance for corrective action had elapsed;
however, such procedural errors are of concern to us and we therefore request
'
that in your response you thoroughly reflect the remedial measures taken by
both station and corporate personnel to preclude recurrence of such errors.
We carefully considered the need to pursue further escalated enforcement
' actions for those matters discussed during the enforcement conference;
however, based on the lack of safety significance, we have decided to not
,
pursue such actions.
Nevertheless, we believe the issues merit your close
'
examination to determine lessons that can be learned to avoid similar problems
$[M! N54
e
.
0DI
-
.
.
Commonwealth Edison Company
2
M3
1986
in the future. Along this line, in response to this letter please describe
your actions to assure all of your personnel involved in the review of test
results have been sensitized to the need for thorough, rigorous, and completely
documented reviews of test results.
-The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Oricinal signed by
Jams G. Keppler
James G. Keppler
Regional Administrator
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-454/85002(DRP);
No. 50-455/85001(DRP)
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D.- W. Cassel, Jr., Esq.
Diane Chavez, DAARE/ SAFE
W. Paton, ELD
L. 01shan, NRR LPM
H. S. Taylor, S&L, Head, Quality
Assurance Division
RIII
RIII RIII
RIII
RIII
RIII
RIII
RI"I
RIII
Forn[eyRlo v B7U
wn
N
Wl
C4iG 16c- Y
warnick
p Schultz
is Ke pler
H1nds/kja
LercySteeer
05/3d/85
f.y.c
S/31
f/1/
@/
W"
/
31 M
-
.
_
-
.-
.
.
-.
_
. .-
- . .